Block 8711, lot 017
1200 04th St
- City’s use
- Multi-Family Residential
- Built
- 2016
- Stories
- 6
- Units
- 177
- Building
- 328,225 sq ft
- Lot
- 78,408 sq ft
- Zoning
- NA
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
55 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 13, 2026 | Completed final sign-off Aug 2026 | 1200 04th St | Nelson Jameson Construction Inc | g/f -new partitions for lobby area and dog daycare space. new hvac distribution in lobby, daycare and hall. new plumbing fixtures for dog bathing area, break room and dog daycare room. new sink and cabinetry throughout. update finishes throughout. relocated light fixture.Details
g/f -new partitions for lobby area and dog daycare space. new hvac distribution in lobby, daycare and hall. new plumbing fixtures for dog bathing area, break room and dog daycare room. new sink and cabinetry throughout. update finishes throughout. relocated light fixture. | $300,000 |
| Dec 18, 2025 | In progress filed Dec 2025, not yet issued | 1200 04th St | mb360 block 5: replace part of cast-in-place concrete sidewalks w/ pavers and introduce additional landscape strips between the sidewalks to improve efficiency of the maintenance of the areas. locally adjust structural slabs at building entrances. accessibility work will be brought to compliance.Details
mb360 block 5: replace part of cast-in-place concrete sidewalks w/ pavers and introduce additional landscape strips between the sidewalks to improve efficiency of the maintenance of the areas. locally adjust structural slabs at building entrances. accessibility work will be brought to compliance. | $1,300,000 | |
| Feb 16, 2024 | Completed final sign-off May 2025 | 1200 04th St | Saarman Construction,Ltd. | block 5 roof memebrane and insulation. demo (e) roof membrane and insulation. provide vapor retarder, roof insulation with single ply roof membrane. repair possible wood rot at (e) wood crickets and wood/deck parapet framing.Details
block 5 roof memebrane and insulation. demo (e) roof membrane and insulation. provide vapor retarder, roof insulation with single ply roof membrane. repair possible wood rot at (e) wood crickets and wood/deck parapet framing. | $3,560,000 |
| Aug 30, 2021 | Expired or cancelled cancelled Jan 2026 | 1200 04th St | foundation repair: inject polyevel into port holes in grid fashion to lift surface. install nextuspro crack repair sealant.Details
foundation repair: inject polyevel into port holes in grid fashion to lift surface. install nextuspro crack repair sealant. | $45,021 | |
| Mar 4, 2021 | Completed final sign-off Jun 2021 | 1200 04th St | Ayoob & Peery Plumbing Co Inc | relocate existing and install new sprinkler heads due to interior renovations ref. 2019-0927-2964Details
relocate existing and install new sprinkler heads due to interior renovations ref. 2019-0927-2964 | $10,500 |
| Feb 8, 2021 | Completed final sign-off Jul 2021 | 1200 04th St | Commercial Fire Protection Inc | installation of new fire equipment in dentist office and programming. we will be putting in notification and duct detectors. i will be changing program on main facp.Details
installation of new fire equipment in dentist office and programming. we will be putting in notification and duct detectors. i will be changing program on main facp. | $30,000 |
| Sep 27, 2019 | Completed final sign-off Oct 2021 | 1200 04th St | City Building Inc. | ste c: ti of (n) dental office.build (n) non-bearing part. walls for reception area, 6 operatories,dr office staff lounge & other support areas.(n) gyp board ceiling & soffits.operatory room sinks & services, sinks will be installed throughout including 2 ada restrms, equip platform will be providedDetails
ste c: ti of (n) dental office.build (n) non-bearing part. walls for reception area, 6 operatories,dr office staff lounge & other support areas.(n) gyp board ceiling & soffits.operatory room sinks & services, sinks will be installed throughout including 2 ada restrms, equip platform will be provided | $252,800 |
| Sep 17, 2019 | Never finaled issued Sep 2019, no final | 1200 04th St | street spaceDetails
street space | ||
| Jul 9, 2019 | Completed final sign-off Jul 2019 | 1200 04th St | J M L Engineering & Construction | revision to pa 2018-0605-1007 retail tenant improvements on ground floor onlyDetails
revision to pa 2018-0605-1007 retail tenant improvements on ground floor only | |
| Apr 25, 2019 | Completed final sign-off Jun 2019 | 1200 04th St | Commercial Fire Protection Inc | ref pa# 201903226070; as built drawings as per field installation n/a maherDetails
ref pa# 201903226070; as built drawings as per field installation n/a maher | $19,000 |
| Mar 26, 2019 | Completed final sign-off May 2019 | 1200 04th St | Commercial Fire Protection Inc | update of existing fire sprinkler system as per new renovation in mattress firm. ref pa#201806051007Details
update of existing fire sprinkler system as per new renovation in mattress firm. ref pa#201806051007 | $65,000 |
| Mar 22, 2019 | Completed final sign-off Jun 2019 | 1200 04th St | Commercial Fire Protection Inc | additional fire alarm devices in mattress firm that is going to be connected to extg fire alarm system. 1 new booster power supply, 1 new smoke detector, 3 new duct detectors, 3 new horn strobe units, 2 new strobes.Details
additional fire alarm devices in mattress firm that is going to be connected to extg fire alarm system. 1 new booster power supply, 1 new smoke detector, 3 new duct detectors, 3 new horn strobe units, 2 new strobes. | $19,000 |
| Mar 15, 2019 | Completed final sign-off Apr 2019 | 1200 04th St | Ayoob & Peery Plumbing Co Inc | ground floor: add 6 relocate 16 sprinklers to conform with the new wall/ceiling layout of the t.i.Details
ground floor: add 6 relocate 16 sprinklers to conform with the new wall/ceiling layout of the t.i. | $6,450 |
| Mar 11, 2019 | Never finaled issued Mar 2019, no final | 1200 04th St | street spaceDetails
street space | ||
| Feb 8, 2019 | Never finaled issued Mar 2019, no final | 1200 04th St | Integrated Sign Installations Inc | #f - to erect electric, wall, single faced sign. install (1) illuminated single faced wall sign healthy spot ** maher: n/a **Details
#f - to erect electric, wall, single faced sign. install (1) illuminated single faced wall sign healthy spot ** maher: n/a ** | $4,000 |
| Feb 8, 2019 | Never finaled issued Mar 2019, no final | 1200 04th St | Integrated Sign Installations Inc | #f - to erect electric, projecting, double faced sign. install (2) illuminated double faced projecting wall signs ** maher: n/a **Details
#f - to erect electric, projecting, double faced sign. install (2) illuminated double faced projecting wall signs ** maher: n/a ** | $5,000 |
| Feb 6, 2019 | Completed final sign-off Jul 2024 | 1200 04th St | Commercial Fire Protection Inc | additional fire alarm devices in dog day care that will be connected to (e) fire alarm system.Details
additional fire alarm devices in dog day care that will be connected to (e) fire alarm system. | $12,000 |
| Feb 1, 2019 | Never finaled issued Feb 2019, no final | 1200 04th St | street spaceDetails
street space | ||
| Dec 14, 2018 | Never finaled issued Feb 2019, no final | 1200 04th St | Discount Signs & Neon Inc | install 1 non-illuminated, non electric, projecting, double-faced sign. "mattress firm". maher n/a.Details
install 1 non-illuminated, non electric, projecting, double-faced sign. "mattress firm". maher n/a. | $2,500 |
| Dec 14, 2018 | Never finaled issued Feb 2019, no final | 1200 04th St | Discount Signs & Neon Inc | install 1 illuminated, electric, single-faced wall sign. "mattress firm". maher n/a.Details
install 1 illuminated, electric, single-faced wall sign. "mattress firm". maher n/a. | $4,000 |
| Oct 26, 2018 | Never finaled issued Oct 2018, no final | 1200 04th St | streetspaceDetails
streetspace | ||
| Oct 26, 2018 | Completed final sign-off Jan 2019 | 1200 04th St | Saarman Construction,Ltd. | bpa for exploratory work of water-damaged areas along street-facing exterior and courtyard interior walls; wall openings ~ 3'x3'; repairs to be made in-kind.Details
bpa for exploratory work of water-damaged areas along street-facing exterior and courtyard interior walls; wall openings ~ 3'x3'; repairs to be made in-kind. | $220,000 |
| Sep 20, 2018 | Completed final sign-off Aug 2019 | 1200 04th St | Premier Structures Inc | 1st time tenant improvement - pet supply store/grooming - new partitions, ceiling, flooring, new concrete floor slab, electrical plumbing, hvac, new restroom. sprinklers, fire alarm, signage under sep permit. **maher na**Details
1st time tenant improvement - pet supply store/grooming - new partitions, ceiling, flooring, new concrete floor slab, electrical plumbing, hvac, new restroom. sprinklers, fire alarm, signage under sep permit. **maher na** | $250,000 |
| Jul 10, 2018 | Completed final sign-off Jul 2018 | 1200 04th St | Red Hawk Fire & Security Ca Llc | fire alarm as built for 201702088896Details
fire alarm as built for 201702088896 | |
| Jun 5, 2018 | Completed final sign-off Jul 2019 | 1200 04th St | J M L Engineering & Construction | tenant improvement of existing space on 2nd floor. non-structural ti mep. ** maher n/a**Details
tenant improvement of existing space on 2nd floor. non-structural ti mep. ** maher n/a** | $326,115 |
| Apr 24, 2018 | Completed final sign-off Jun 2018 | 1200 04th St | Saarman Construction,Ltd. | perform water testing investigation at 5 locations throughout complex. perform stucco and concrete opening of approx 3x3 ea. repairs to be made in kindDetails
perform water testing investigation at 5 locations throughout complex. perform stucco and concrete opening of approx 3x3 ea. repairs to be made in kind | $165,000 |
| Apr 2, 2018 | Completed final sign-off Jun 2018 | 1200 04th St | Saarman Construction,Ltd. | perform water testing investigation @ 324 stack to identify sources of leaks. perform in-kind replacement of stucco and concrete where removedDetails
perform water testing investigation @ 324 stack to identify sources of leaks. perform in-kind replacement of stucco and concrete where removed | $48,000 |
| Mar 30, 2018 | Never finaled issued Apr 2018, no final | 1200 04th St | street spaceDetails
street space | ||
| Feb 8, 2017 | Completed final sign-off Jul 2018 | 1200 04th St | Red Hawk Fire & Security Ca Llc | 1/f: add 3 horn/strobes, add 5 strobes, add 2 weatherproof horn/strobes, add 2 duct detectors. ref 201608094564; maher ord 155-13 naDetails
1/f: add 3 horn/strobes, add 5 strobes, add 2 weatherproof horn/strobes, add 2 duct detectors. ref 201608094564; maher ord 155-13 na | $10,000 |
| Jan 4, 2017 | Completed final sign-off Mar 2017 | 1200 04th St | Allied Fire Protection | 1st fl- fire sprinklers 44 added pendents, 2 relocated fire sprinklers uprights; ref 201608094564 maher naDetails
1st fl- fire sprinklers 44 added pendents, 2 relocated fire sprinklers uprights; ref 201608094564 maher na | $23,700 |
| Nov 10, 2016 | Never finaled issued Nov 2016, no final | 1200 04th St | street spaceDetails
street space | ||
| Sep 14, 2016 | Completed final sign-off Mar 2017 | 1200 04th St | Golden Gate Sign Company Inc. | erect (1) single faced internally channel letters sign. n/a ordinance #155-13Details
erect (1) single faced internally channel letters sign. n/a ordinance #155-13 | $5,000 |
| Sep 14, 2016 | Completed final sign-off Mar 2017 | 1200 04th St | Golden Gate Sign Company Inc. | erect (1) double faced internally illuminated blade sign. n/a ordinance #155-13Details
erect (1) double faced internally illuminated blade sign. n/a ordinance #155-13 | $5,000 |
| Aug 9, 2016 | Never finaled issued Nov 2016, no final | 1200 04th St | J & K Project Mgmt Consultants Llc | tenant improvement for a 3,980 sq ft yoga studio (suite d and e). work to include interior walls & ceilings, men & women's locker rooms, mechanical, electrical and plumbing (mahner ordinance n/a)Details
tenant improvement for a 3,980 sq ft yoga studio (suite d and e). work to include interior walls & ceilings, men & women's locker rooms, mechanical, electrical and plumbing (mahner ordinance n/a) | $275,000 |
| May 26, 2016 | Never finaled issued May 2016, no final | 1200 04th St | streetspaceDetails
streetspace | ||
| Dec 30, 2015 | Never finaled issued Dec 2015, no final | 1200 04th St | Weidner Architectural Signage | evacuation plan map signs (44 total) 14" x 20". maher naDetails
evacuation plan map signs (44 total) 14" x 20". maher na | $12,002 |
| Sep 21, 2015 | Never finaled issued Sep 2015, no final | 1200 04th St | street space permit - renewal of permit#3 ms39247Details
street space permit - renewal of permit#3 ms39247 | ||
| May 22, 2015 | Never finaled issued May 2015, no final | 1200 04th St | street spaceDetails
street space | ||
| Mar 12, 2015 | Never finaled issued Mar 2015, no final | 1200 04th St | street space permitDetails
street space permit | ||
| Nov 21, 2014 | Never finaled issued Nov 2014, no final | 1200 04th St | street space permitDetails
street space permit | ||
| Jul 24, 2014 | Completed final sign-off Jul 2015 | 1200 04th St | Suffolk Constr Co. Inc. Dba Suffolk-Roel | plans to comply with engineer's assessment of repairs needed to address nov #2014573491 as necessary to proceed with work approved under pa# 201202073728. ** maher: compliance with ordinance no# 155-13 not required **Details
plans to comply with engineer's assessment of repairs needed to address nov #2014573491 as necessary to proceed with work approved under pa# 201202073728. ** maher: compliance with ordinance no# 155-13 not required ** | $1,166,944 |
| May 19, 2014 | Never finaled issued May 2014, no final | 1200 04th St | street spaceDetails
street space | ||
| May 9, 2014 | Completed final sign-off Aug 2016 | 1200 04th St | Weidner Architectural Signage | non electric canopy sign. maher ordinance # 155-13 not requiredDetails
non electric canopy sign. maher ordinance # 155-13 not required | $6,928 |
| May 9, 2014 | Never finaled issued Jun 2014, no final | 1200 04th St | Weidner Architectural Signage | electric double faced projecting sign. compliance with ordinance 155-13 not required.Details
electric double faced projecting sign. compliance with ordinance 155-13 not required. | $16,094 |
| May 9, 2014 | Never finaled issued Jun 2014, no final | 1200 04th St | Weidner Architectural Signage | electric projecting double faced sign. compliance with ordinance no. 155-13 not required.Details
electric projecting double faced sign. compliance with ordinance no. 155-13 not required. | $24,602 |
| May 9, 2014 | Completed final sign-off Aug 2016 | 1200 04th St | Weidner Architectural Signage | non electric wall sign. compliance with ordinance 155-13 not required.Details
non electric wall sign. compliance with ordinance 155-13 not required. | $1,024 |
| May 8, 2014 | Never finaled issued May 2014, no final | 1200 04th St | street spaceDetails
street space | ||
| Mar 18, 2014 | Completed final sign-off Jul 2015 | 1200 04th St | Evans Brothers Inc | partially comply with nov 201457391. remove all woodframe debris above the podium level. clean and provide acess to reassess damaged podium. post tension secure, job site, and provide pedestrian protectionDetails
partially comply with nov 201457391. remove all woodframe debris above the podium level. clean and provide acess to reassess damaged podium. post tension secure, job site, and provide pedestrian protection | $150,000 |
| Nov 21, 2013 | Completed final sign-off Nov 2015 | 1200 04th St | Suffolk Constr Co. Inc. Dba Suffolk-Roel | revision to the approved & issued s-3 architectural for pa#201202073728. convert the (e) storage rooms back to elevator control rooms. all work done are entirely inside the building. ** maher: compliance with ordinance no# 155-13 not required **Details
revision to the approved & issued s-3 architectural for pa#201202073728. convert the (e) storage rooms back to elevator control rooms. all work done are entirely inside the building. ** maher: compliance with ordinance no# 155-13 not required ** | $10,000 |
| Nov 12, 2013 | Never finaled issued Nov 2013, no final | 1200 04th St | street spaceDetails
street space | ||
| Sep 16, 2013 | Completed final sign-off Feb 2016 | 1200 04th St | Suffolk Constr Co. Inc. Dba Suffolk-Roel | revision to the approved & issued pa# 2012/02/07/3728 s-3 (architectural) facade details to comply with final ocii review comments.Details
revision to the approved & issued pa# 2012/02/07/3728 s-3 (architectural) facade details to comply with final ocii review comments. | |
| Sep 11, 2013 | Expired or cancelled cancelled Nov 2024 | 1200 04th St | Tricon Aquatics | revision to pa #201202073728s3, spa finishes only.Details
revision to pa #201202073728s3, spa finishes only. | |
| Feb 27, 2013 | Completed final sign-off Aug 2016 | 1200 04th St | Rcm Fire Protection Inc. | install new 8" ductile iron underground fire line main piping 5'-0" out from bldg which shall meet the fire service requirements from city of sf.Details
install new 8" ductile iron underground fire line main piping 5'-0" out from bldg which shall meet the fire service requirements from city of sf. | $5,000 |
| Mar 13, 2012 | Completed final sign-off Sep 2015 | 1200 04th St | indicator piles for site permit #2012-0207-3728Details
indicator piles for site permit #2012-0207-3728 | $567,000 | |
| Feb 7, 2012 | Completed final sign-off Dec 2017 | 1200 04th St | to erect 6 story, 172 units apartments, retail & parking building.Details
to erect 6 story, 172 units apartments, retail & parking building. | $56,516,320 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Commercial Fire Protection Inc (5), Weidner Architectural Signage (5), Saarman Construction,Ltd. (4), Suffolk Constr Co. Inc. Dba Suffolk-Roel (3), Ayoob & Peery Plumbing Co Inc (2), Discount Signs & Neon Inc (2), Golden Gate Sign Company Inc. (2), Integrated Sign Installations Inc (2), J M L Engineering & Construction (2), Red Hawk Fire & Security Ca Llc (2), Allied Fire Protection, City Building Inc., Evans Brothers Inc, J & K Project Mgmt Consultants Llc, Nelson Jameson Construction Inc, Premier Structures Inc, Rcm Fire Protection Inc., Tricon Aquatics
- Architects
- Darin J. Schoolmeester (3), Marzieh Emani Ghoreishi, Michael Thomas Fries, Richard Sweers Ii, S. Gara Aia, Sandy Sxi-Ai Blair, Willem Clark
- Engineers
- Allana Karim, Cristobal Paniagua, Ernesto Pluti, Gasil E. Aldepulla, Jacqueline Lingwei Luk, Klitz Gerald Gonzalez, Kristopher Sanchez Cercena, Marko Ijke Schotanus, Masoud Salamat, Steve Kang, Wenda Wang
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.