4-Mac Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2018 to Jul 2026
- Last 24 months
- 32 permits filed
82 permits since 2000: 43 completed, 21 in progress, 12 never finaled, 6 expired or cancelled.
Of the 12 never-finaled permits, 12 are 3 to 5 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 15, 2026 | In progress filed Jul 2026, not yet issued | 610 Polk St | remodel in-kind 49 bathrooms from 2nd floor thru 6th floor.units 209-212, 214-218, 308-312, 408-412, 414-418, 508-512, 514-518, 608-612, 614-618. five bathrms(218, 318, 418, 518, 618) will be remodel as accessible. no residential rooms coverted or removed under this permit.Details
remodel in-kind 49 bathrooms from 2nd floor thru 6th floor.units 209-212, 214-218, 308-312, 408-412, 414-418, 508-512, 514-518, 608-612, 614-618. five bathrms(218, 318, 418, 518, 618) will be remodel as accessible. no residential rooms coverted or removed under this permit. | $400,000 |
| May 15, 2026 | In progress issued May 2026 | 1918 Clement St | revision 202308023528-revise entry stairsDetails
revision 202308023528-revise entry stairs | |
| May 12, 2026 | Completed final sign-off Jun 2026 | 1018 Mission St | repair &repaint wood windows where needed.reseal windows whre needed.repair brick mortar deterioration,lubricate fire escape accordian ladders.remove and repaint rusted areas on fire escape landings,metal cornices&canopy roof slab.repair chipped brick at level 3 window opening.(east wall-mission st)Details
repair &repaint wood windows where needed.reseal windows whre needed.repair brick mortar deterioration,lubricate fire escape accordian ladders.remove and repaint rusted areas on fire escape landings,metal cornices&canopy roof slab.repair chipped brick at level 3 window opening.(east wall-mission st) | $5,500 |
| May 5, 2026 | In progress issued May 2026 | 246 Mcallister St | replace or repair in kind the following: recoat or replace bitumen waterproff on roof parapet repaint parapet and reconstrut missing cornice sections on north facade. remove loose peeling paint and repaint, seal cracks with motor on south side as needed. lube and repaint fire escape ladders as needDetails
replace or repair in kind the following: recoat or replace bitumen waterproff on roof parapet repaint parapet and reconstrut missing cornice sections on north facade. remove loose peeling paint and repaint, seal cracks with motor on south side as needed. lube and repaint fire escape ladders as need | $10,000 |
| May 5, 2026 | Completed final sign-off Jun 2026 | 587 Eddy St | replace or repair in kind the following: recoat or replace bitumen waterproff on roof parapet repaint parapet and reconstrut missing cornice sections on north facade. remove loose peeling paint and repaint, seal cracks with motor on south side as needed. lube and repaint fire escape ladders as needDetails
replace or repair in kind the following: recoat or replace bitumen waterproff on roof parapet repaint parapet and reconstrut missing cornice sections on north facade. remove loose peeling paint and repaint, seal cracks with motor on south side as needed. lube and repaint fire escape ladders as need | $7,500 |
| Apr 7, 2026 | In progress issued Apr 2026 | 247 14th Av | addressing permit only: purpose of this permit is to document the linkage of 247 14th ave to apn 1419/009.Details
addressing permit only: purpose of this permit is to document the linkage of 247 14th ave to apn 1419/009. | |
| Mar 31, 2026 | Completed final sign-off Aug 2026 | 1918 Clement St | to comply w/physical inspection report #cc-8736. common area (1, 2, 3): rear stairway repair, repair handrail; provide compliant landing; repair guard rail. units 1920 & 1918 (5, 6): kitchen exhaustDetails
to comply w/physical inspection report #cc-8736. common area (1, 2, 3): rear stairway repair, repair handrail; provide compliant landing; repair guard rail. units 1920 & 1918 (5, 6): kitchen exhaust | $3,200 |
| Mar 27, 2026 | In progress issued May 2026 | 249 14th Av | unit #247 & #249:to comply with physical inspection report#cc-8744, (n) 20 min. door with self closing hardware and self closing hardware and seals for each unit entry door.(door shall be latching and self or automatic closing)Details
unit #247 & #249:to comply with physical inspection report#cc-8744, (n) 20 min. door with self closing hardware and self closing hardware and seals for each unit entry door.(door shall be latching and self or automatic closing) | $3,200 |
| Dec 30, 2025 | In progress issued Dec 2025 | 2237 Mason St | recommencement and completion of work approved under pa#: 202410112855.Details
recommencement and completion of work approved under pa#: 202410112855. | $62,300 |
| Oct 20, 2025 | In progress issued Oct 2025 | 630 Geary St | recommenecement and completion of work approved under 202103116398Details
recommenecement and completion of work approved under 202103116398 | $180,000 |
| Oct 20, 2025 | In progress issued Apr 2026 | 630 Geary St | revision 202103116398- legalization of unpermitted kitchen relocation with in (e) basement per 202173833 and 202173835Details
revision 202103116398- legalization of unpermitted kitchen relocation with in (e) basement per 202173833 and 202173835 | $120,000 |
| Aug 28, 2025 | In progress issued Aug 2025 | 440 Eddy St | repair and repalce in kind: patch and remortar cracked brick veneer brick mortar joints and replace missing bricks, replace in kind basement level lower vent, repair cracked window frames, paint windows in kind where needed , repair/replace window glass or windows where needed. repair window lentilDetails
repair and repalce in kind: patch and remortar cracked brick veneer brick mortar joints and replace missing bricks, replace in kind basement level lower vent, repair cracked window frames, paint windows in kind where needed , repair/replace window glass or windows where needed. repair window lentil | $10,000 |
| Jun 13, 2025 | Completed final sign-off Jun 2026 | 630 Geary St | replace/repair in kind: lubricate/ paint fire escape and acordian ladder, patch hole, clean remotar, and paint concrete walls where needed. clean, patch, and expoxy exposed rebar at nw corner at 5th fl and where needed. secure misaligned metal exhaust at roof level, recondition, clean/ paint window.Details
replace/repair in kind: lubricate/ paint fire escape and acordian ladder, patch hole, clean remotar, and paint concrete walls where needed. clean, patch, and expoxy exposed rebar at nw corner at 5th fl and where needed. secure misaligned metal exhaust at roof level, recondition, clean/ paint window. | $10,000 |
| Jun 9, 2025 | In progress issued Jul 2025 | 34 06th St | 2/f to 7/f (residential floors): new in kind alteration and remodel to (e) typical stacked bathrooms at 2/f, 3/f, 4/f, 5/f, 6/f and 7/f.Details
2/f to 7/f (residential floors): new in kind alteration and remodel to (e) typical stacked bathrooms at 2/f, 3/f, 4/f, 5/f, 6/f and 7/f. | $100,000 |
| Jun 5, 2025 | Completed final sign-off Jun 2026 | 74 06th St | repair in kind: patch & remodel cracked brick veneer, cornices, brick mortar joints. reseal wall penetrations, clean and recoat areas of corrosion. repaint/repair window frames as needed. lubricate/paint fire escapes. repaint chipped parge where needed. repair and seal cracked parapet coping.Details
repair in kind: patch & remodel cracked brick veneer, cornices, brick mortar joints. reseal wall penetrations, clean and recoat areas of corrosion. repaint/repair window frames as needed. lubricate/paint fire escapes. repaint chipped parge where needed. repair and seal cracked parapet coping. | $10,000 |
| Jun 5, 2025 | In progress issued Jul 2025 | 34 06th St | exterior - repair in kind the following: patch and remortar cracked brick veneer, cornices, wall on roof & gaps along mortar joints. patch crack on roof parapet and roof cornice. treat w/waterproofing paint. seal or replace in kind roof & parapet coping. clean & recoat dunnage beam. repair waterDetails
exterior - repair in kind the following: patch and remortar cracked brick veneer, cornices, wall on roof & gaps along mortar joints. patch crack on roof parapet and roof cornice. treat w/waterproofing paint. seal or replace in kind roof & parapet coping. clean & recoat dunnage beam. repair water | $10,000 |
| Jun 5, 2025 | In progress issued Jul 2025 | 505 Ofarrell St | exterior - repair in kind the following: patch or repaint & reseal spalling, cracked concrete, coating dunnage beams & vert. ducts. secure loose sheet metal flashing. replace in kind missing & cracked tile, repair and patch windowsills. patch & recoat open joints. seal & repaint cornice metal edge.Details
exterior - repair in kind the following: patch or repaint & reseal spalling, cracked concrete, coating dunnage beams & vert. ducts. secure loose sheet metal flashing. replace in kind missing & cracked tile, repair and patch windowsills. patch & recoat open joints. seal & repaint cornice metal edge. | $10,000 |
| Jun 5, 2025 | In progress issued Jul 2025 | 909 Geary St | repair in kind: patch & remorter cracked brick veneer where needed, cornices & brick mortar joints., reseal way penetrations, clean & recoat areas of corrosion. paint and waterproof window lintels, repair cracked window frames, paint window frames, lubricate/paint fire escapes. secure decorativeDetails
repair in kind: patch & remorter cracked brick veneer where needed, cornices & brick mortar joints., reseal way penetrations, clean & recoat areas of corrosion. paint and waterproof window lintels, repair cracked window frames, paint window frames, lubricate/paint fire escapes. secure decorative | $10,000 |
| May 30, 2025 | Completed final sign-off Sep 2025 | 3110 Octavia St | replacement of ground fl garage doors w/ swing in french doors, same size & locationDetails
replacement of ground fl garage doors w/ swing in french doors, same size & location | $9,000 |
| May 29, 2025 | In progress issued May 2025 | 2237 Mason St | only where needed remove and replace in kind sheet rock or lath and plaster 5/8 typ x for new plumbing for existing bathrooms. replace existing panels where needed from ceiling in dining area. no change in bathroom layout. all works on ceilingDetails
only where needed remove and replace in kind sheet rock or lath and plaster 5/8 typ x for new plumbing for existing bathrooms. replace existing panels where needed from ceiling in dining area. no change in bathroom layout. all works on ceiling | $3,000 |
| May 22, 2025 | Completed final sign-off Sep 2025 | 3110 Octavia St | interior painting throughout, new flooring throughout, re-paint laundry room floor, install e-locks to 70 guest rooms, replace in kind 6 exit doors panic hardware and 5 doors interior, corroded pipes in laundry room, ground floor 25 lights 25 outlets 10 exit signs. upgrade 8 subpanels.Details
interior painting throughout, new flooring throughout, re-paint laundry room floor, install e-locks to 70 guest rooms, replace in kind 6 exit doors panic hardware and 5 doors interior, corroded pipes in laundry room, ground floor 25 lights 25 outlets 10 exit signs. upgrade 8 subpanels. | $10,200 |
| May 1, 2025 | In progress issued Aug 2025 | 459 Turk St | proposed (n) common kitchen & alteration to (e) front desk/reception & common room at main level flDetails
proposed (n) common kitchen & alteration to (e) front desk/reception & common room at main level fl | $90,000 |
| Apr 30, 2025 | In progress issued Apr 2025 | 2322 Lombard St | to obtain final inspection for work approved under pa#: 201702038648 all work is complete.Details
to obtain final inspection for work approved under pa#: 201702038648 all work is complete. | |
| Apr 30, 2025 | In progress issued May 2025 | 2322 Lombard St | recommencement and completion of work approved under bpa#: 2014.1217.3954Details
recommencement and completion of work approved under bpa#: 2014.1217.3954 | $975,000 |
| Apr 4, 2025 | Completed final sign-off Aug 2025 | 3110 Octavia St | exterior facade maintenance: patch and repair stucco, remediate paint and repair/ replace architectural moldings. comply with nov 202310934Details
exterior facade maintenance: patch and repair stucco, remediate paint and repair/ replace architectural moldings. comply with nov 202310934 | $11,000 |
| Apr 4, 2025 | Completed final sign-off Aug 2025 | 3110 Octavia St | replace windows -27 total. not visible from streetDetails
replace windows -27 total. not visible from street | $11,000 |
| Mar 18, 2025 | Completed final sign-off Jan 2026 | 587 Eddy St | new alteration to existing typical bathrooms at bedroom. #306,406,506,606Details
new alteration to existing typical bathrooms at bedroom. #306,406,506,606 | $35,000 |
| Feb 26, 2025 | Completed final sign-off Jan 2026 | 520 South Van Ness Av | 3/fl-(n) alteration and remodel to (e) 3rd floor mens and womens bathroomDetails
3/fl-(n) alteration and remodel to (e) 3rd floor mens and womens bathroom | $150,000 |
| Dec 5, 2024 | Completed final sign-off Mar 2025 | 26 Parnassus Av | ref 202310209137 relocate garage door 12" replace planters with metal railingsDetails
ref 202310209137 relocate garage door 12" replace planters with metal railings | |
| Dec 3, 2024 | In progress filed Dec 2024, not yet issued | 505 Ofarrell St | unit 515 and 315: remodel 2 bathrooms in kind in the rooms. ne wshower pan, new sink, new toilet.Details
unit 515 and 315: remodel 2 bathrooms in kind in the rooms. ne wshower pan, new sink, new toilet. | $40,000 |
| Dec 3, 2024 | Expired or cancelled withdrawn Aug 2025 | 610 Fillmore St | unit 106, 206, and 306: remodel 3 bathrooms voluntary upgrade into ada bathrooms . new shower pan, new toilet, new sinkDetails
unit 106, 206, and 306: remodel 3 bathrooms voluntary upgrade into ada bathrooms . new shower pan, new toilet, new sink | $60,000 |
| Oct 11, 2024 | In progress issued Oct 2024 | 2237 Mason St | replace sheetrock and insulation for guest rooms in kind replace electrical & plumbing for guest rooms in kind. new ada door opener.Details
replace sheetrock and insulation for guest rooms in kind replace electrical & plumbing for guest rooms in kind. new ada door opener. | $62,300 |
| Sep 16, 2024 | Completed final sign-off Oct 2024 | 505 Ofarrell St | unti's 415 and 615: (2) bath remodel: replace 2 shower pans, install new toilet, install (2) new sinks and retile walls and floor in the rooms. no structural work.Details
unti's 415 and 615: (2) bath remodel: replace 2 shower pans, install new toilet, install (2) new sinks and retile walls and floor in the rooms. no structural work. | $21,200 |
| Aug 2, 2024 | In progress issued Aug 2024 | 2237 Mason St | replace in kind sheetrock in rooms 65, 66 (3rd floor) and 30, 31 (2nd floor) due to water damage.Details
replace in kind sheetrock in rooms 65, 66 (3rd floor) and 30, 31 (2nd floor) due to water damage. | $4,000 |
| Jul 18, 2024 | Completed final sign-off Oct 2024 | 908 Post St | unit 23: new bathroom in sleeping rm # 23. no kitchen to be addedDetails
unit 23: new bathroom in sleeping rm # 23. no kitchen to be added | $21,000 |
| Jul 3, 2024 | Completed final sign-off Oct 2024 | 427 Madrid St | remodel bathroom 5x8 ft in kind, no moving walls. new toilet, new shower pan, new vanity. all fixtures to remain in same location.Details
remodel bathroom 5x8 ft in kind, no moving walls. new toilet, new shower pan, new vanity. all fixtures to remain in same location. | $21,500 |
| Apr 29, 2024 | Completed final sign-off Jun 2024 | 630 Geary St | to obtain final inspection for work approved under pa#202007029508. all work is completeDetails
to obtain final inspection for work approved under pa#202007029508. all work is complete | |
| Apr 8, 2024 | Completed final sign-off Apr 2025 | 835 Larkin St | prop h: non-structural alterations to (e) retail space for new immersive theater space. open kitchen w/ventless hood, powder rm, mech system, lighting and primary entry modifications.Details
prop h: non-structural alterations to (e) retail space for new immersive theater space. open kitchen w/ventless hood, powder rm, mech system, lighting and primary entry modifications. | $55,000 |
| Mar 25, 2024 | Completed final sign-off May 2024 | 34 06th St | replace 30 (e) wood doors to metal doors. (bathrooms doors, storage, and offices) maintain rating of doors.Details
replace 30 (e) wood doors to metal doors. (bathrooms doors, storage, and offices) maintain rating of doors. | $28,000 |
| Feb 16, 2024 | Completed final sign-off Jan 2025 | 56 Mason St | proposed new 575 sq ft staff support office at main level floor.Details
proposed new 575 sq ft staff support office at main level floor. | $45,000 |
| Jan 26, 2024 | Completed final sign-off Mar 2026 | 13 Forest Knolls Dr | revision to pa# 202002124281, shuffle kitchen fixtures. relocate bathroom fixtures.Details
revision to pa# 202002124281, shuffle kitchen fixtures. relocate bathroom fixtures. | $100 |
| Nov 8, 2023 | Completed final sign-off Apr 2025 | 449 Turk St | (n)898 sqft ti; (n) non-structural finished ceiling. (n) offices staff meeting room, accessble restroom, break room (staff) storage, doors and windows, lighting, electrical fixtures, ductless hvac unit. -tenant improvement 441 turk st (same bldg)Details
(n)898 sqft ti; (n) non-structural finished ceiling. (n) offices staff meeting room, accessble restroom, break room (staff) storage, doors and windows, lighting, electrical fixtures, ductless hvac unit. -tenant improvement 441 turk st (same bldg) | $156,000 |
| Oct 27, 2023 | Completed final sign-off Dec 2024 | 520 South Van Ness Av | new alteration; remodel to (e) 2/f women's bathroom-replace partition walls; stalls; (n) finishes and waterproofing, new fixtures; restroom accessories, new lighting; electrical fixtures, new soffit.Details
new alteration; remodel to (e) 2/f women's bathroom-replace partition walls; stalls; (n) finishes and waterproofing, new fixtures; restroom accessories, new lighting; electrical fixtures, new soffit. | $100,000 |
| Sep 18, 2023 | Never finaled filed Sep 2023, never issued | 585 Post St | remove and install approx 950sqft 5/8 drywall on walls and ceiling caused by a water leak. remove and install approx 650 sqft. vinyl flooring. apply primer and paint on walls on ceiling. ground flr. no change of use.Details
remove and install approx 950sqft 5/8 drywall on walls and ceiling caused by a water leak. remove and install approx 650 sqft. vinyl flooring. apply primer and paint on walls on ceiling. ground flr. no change of use. | $22,500 |
| Sep 15, 2023 | Never finaled issued Sep 2023, no final | 364 Union St | at rear bldg: replace foundation approx 13 linear ft. siding repair approx 400 sqftDetails
at rear bldg: replace foundation approx 13 linear ft. siding repair approx 400 sqft | $19,000 |
| Aug 28, 2023 | Completed final sign-off Sep 2023 | 1693 Market St | replace base and walls cabinets, replace counter top, replace sink and light fixture on break room on 2nd floor.Details
replace base and walls cabinets, replace counter top, replace sink and light fixture on break room on 2nd floor. | $4,600 |
| Aug 2, 2023 | In progress issued Mar 2025 | 1918 Clement St | interior remodel of 1st fl. remodel to include dinning area, kitchen, bathroom and office. change of use to (n) lmted restaurant mep deferred.Details
interior remodel of 1st fl. remodel to include dinning area, kitchen, bathroom and office. change of use to (n) lmted restaurant mep deferred. | $120,000 |
| Aug 1, 2023 | Completed final sign-off Jan 2025 | 1541 California St | conversion of existing 69 sq ft tool room to (n)residential restroom within (e) footprint on 2nd fl.Details
conversion of existing 69 sq ft tool room to (n)residential restroom within (e) footprint on 2nd fl. | $10,000 |
| Jul 11, 2023 | Never finaled issued Jul 2023, no final | 370 Union St | revision to permit 202106152465. add retaining wall at property line and for planter in front of (e) retaining wall in rear yard.Details
revision to permit 202106152465. add retaining wall at property line and for planter in front of (e) retaining wall in rear yard. | $10,000 |
| May 19, 2023 | Completed final sign-off May 2024 | 372 Union St | remodel 1-kitchen and 1-bathroom, rewire electrical for this unit and install & replace existing window in bathroom, non-street facing. in kind remodel. max u factor 0.3Details
remodel 1-kitchen and 1-bathroom, rewire electrical for this unit and install & replace existing window in bathroom, non-street facing. in kind remodel. max u factor 0.3 | $50,000 |
| Apr 27, 2023 | Completed final sign-off Jul 2025 | 1018 Mission St | relocation of (e) managers unit @ 2nd flr, new bathrooms for rooms on 2-5 flrs, 4 new bathrooms w/grab bars @ rooms 117, 217, 317 & 417, new common use offices for residents on 2-5 flrs, no change to (e) unit count. new ada push button at g/f, new reception counter.Details
relocation of (e) managers unit @ 2nd flr, new bathrooms for rooms on 2-5 flrs, 4 new bathrooms w/grab bars @ rooms 117, 217, 317 & 417, new common use offices for residents on 2-5 flrs, no change to (e) unit count. new ada push button at g/f, new reception counter. | $1,660,000 |
| Apr 20, 2023 | Completed final sign-off Apr 2024 | 2195 Mission St | to comply with nov# 202295270: repair awningDetails
to comply with nov# 202295270: repair awning | $2,000 |
| Apr 7, 2023 | Never finaled issued Apr 2023, no final | 201 14th Av | comply with nov# 202303713: remodel of (3) kitchens and (6) bathrooms in kind. call for start of work inspection upon issuance of permit.Details
comply with nov# 202303713: remodel of (3) kitchens and (6) bathrooms in kind. call for start of work inspection upon issuance of permit. | $67,000 |
| Mar 16, 2023 | Completed final sign-off May 2024 | 370 Union St | (1) kitchen and (1) bathroom remodel and rewire the electrical for unit 370.Details
(1) kitchen and (1) bathroom remodel and rewire the electrical for unit 370. | $70,000 |
| Feb 28, 2023 | Never finaled issued Feb 2023, no final | 201 14th Av | demo to open up walls and roof to access damage from fire damage caused by neighbors property per nov# 202303713 (partially comply w/ nov)Details
demo to open up walls and roof to access damage from fire damage caused by neighbors property per nov# 202303713 (partially comply w/ nov) | $50,000 |
| Jan 27, 2023 | Completed final sign-off Apr 2024 | 1444 Broadway | rear building: replace in-kind existing dryrotted handrails, guardrails and bring to current building code as required. (not visible from street)Details
rear building: replace in-kind existing dryrotted handrails, guardrails and bring to current building code as required. (not visible from street) | $4,500 |
| Jan 20, 2023 | Completed final sign-off Apr 2024 | 1444 Broadway | converting unit#3 at 1444 broadway av. becoming unit#3 & unit #4 1444 broadwayDetails
converting unit#3 at 1444 broadway av. becoming unit#3 & unit #4 1444 broadway | $35,000 |
| Dec 16, 2022 | Never finaled issued Dec 2022, no final | 1024 Mission St | remodel bathroom, in kindDetails
remodel bathroom, in kind | $15,003 |
| Dec 9, 2022 | Completed final sign-off Jul 2025 | 1018 Mission St | remodel in kind (8) common toilets and showers. interior only.Details
remodel in kind (8) common toilets and showers. interior only. | $120,350 |
| Dec 1, 2022 | Expired or cancelled cancelled Jan 2026 | 488 Ellis St | revision to mechanical system for approved permit #202112204709. additional information provided for water redirection framing plan @ ceiling.Details
revision to mechanical system for approved permit #202112204709. additional information provided for water redirection framing plan @ ceiling. | $20,000 |
| Sep 15, 2022 | Never finaled filed Sep 2022, never issued | 2195 Mission St | to comly with nov# 2022-95270: remove old awningDetails
to comly with nov# 2022-95270: remove old awning | $2,000 |
| Jun 6, 2022 | Completed final sign-off Apr 2023 | 671 Laguna Honda Bl | remodel (2) bathrooms and kitchen in-kind. new cabinets, sinks, countertops, bathtub, vanity, toilets. no structural work. bathroom size 5x8 and kitchen 10x10 ft.Details
remodel (2) bathrooms and kitchen in-kind. new cabinets, sinks, countertops, bathtub, vanity, toilets. no structural work. bathroom size 5x8 and kitchen 10x10 ft. | $42,000 |
| Jun 6, 2022 | Never finaled issued Jun 2022, no final | 51 Rio Ct | remodel bathroom in-kind. 5 x 8 ft. new sink, new showe pan, new vanity.Details
remodel bathroom in-kind. 5 x 8 ft. new sink, new showe pan, new vanity. | $12,500 |
| Jun 2, 2022 | Expired or cancelled cancelled May 2024 | 1442 Broadway | (front building) remodel one kitchen & one bathroom.non structuralDetails
(front building) remodel one kitchen & one bathroom.non structural | $45,000 |
| Jun 2, 2022 | Expired or cancelled cancelled May 2024 | 1442 Broadway | (front building) reroofing.Details
(front building) reroofing. | $8,000 |
| Jun 2, 2022 | Expired or cancelled cancelled Jul 2023 | 1442 Broadway | (rear building) unit # 3, #4, #6: remodel kitchen & bathroom. total of 3 kitchens and 3 bathrooms.Details
(rear building) unit # 3, #4, #6: remodel kitchen & bathroom. total of 3 kitchens and 3 bathrooms. | $135,000 |
| Apr 28, 2022 | Expired or cancelled expired Mar 2025 | 1018 Mission St | to comply w/ nov# 20203312: replace (4) fire escape windows with double hung windows (2-5th fl). windows in showers opposite 401 abd 201 to be infilled on separate permit. #4 grab bars to be replaced on seprate permit. street facing wood windows on 2nd floor to be replaced. #5 handrails to be fixedDetails
to comply w/ nov# 20203312: replace (4) fire escape windows with double hung windows (2-5th fl). windows in showers opposite 401 abd 201 to be infilled on separate permit. #4 grab bars to be replaced on seprate permit. street facing wood windows on 2nd floor to be replaced. #5 handrails to be fixed | $30,000 |
| Feb 15, 2022 | Completed final sign-off Apr 2024 | 2057 Green St | bath room remodel, replace bath tub and faucet, replace toliet and sink, replace switches and outletDetails
bath room remodel, replace bath tub and faucet, replace toliet and sink, replace switches and outlet | $14,000 |
| Feb 15, 2022 | Completed final sign-off Apr 2022 | 1452 Clement St | remodel one bath room, replace faucet, replace sink, replace tiles, install new fan. maintain rated separation between dwelling units. exhaust terminate 3' from pl & openings into the bldg.Details
remodel one bath room, replace faucet, replace sink, replace tiles, install new fan. maintain rated separation between dwelling units. exhaust terminate 3' from pl & openings into the bldg. | $14,000 |
| Jan 11, 2022 | Never finaled issued Jan 2022, no final | 226 06th St | replace the siding of the 2 sides and back of the bldg. approximately 4250 sq ft.Details
replace the siding of the 2 sides and back of the bldg. approximately 4250 sq ft. | $32,000 |
| Dec 20, 2021 | Never finaled issued Oct 2022, no final | 488 Ellis St | tenant improvement to (e) open office space at lower level space. additional scope includes installing drain pan underneath ceiling to address water from units above. new parttion walls,cubicles, drop ceiling at new office.Details
tenant improvement to (e) open office space at lower level space. additional scope includes installing drain pan underneath ceiling to address water from units above. new parttion walls,cubicles, drop ceiling at new office. | $120,000 |
| Nov 29, 2021 | Completed final sign-off Aug 2025 | 1457 Hudson Av | revision to pa #2021/0811/6264. comply with nov#202183375. dry rot repair @ rear. more than 50% in-kind replacement of front and rear ext stairs. replace windows throughout(same size,same location). new elec furnace, increase rafter size @ attic to acommodate new insulation, replace dry wall.Details
revision to pa #2021/0811/6264. comply with nov#202183375. dry rot repair @ rear. more than 50% in-kind replacement of front and rear ext stairs. replace windows throughout(same size,same location). new elec furnace, increase rafter size @ attic to acommodate new insulation, replace dry wall. | $75,000 |
| Aug 20, 2021 | Completed final sign-off Oct 2021 | 2901 16th St | rev to pa 202005077352 & 202107275226: to document removal of pipe guardrail as it is not necessary.Details
rev to pa 202005077352 & 202107275226: to document removal of pipe guardrail as it is not necessary. | |
| Aug 11, 2021 | Completed final sign-off Aug 2025 | 1457 Hudson Av | installation of bathroom in the attic bedroom #3. interior remodel: main flr kitchen are to be remodeled. basement unit: kitchen re-design and updated. (e) bathroom remodel and relocated. add laundry room (52sf)Details
installation of bathroom in the attic bedroom #3. interior remodel: main flr kitchen are to be remodeled. basement unit: kitchen re-design and updated. (e) bathroom remodel and relocated. add laundry room (52sf) | $75,000 |
| Jul 27, 2021 | Completed final sign-off Oct 2021 | 2901 16th St | revision to pa 2020-0507-7352 existing sloped entry to remain and add power door operator per information sheet da-04Details
revision to pa 2020-0507-7352 existing sloped entry to remain and add power door operator per information sheet da-04 | $3,200 |
| Jun 22, 2021 | Completed final sign-off Sep 2021 | 449 Turk St | replacing damage ceiling approx. 600 sf water redirection (seal). replace 3 outlets and 3 switches. all work at retail space.Details
replacing damage ceiling approx. 600 sf water redirection (seal). replace 3 outlets and 3 switches. all work at retail space. | $10,000 |
| Jun 15, 2021 | Never finaled issued Mar 2023, no final | 370 Union St | install & repair retaining walls in rear yard. install wood stairs to the upper reaches of the rear yard. install (n) landscaping in the rear yard.Details
install & repair retaining walls in rear yard. install wood stairs to the upper reaches of the rear yard. install (n) landscaping in the rear yard. | $65,000 |
| Jun 10, 2021 | Completed final sign-off Oct 2021 | 459 Turk St | 1/f: remodel 2 bathrooms in kind in common area. replace shower valve, tile, shower pan. add grab bars in both bathrooms.Details
1/f: remodel 2 bathrooms in kind in common area. replace shower valve, tile, shower pan. add grab bars in both bathrooms. | $12,000 |
| Jun 10, 2021 | Completed final sign-off Jul 2023 | 2849 Bryant St | 570 sqfr of existing basement remodeled to new bedroom, laundry room & full bathroom. windows & doors will be replaced at ground fl rear. existing exterior spiral stairs at rear to be replaced with straight stairs.Details
570 sqfr of existing basement remodeled to new bedroom, laundry room & full bathroom. windows & doors will be replaced at ground fl rear. existing exterior spiral stairs at rear to be replaced with straight stairs. | $45,000 |
| Mar 11, 2021 | Never finaled issued Oct 2022, no final | 630 Geary St | comply w/nov 202173833 & 202173835. convert(e) basement entertainment rm to(n) storage rm w/full bath, convert(e) communal baths on flrs 1-5 to (n) utility closets w/janitorial sinks, 1/f reconfig/change use of 2(e) rms to (n) ofc & restore kitchen to mgrs dwelling unit. convert 30(e) guest rmDetails
comply w/nov 202173833 & 202173835. convert(e) basement entertainment rm to(n) storage rm w/full bath, convert(e) communal baths on flrs 1-5 to (n) utility closets w/janitorial sinks, 1/f reconfig/change use of 2(e) rms to (n) ofc & restore kitchen to mgrs dwelling unit. convert 30(e) guest rm | $100,000 |
| May 7, 2020 | Completed final sign-off Oct 2021 | 2901 16th St | remodel service area, add coved base where required, new service sink, relocate (e) sink in serving area, new walk-in cooler, new ceiling lights, upgrade electrical panel.Details
remodel service area, add coved base where required, new service sink, relocate (e) sink in serving area, new walk-in cooler, new ceiling lights, upgrade electrical panel. | $18,000 |
| Dec 4, 2018 | Completed final sign-off Dec 2024 | 520 South Van Ness Av | interior new alteration to e 2nd fl mens bath to comply with nov 201802994Details
interior new alteration to e 2nd fl mens bath to comply with nov 201802994 | $150,000 |