Block 0323, lot 015
480 Ellis St
- City’s use
- Commercial Hotel
- Built
- 1908
- Stories
- 4
- Units
- 154
- Rooms
- 55 bathrooms
- Building
- 65,926 sq ft
- Lot
- 18,906 sq ft
- Zoning
- RC4
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
61 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 16, 2026 | In progress issued Apr 2026 | 480 Ellis St | Drycrew Restoration Contractor | units 442 500 sq ft, unit 342 300 sqft, unit 242 300 sq ft demolition of drywall due to water damage, and demo of drywall in flr 3 and flr 2 hallways, 70 sq ft.Details
units 442 500 sq ft, unit 342 300 sqft, unit 242 300 sq ft demolition of drywall due to water damage, and demo of drywall in flr 3 and flr 2 hallways, 70 sq ft. | $10,000 |
| Jul 31, 2025 | In progress filed Jul 2025, not yet issued | 480 Ellis St | Freestone Reconstruction Inc | replace (e) secondary lobby entry system with (n) existing system has fob and buzzer and so will (n) systemDetails
replace (e) secondary lobby entry system with (n) existing system has fob and buzzer and so will (n) system | $90,000 |
| Jul 29, 2024 | Completed final sign-off Dec 2024 | 480 Ellis St | Smart Building Inc. | replace approx 1600 sqft of single layered 5/8" drywall on the 2nd floor hallway, includes replacement of insulation an application of tape, mud, testure, primer, paint. to comply with nov#202424599 dated 06/17/2024. once completed contact housing inpspector@ 628-652-3700Details
replace approx 1600 sqft of single layered 5/8" drywall on the 2nd floor hallway, includes replacement of insulation an application of tape, mud, testure, primer, paint. to comply with nov#202424599 dated 06/17/2024. once completed contact housing inpspector@ 628-652-3700 | $12,500 |
| Jun 11, 2024 | In progress issued Jun 2024 | 480 Ellis St | Ideal Restoration Inc | removal of wallboard in common hallways due to water damage. repair and patch back of finishes under separate permit.Details
removal of wallboard in common hallways due to water damage. repair and patch back of finishes under separate permit. | $320,260 |
| Aug 30, 2023 | Completed final sign-off Jun 2026 | 480 Ellis St | Freestone Reconstruction Inc | replace (e) secondary inter lobby entry system @ arlington w/new secondary inter lobby entry system, (e) assembly sys is operated w/door buzzer;new door/window assembly sys will also operate by buzzer or fob. ada approach & access is met w/(e) assembly system, new sys will meet ada approach & accessDetails
replace (e) secondary inter lobby entry system @ arlington w/new secondary inter lobby entry system, (e) assembly sys is operated w/door buzzer;new door/window assembly sys will also operate by buzzer or fob. ada approach & access is met w/(e) assembly system, new sys will meet ada approach & access | $90,000 |
| Dec 20, 2022 | Completed final sign-off May 2025 | 488 Ellis St | San Francisco Fire Protection | ref pa# 2021-1220-4709: install power supply, smoke detectors, pull stations, monitoring module, relay module, horn/strobes.Details
ref pa# 2021-1220-4709: install power supply, smoke detectors, pull stations, monitoring module, relay module, horn/strobes. | $10,000 |
| Dec 1, 2022 | Expired or cancelled cancelled Jan 2026 | 488 Ellis St | 4-Mac Construction | revision to mechanical system for approved permit #202112204709. additional information provided for water redirection framing plan @ ceiling.Details
revision to mechanical system for approved permit #202112204709. additional information provided for water redirection framing plan @ ceiling. | $20,000 |
| Oct 17, 2022 | Completed final sign-off Apr 2023 | 488 Ellis St | International Fire Equipment Co Incorpor | revision to permit 202207198757. new drop ceiling, keep uprights, add 14 recess using ti outlets to protect below drop ceiling.Details
revision to permit 202207198757. new drop ceiling, keep uprights, add 14 recess using ti outlets to protect below drop ceiling. | $10,000 |
| Jul 19, 2022 | Never finaled issued Jul 2022, no final | 488 Ellis St | International Fire Equipment Co Incorpor | t.i. add 5 recessed heads in the spaces with new drop ceiling/commercial space only with underground work. street level.Details
t.i. add 5 recessed heads in the spaces with new drop ceiling/commercial space only with underground work. street level. | $7,000 |
| Dec 20, 2021 | Never finaled issued Oct 2022, no final | 488 Ellis St | 4-Mac Construction | tenant improvement to (e) open office space at lower level space. additional scope includes installing drain pan underneath ceiling to address water from units above. new parttion walls,cubicles, drop ceiling at new office.Details
tenant improvement to (e) open office space at lower level space. additional scope includes installing drain pan underneath ceiling to address water from units above. new parttion walls,cubicles, drop ceiling at new office. | $120,000 |
| Oct 4, 2019 | Never finaled issued Dec 2019, no final | 470 Ellis St | J & L Construction Co., Innovative Construction Implement | minor ti to (e) open office space & meeting room @ lower level floor & (e) break room @ mezzanine floor. this includes cabinet replacements, 7 (n) pendant lights, replacement passage doors & swing direction of (e) front doors. (e) hvac system to remainDetails
minor ti to (e) open office space & meeting room @ lower level floor & (e) break room @ mezzanine floor. this includes cabinet replacements, 7 (n) pendant lights, replacement passage doors & swing direction of (e) front doors. (e) hvac system to remain | $45,000 |
| Sep 27, 2018 | Never finaled issued Sep 2018, no final | 480 Ellis St | street space | ||
| Aug 10, 2015 | Never finaled issued Aug 2015, no final | 480 Ellis St | Interstate Restoration California Lp | insulation-drywall 5/8 type x flooring 'wooden"-paint flood repair work only, no structuralDetails
insulation-drywall 5/8 type x flooring 'wooden"-paint flood repair work only, no structural | $20,000 |
| Jun 1, 2015 | Completed final sign-off Jun 2015 | 480 Ellis St | Interstate Restoration California Lp | units: 312 - 212- 313: insulation repair by patching drywall,paint cove base # 313 cove base paint # 312. drywall repair paint base board cove base # 212 waiting area (front desk) n/a maher ord. 155-13Details
units: 312 - 212- 313: insulation repair by patching drywall,paint cove base # 313 cove base paint # 312. drywall repair paint base board cove base # 212 waiting area (front desk) n/a maher ord. 155-13 | $6,000 |
| Mar 16, 2015 | Completed final sign-off Mar 2015 | 480 Ellis St | Interstate Restoration California Lp | drywall repair in lobby (patch work) in residential area only.Details
drywall repair in lobby (patch work) in residential area only. | $2,000 |
| Oct 8, 2014 | Completed final sign-off Nov 2014 | 484 Ellis St | International Fire Equip | install ul 300 fire systemDetails
install ul 300 fire system | $2,500 |
| Sep 19, 2014 | Completed final sign-off Nov 2014 | 484 Ellis St | Pacific Auxiliary Fire Alarm | 1st floor: add 1 horn/strobe and 1 module to extg fire alarm due to a t.i. ref app#201403130690/ n/a maher ordinance # 155-13Details
1st floor: add 1 horn/strobe and 1 module to extg fire alarm due to a t.i. ref app#201403130690/ n/a maher ordinance # 155-13 | $2,000 |
| Aug 27, 2014 | Never finaled issued Aug 2014, no final | 484 Ellis St | Plumbworks Inc. /Chris Goodwin Plumbing | add 5 heads to existing system at drop ceiling. ref. appl. 2014.0313.0690. maher n/a.Details
add 5 heads to existing system at drop ceiling. ref. appl. 2014.0313.0690. maher n/a. | $3,000 |
| Aug 15, 2014 | Never finaled issued Aug 2014, no final | 484 Ellis St | street space and meter (mta) | ||
| May 5, 2014 | Never finaled issued May 2014, no final | 484 Ellis St | mta lf | ||
| Mar 13, 2014 | Completed final sign-off Dec 2014 | 484 Ellis St | S M Construction And Assoc | new restaurant in extg tenant space. change of use from pharmacy to restaurant. tenant improvements : construct new walls, plumbing, power, lighting,doors and install new finishes. n/a for the maher ordinance #155-13Details
new restaurant in extg tenant space. change of use from pharmacy to restaurant. tenant improvements : construct new walls, plumbing, power, lighting,doors and install new finishes. n/a for the maher ordinance #155-13 | $55,000 |
| Sep 24, 2013 | Completed final sign-off Oct 2013 | 486 Ellis St | Plumbworks Inc. /Chris Goodwin Plumbing | relocate 2 heads for bathrooms. bldg app#201308214930Details
relocate 2 heads for bathrooms. bldg app#201308214930 | $1,500 |
| Sep 20, 2013 | Never finaled issued Sep 2013, no final | 486 Ellis St | San Francisco Fire Protection | ground floor at new art gallery - 3 new horn/strobes & 2 strobes will be installed & tie-in to existing notification circuit. t.i. #2013.08.21.4930Details
ground floor at new art gallery - 3 new horn/strobes & 2 strobes will be installed & tie-in to existing notification circuit. t.i. #2013.08.21.4930 | $1,800 |
| Aug 26, 2013 | Completed final sign-off Nov 2013 | 486 Ellis St | M C Mechanical | modification to existing building. hvac on ground floor to provide (2) new heating 2-pipe fan coil units.Details
modification to existing building. hvac on ground floor to provide (2) new heating 2-pipe fan coil units. | $10,000 |
| Aug 21, 2013 | Completed final sign-off Nov 2013 | 486 Ellis St | M-Projects | interior remodel of 486-488 ellis st for art gallery use m to a occup. work to include: (2) ada bathrooms, minor partition walls, new lighitng, bldg is fully sprinklered. full seismic upgrade done under ref pa# 200811076130. all ada to space under pa# 201306179736. sep hvac, sprinkler, life safetyDetails
interior remodel of 486-488 ellis st for art gallery use m to a occup. work to include: (2) ada bathrooms, minor partition walls, new lighitng, bldg is fully sprinklered. full seismic upgrade done under ref pa# 200811076130. all ada to space under pa# 201306179736. sep hvac, sprinkler, life safety | $120,000 |
| Aug 7, 2013 | Never finaled issued Aug 2013, no final | 470 Ellis St | Pacific Auxiliary Fire Alarm | ground floor & mezz - add 1 horn/strobe, 1 strobe & 2 duct detectors due to a t.i. ref pa #2013.05.16.7078Details
ground floor & mezz - add 1 horn/strobe, 1 strobe & 2 duct detectors due to a t.i. ref pa #2013.05.16.7078 | $3,000 |
| Jun 17, 2013 | Completed final sign-off Dec 2013 | 480 Ellis St | Swinerton Builders | revision to app#200811076130.changing residential unit bathroom doors from bifold to swing or accordion doors. changing layout of kitchenettes in units#203,214,215,217,218,226,227,330,314,315,316,317,318,326,327,403,414,416,417,418,426,427. changing layout at antorio alley exit door 133b.Details
revision to app#200811076130.changing residential unit bathroom doors from bifold to swing or accordion doors. changing layout of kitchenettes in units#203,214,215,217,218,226,227,330,314,315,316,317,318,326,327,403,414,416,417,418,426,427. changing layout at antorio alley exit door 133b. | |
| Jun 17, 2013 | Completed final sign-off Dec 2013 | 480 Ellis St | Swinerton Builders | revision to app#200811076130.demolish non complying toilet facilities in 488 and 486 ellis st spaces.demolish extg damaged wood joists and replace with concrete slab on grade. demolish mezzanine and mezzanine stairs at 486 ellis st. revise hardships 4 and 5 and remove hardships 6 & 7Details
revision to app#200811076130.demolish non complying toilet facilities in 488 and 486 ellis st spaces.demolish extg damaged wood joists and replace with concrete slab on grade. demolish mezzanine and mezzanine stairs at 486 ellis st. revise hardships 4 and 5 and remove hardships 6 & 7 | |
| May 28, 2013 | Completed final sign-off Jul 2013 | 468 Ellis St | Pacific Auxiliary Fire Alarm | ground floor - add two horn/strobes, 1 strobe, 1 monitor module & 1 control relay & relcoate 1 existing horn/strobe as part of t.i., ref pa #2012.11.09.3944Details
ground floor - add two horn/strobes, 1 strobe, 1 monitor module & 1 control relay & relcoate 1 existing horn/strobe as part of t.i., ref pa #2012.11.09.3944 | $3,400 |
| May 16, 2013 | Completed final sign-off Sep 2013 | 470 Ellis St | Raum | remodel of tenant suite including demolition & constructionof offices, breakroom, lighting, hvac, finishes & unisex accessible restroom. no changes to building envelopeDetails
remodel of tenant suite including demolition & constructionof offices, breakroom, lighting, hvac, finishes & unisex accessible restroom. no changes to building envelope | $65,000 |
| Feb 13, 2013 | Completed final sign-off May 2013 | 468 Ellis St | International Fire Equip | install ul300 fire system, ref #2012.11.09.3944Details
install ul300 fire system, ref #2012.11.09.3944 | $1,000 |
| Nov 9, 2012 | Completed final sign-off Jul 2013 | 468 Ellis St | Bonilla Construction | tenant improvement to renovate for new pizza restaurant in existing building vacant ground floor commercial space. installation of type 1 hood. sprinklers, ul300 system separate permitsDetails
tenant improvement to renovate for new pizza restaurant in existing building vacant ground floor commercial space. installation of type 1 hood. sprinklers, ul300 system separate permits | $70,000 |
| Aug 16, 2012 | Never finaled issued Aug 2012, no final | 480 Ellis St | street space permit. | ||
| May 18, 2012 | Never finaled issued May 2012, no final | 480 Ellis St | street space. | ||
| Apr 25, 2012 | Completed final sign-off Jun 2013 | 480 Ellis St | Swinerton Builders | revision to app#200811076130. venting for emergency generator.Details
revision to app#200811076130. venting for emergency generator. | $2,000 |
| Jan 5, 2012 | Completed final sign-off Jun 2013 | 484 Ellis St | Swinerton Builders | tenant improvement to construct phamracy in ground floor commercial spaceDetails
tenant improvement to construct phamracy in ground floor commercial space | $65,000 |
| Nov 30, 2011 | Completed final sign-off May 2013 | 480 Ellis St | Maguire Inc Dba Lahue And Associates | evacuation signs for 1st, 2nd, 3rd, 4th, roof, basementDetails
evacuation signs for 1st, 2nd, 3rd, 4th, roof, basement | $1,800 |
| Nov 17, 2011 | Never finaled issued Nov 2011, no final | 480 Ellis St | street space permit. | ||
| Oct 11, 2011 | Completed final sign-off Jun 2013 | 480 Ellis St | Swinerton Builders | rev. to pa# 2008.11.07.6130. reconfiguring ground fl ooffice arae , 3 restrooms. adding bike storage for residents. moving the unisex bathrm from lobby to tenent at 484 ellis,making the gas meter roo largerDetails
rev. to pa# 2008.11.07.6130. reconfiguring ground fl ooffice arae , 3 restrooms. adding bike storage for residents. moving the unisex bathrm from lobby to tenent at 484 ellis,making the gas meter roo larger | |
| May 23, 2011 | Completed final sign-off Mar 2013 | 480 Ellis St | Pribuss Engineering Inc | fire sprinkler ti. add 287 sprinklers. relocate 382, change out 178 sprinkler heads. total 847 heads.Details
fire sprinkler ti. add 287 sprinklers. relocate 382, change out 178 sprinkler heads. total 847 heads. | $258,140 |
| May 16, 2011 | Never finaled issued May 2011, no final | 480 Ellis St | street space permit. | ||
| Jan 19, 2011 | Completed final sign-off Mar 2013 | 480 Ellis St | Pacific Auxiliary Fire Alarm | installation of a new fire alarm system.Details
installation of a new fire alarm system. | $140,000 |
| Jun 23, 2009 | Completed final sign-off Jun 2009 | 470 Ellis St | San Francisco Fire Protection | renew pa# 2005/02/02/4578 to obtain final inspection. all work has been completed.Details
renew pa# 2005/02/02/4578 to obtain final inspection. all work has been completed. | |
| Jun 23, 2009 | Completed final sign-off Jun 2009 | 480 Ellis St | San Francisco Fire Protection | renew pa# 2007/01/19/2020 to obtain final inspection. all work has been completed.Details
renew pa# 2007/01/19/2020 to obtain final inspection. all work has been completed. | |
| Feb 13, 2009 | Completed final sign-off Feb 2009 | 480 Ellis St | Chen's Plumbing Inc | renew pa# 2006/12/13/9810 to obtain final inspection. all work has been completed.Details
renew pa# 2006/12/13/9810 to obtain final inspection. all work has been completed. | |
| Feb 13, 2009 | Completed final sign-off Feb 2009 | 480 Ellis St | Chen's Plumbing Inc | renew pa# 2006/06/12/3785 to obtain final inspection. all work has been completed. to comply with hotel sprinkler ordinance nov# 200339062, dated 03/20/03.Details
renew pa# 2006/06/12/3785 to obtain final inspection. all work has been completed. to comply with hotel sprinkler ordinance nov# 200339062, dated 03/20/03. | |
| Nov 7, 2008 | Completed final sign-off Jun 2013 | 480 Ellis St | Swinerton Builders | addition of bathroom, kitchenettes to (e) sro congregate bedrooms, plumbing, electrical, mechanical upgrade, (n) partition walls, voluntary seismic upgrade, finish upgrades. 82 tourist room + 91 residential bedrooms to be revised to 154 residential bedrooms. no tourist rooms.Details
addition of bathroom, kitchenettes to (e) sro congregate bedrooms, plumbing, electrical, mechanical upgrade, (n) partition walls, voluntary seismic upgrade, finish upgrades. 82 tourist room + 91 residential bedrooms to be revised to 154 residential bedrooms. no tourist rooms. | $3,500,000 |
| Jan 19, 2007 | Expired or cancelled expired Apr 2008 | 480 Ellis St | San Francisco Fire Protection | as-built drawing see 200502024578 for fire alarm system. relocation of power supplies from 2nd & 3rd floor kitchens to 2nd floor closet. his complaints: 200120424,200670779, 200339062, 200565808, 200667193, 200666734.Details
as-built drawing see 200502024578 for fire alarm system. relocation of power supplies from 2nd & 3rd floor kitchens to 2nd floor closet. his complaints: 200120424,200670779, 200339062, 200565808, 200667193, 200666734. | |
| Dec 13, 2006 | Expired or cancelled expired Apr 2008 | 480 Ellis St | Chen's Plumbing Inc | submit as built drawings to original application #2006/06/12/3785 permit #1089171: relocate one 3" schedule 10 pipe and add one (1) head at first floorDetails
submit as built drawings to original application #2006/06/12/3785 permit #1089171: relocate one 3" schedule 10 pipe and add one (1) head at first floor | |
| Aug 21, 2006 | Never finaled issued Aug 2006, no final | 470 Ellis St | street space | ||
| Jul 12, 2006 | Never finaled issued Jul 2006, no final | 470 Ellis St | street space | ||
| Jun 12, 2006 | Expired or cancelled expired Apr 2007 | 480 Ellis St | Chen's Plumbing Inc | renewal for permit # 200408111341.Details
renewal for permit # 200408111341. | $20,000 |
| May 25, 2006 | Expired or cancelled expired Apr 2007 | 480 Ellis St | Everest Waterproofing & Restoration Inc. | replace dryrot studs/joists in kind. not structural 138 lf exterior lightwell at middle of property in room 117 and 437Details
replace dryrot studs/joists in kind. not structural 138 lf exterior lightwell at middle of property in room 117 and 437 | $3,000 |
| Mar 6, 2006 | Never finaled issued Mar 2006, no final | 480 Ellis St | street space permit | ||
| Feb 2, 2005 | Expired or cancelled expired Apr 2008 | 480 Ellis St | San Francisco Fire Protection | install fire alarm system. | $100,000 |
| Aug 11, 2004 | Expired or cancelled expired Jan 2006 | 480 Ellis St | Chen's Plumbing Inc | add fire sprinkler for sro hotel and commercial space at groundfloor to use (e) serviceDetails
add fire sprinkler for sro hotel and commercial space at groundfloor to use (e) service | $80,000 |
| Jul 18, 2002 | Never finaled issued Jul 2002, no final | 472 Ellis St | sidewalk repair | ||
| Jul 18, 2002 | Never finaled issued Jul 2002, no final | 472 Ellis St | sidewalk repair | ||
| Jul 12, 2001 | Completed final sign-off Jul 2001 | 470 Ellis St | Master Protection Corp. | add fire alarm devices to roomDetails
add fire alarm devices to room | $750 |
| Apr 5, 2001 | Expired or cancelled expired Apr 2002 | 470 Ellis St | streetspace | ||
| Feb 7, 2001 | Completed final sign-off Jul 2001 | 470 Ellis St | ti to (e)commercial space,new finishes,mech,elecDetails
ti to (e)commercial space,new finishes,mech,elec | $70,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- San Francisco Fire Protection (6), Swinerton Builders (6), Chen's Plumbing Inc (5), Pacific Auxiliary Fire Alarm (4), Interstate Restoration California Lp (3), 4-Mac Construction (2), Freestone Reconstruction Inc (2), International Fire Equip (2), International Fire Equipment Co Incorpor (2), Plumbworks Inc. /Chris Goodwin Plumbing (2), Bonilla Construction, Drycrew Restoration Contractor, Everest Waterproofing & Restoration Inc., Ideal Restoration Inc, Innovative Construction Implement, J & L Construction Co., M C Mechanical, M-Projects, Maguire Inc Dba Lahue And Associates, Master Protection Corp., Pribuss Engineering Inc, Raum, S M Construction And Assoc, Smart Building Inc.
- Architects
- Jim Fagler (2), Suzan Swabacker (2), Henry Kwong, S Hemminger, Xie Xing Guan
- Engineers
- Donald Gate Yu, Gasi L Aldepulla, James Fagler, Mike Yim
- Designers
- M.K. Engineering Inc.
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.