Block 0741, lot 006A
600 Polk St
- City’s use
- Commercial Hotel
- Built
- 1930
- Stories
- 6
- Units
- 108
- Rooms
- 95 bathrooms
- Lot
- 7,222 sq ft
- Zoning
- RC4
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
28 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 15, 2026 | In progress filed Jul 2026, not yet issued | 610 Polk St | 4-Mac Construction, Ambrocio Construction Inc | remodel in-kind 49 bathrooms from 2nd floor thru 6th floor.units 209-212, 214-218, 308-312, 408-412, 414-418, 508-512, 514-518, 608-612, 614-618. five bathrms(218, 318, 418, 518, 618) will be remodel as accessible. no residential rooms coverted or removed under this permit.Details
remodel in-kind 49 bathrooms from 2nd floor thru 6th floor.units 209-212, 214-218, 308-312, 408-412, 414-418, 508-512, 514-518, 608-612, 614-618. five bathrms(218, 318, 418, 518, 618) will be remodel as accessible. no residential rooms coverted or removed under this permit. | $400,000 |
| Feb 12, 2020 | Never finaled issued Feb 2020, no final | 610 Polk St | to comply with 201892281 pip sheetrock bathroom walls due to major leak change bathroom fixture - rm 211 residential room. 40 sq ft of wallDetails
to comply with 201892281 pip sheetrock bathroom walls due to major leak change bathroom fixture - rm 211 residential room. 40 sq ft of wall | $600 | |
| Aug 22, 2018 | Completed final sign-off Sep 2018 | 610 Polk St | to obtain final inspection for work approved under pa#200409285335. all work is complete.Details
to obtain final inspection for work approved under pa#200409285335. all work is complete. | ||
| Aug 3, 2015 | Completed final sign-off Oct 2015 | 600 Polk St | Peninsula Fire Protection Inc | alteratioln of (e) fire sprinkler system for new t.i. reference ti 2015.0210.7926 - maher naDetails
alteratioln of (e) fire sprinkler system for new t.i. reference ti 2015.0210.7926 - maher na | $6,000 |
| Jul 13, 2015 | Completed final sign-off Oct 2015 | 600 Polk St | Light Hammer Electrical And Building | revision to t-24. new t-24 per app#201506088374. n/a for maherDetails
revision to t-24. new t-24 per app#201506088374. n/a for maher | |
| Jun 8, 2015 | Completed final sign-off Oct 2015 | 600 Polk St | Light Hammer Electrical And Building | provide title 24. installnew lighting.recepticals at bar/loung area. ref. t.i. appl. 201502107926. maher n/a.Details
provide title 24. installnew lighting.recepticals at bar/loung area. ref. t.i. appl. 201502107926. maher n/a. | $9,000 |
| May 11, 2015 | Completed final sign-off Oct 2015 | 600 Polk St | M 2 Design (Ck Id) | revision to appl #201504173952 - new plan/engineering to structural attachment point. n/a maher ordinanceDetails
revision to appl #201504173952 - new plan/engineering to structural attachment point. n/a maher ordinance | |
| Apr 17, 2015 | Completed final sign-off Oct 2015 | 600 Polk St | M 2 Design (Ck Id) | to install barrel ceiling & open metal gate to alcove at entry. n/a maher ordinanceDetails
to install barrel ceiling & open metal gate to alcove at entry. n/a maher ordinance | $5,000 |
| Feb 10, 2015 | Completed final sign-off Oct 2015 | 600 Polk St | M 2 Design (Ck Id) | remodel (e) bar/lounge, demo partitions, ceiling tiles & banquettes. (n) banquettes, table seating areas & remodel dining area, (n) finishes at walls, floors & ceilings. n/a ordinance #155-13. mep under separate permitDetails
remodel (e) bar/lounge, demo partitions, ceiling tiles & banquettes. (n) banquettes, table seating areas & remodel dining area, (n) finishes at walls, floors & ceilings. n/a ordinance #155-13. mep under separate permit | $150,000 |
| Jan 26, 2015 | Completed final sign-off Oct 2015 | 600 Polk St | M 2 Design (Ck Id) | remove/replace tile floor in kitchen, remove/replace grease trap, remove/replace floor drain; maher n/aDetails
remove/replace tile floor in kitchen, remove/replace grease trap, remove/replace floor drain; maher n/a | $1,600 |
| Jan 21, 2015 | Never finaled issued Jan 2015, no final | 610 Polk St | Glenside Construction | interior remodel of #203 and #201. terminate electrical. install general lighting and sheet rock repair. partially comply with n.o.v. #201520281 for rm 201.Details
interior remodel of #203 and #201. terminate electrical. install general lighting and sheet rock repair. partially comply with n.o.v. #201520281 for rm 201. | $3,500 |
| Jan 24, 2014 | Never finaled issued Jan 2014, no final | 600 Polk St | street spaceDetails
street space | ||
| Oct 10, 2012 | Completed final sign-off Jan 2013 | 614 Polk St | to obtain final inspection for work approved under pa # 200206179148. all work is complete. change of use approved under pa # 200206179148.Details
to obtain final inspection for work approved under pa # 200206179148. all work is complete. change of use approved under pa # 200206179148. | ||
| May 27, 2011 | Expired or cancelled cancelled Jan 2026 | 600 Polk St | recalculate the occupancy load for the bar refer to pa.#201007136425, no construction fire fire dept. onlyDetails
recalculate the occupancy load for the bar refer to pa.#201007136425, no construction fire fire dept. only | ||
| Apr 7, 2011 | Expired or cancelled cancelled Jan 2026 | 600 Polk St | Kieran Keaney Const | interior remodel 2nd floor only: add 1-1/2" light weight concrete 2nd flr above bar for better sound roofing; const new parapet to separate corridor near by staircase; close the door in (e) office next to (n) ramp; re-calculate the occupancy load for the bar. ref #201103021222, #201007136425.Details
interior remodel 2nd floor only: add 1-1/2" light weight concrete 2nd flr above bar for better sound roofing; const new parapet to separate corridor near by staircase; close the door in (e) office next to (n) ramp; re-calculate the occupancy load for the bar. ref #201103021222, #201007136425. | $8,000 |
| Mar 2, 2011 | Never finaled issued Apr 2011, no final | 600 Polk St | Kieran Keaney Const | revision to permit appl.# 2010-0713-6425 - construct a new non-bearing wall with new door between hotel lobby and bar.Details
revision to permit appl.# 2010-0713-6425 - construct a new non-bearing wall with new door between hotel lobby and bar. | $1,000 |
| Oct 21, 2010 | Never finaled issued Dec 2010, no final | 600 Polk St | Dennis A Jereza | hood and duct fire supression system- ul 300 upgradeDetails
hood and duct fire supression system- ul 300 upgrade | $4,000 |
| Jul 13, 2010 | Expired or cancelled expired Jun 2013 | 600 Polk St | Kieran Keaney Const | interior remodel on bar only. construct new 5 stall unisex restrooms and reduce size of kitchen. rearrange tables and sitting area . widen e stairs to courtyard/parking lot.new occupant load. sffd permit required for assembly.Details
interior remodel on bar only. construct new 5 stall unisex restrooms and reduce size of kitchen. rearrange tables and sitting area . widen e stairs to courtyard/parking lot.new occupant load. sffd permit required for assembly. | $15,000 |
| Feb 11, 2005 | Never finaled issued Feb 2005, no final | 610 Polk St | San Francisco Fire Protection | install communicatror for existing fire panelDetails
install communicatror for existing fire panel | $800 |
| Sep 28, 2004 | Never finaled issued Nov 2004, no final | 610 Polk St | Fire Protection Retrofit Specialist | install fire sprinkler system to comply with ord # 170-02. (as bldg dwg. appl# 2003/11/21/0807)Details
install fire sprinkler system to comply with ord # 170-02. (as bldg dwg. appl# 2003/11/21/0807) | |
| May 5, 2004 | Never finaled issued May 2004, no final | 610 Polk St | street space permitDetails
street space permit | ||
| Nov 21, 2003 | Never finaled issued Jan 2004, no final | 610 Polk St | Fire Protection Retrofit Specialist | to install fire sprinkler system to comply w/ ord. #170-02Details
to install fire sprinkler system to comply w/ ord. #170-02 | $63,376 |
| Apr 4, 2003 | Expired or cancelled cancelled Apr 2004 | 610 Polk St | Fire Stop Sprinkler Company | install new fire sprinkler system on entire bldg per sro ordinance 170-02Details
install new fire sprinkler system on entire bldg per sro ordinance 170-02 | $91,600 |
| Jun 17, 2002 | Expired or cancelled expired Sep 2003 | 614 Polk St | existing hair saloon to be converted to coffee shopDetails
existing hair saloon to be converted to coffee shop | $11,000 | |
| Jun 14, 2001 | Completed final sign-off Jul 2002 | 610 Polk St | Fire Innovation | connect of exist 120vac smoke detector to exist fire alarm control panel.Details
connect of exist 120vac smoke detector to exist fire alarm control panel. | $500 |
| May 7, 2001 | Completed final sign-off Jul 2002 | 610 Polk St | Dpw Inc. | sprinkle boiler room and new nextel room in basement at rear parking lot, per approved by s.f.f.d.Details
sprinkle boiler room and new nextel room in basement at rear parking lot, per approved by s.f.f.d. | $2,500 |
| Feb 2, 2001 | Completed final sign-off Jul 2002 | 610 Polk St | change type of const fr type v to type iii to correct app const type revise app #200010042254Details
change type of const fr type v to type iii to correct app const type revise app #200010042254 | ||
| Oct 4, 2000 | Completed final sign-off Jul 2002 | 610 Polk St | wireless telecommunications facility intallation of 1 18" omni antenna (micro cell)Details
wireless telecommunications facility intallation of 1 18" omni antenna (micro cell) | $35,000 |