Back to kitchen remodel contractors
4-Mac Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2018 to Jul 2026
- Last 24 months
- 32 permits filed
82 permits since 2000: 43 completed, 21 in progress, 12 never finaled, 6 expired or cancelled.
Of the 12 never-finaled permits, 12 are 3 to 5 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
15 kitchen remodel permits: 8 completed, 3 in progress, 2 never finaled, 2 expired or cancelled. Typically 8 days from filing to permit and 342 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 31, 2026 | Completed final sign-off Aug 2026 | 1918 Clement St | to comply w/physical inspection report #cc-8736. common area (1, 2, 3): rear stairway repair, repair handrail; provide compliant landing; repair guard rail. units 1920 & 1918 (5, 6): kitchen exhaustDetails
to comply w/physical inspection report #cc-8736. common area (1, 2, 3): rear stairway repair, repair handrail; provide compliant landing; repair guard rail. units 1920 & 1918 (5, 6): kitchen exhaust | $3,200 |
| Oct 20, 2025 | In progress issued Apr 2026 | 630 Geary St | revision 202103116398- legalization of unpermitted kitchen relocation with in (e) basement per 202173833 and 202173835Details
revision 202103116398- legalization of unpermitted kitchen relocation with in (e) basement per 202173833 and 202173835 | $120,000 |
| May 1, 2025 | In progress issued Aug 2025 | 459 Turk St | proposed (n) common kitchen & alteration to (e) front desk/reception & common room at main level flDetails
proposed (n) common kitchen & alteration to (e) front desk/reception & common room at main level fl | $90,000 |
| Jul 18, 2024 | Completed final sign-off Oct 2024 | 908 Post St | unit 23: new bathroom in sleeping rm # 23. no kitchen to be addedDetails
unit 23: new bathroom in sleeping rm # 23. no kitchen to be added | $21,000 |
| Apr 8, 2024 | Completed final sign-off Apr 2025 | 835 Larkin St | prop h: non-structural alterations to (e) retail space for new immersive theater space. open kitchen w/ventless hood, powder rm, mech system, lighting and primary entry modifications.Details
prop h: non-structural alterations to (e) retail space for new immersive theater space. open kitchen w/ventless hood, powder rm, mech system, lighting and primary entry modifications. | $55,000 |
| Jan 26, 2024 | Completed final sign-off Mar 2026 | 13 Forest Knolls Dr | revision to pa# 202002124281, shuffle kitchen fixtures. relocate bathroom fixtures.Details
revision to pa# 202002124281, shuffle kitchen fixtures. relocate bathroom fixtures. | $100 |
| Aug 2, 2023 | In progress issued Mar 2025 | 1918 Clement St | interior remodel of 1st fl. remodel to include dinning area, kitchen, bathroom and office. change of use to (n) lmted restaurant mep deferred.Details
interior remodel of 1st fl. remodel to include dinning area, kitchen, bathroom and office. change of use to (n) lmted restaurant mep deferred. | $120,000 |
| May 19, 2023 | Completed final sign-off May 2024 | 372 Union St | remodel 1-kitchen and 1-bathroom, rewire electrical for this unit and install & replace existing window in bathroom, non-street facing. in kind remodel. max u factor 0.3Details
remodel 1-kitchen and 1-bathroom, rewire electrical for this unit and install & replace existing window in bathroom, non-street facing. in kind remodel. max u factor 0.3 | $50,000 |
| Apr 7, 2023 | Never finaled issued Apr 2023, no final | 201 14th Av | comply with nov# 202303713: remodel of (3) kitchens and (6) bathrooms in kind. call for start of work inspection upon issuance of permit.Details
comply with nov# 202303713: remodel of (3) kitchens and (6) bathrooms in kind. call for start of work inspection upon issuance of permit. | $67,000 |
| Mar 16, 2023 | Completed final sign-off May 2024 | 370 Union St | (1) kitchen and (1) bathroom remodel and rewire the electrical for unit 370.Details
(1) kitchen and (1) bathroom remodel and rewire the electrical for unit 370. | $70,000 |
| Jun 6, 2022 | Completed final sign-off Apr 2023 | 671 Laguna Honda Bl | remodel (2) bathrooms and kitchen in-kind. new cabinets, sinks, countertops, bathtub, vanity, toilets. no structural work. bathroom size 5x8 and kitchen 10x10 ft.Details
remodel (2) bathrooms and kitchen in-kind. new cabinets, sinks, countertops, bathtub, vanity, toilets. no structural work. bathroom size 5x8 and kitchen 10x10 ft. | $42,000 |
| Jun 2, 2022 | Expired or cancelled cancelled Jul 2023 | 1442 Broadway | (rear building) unit # 3, #4, #6: remodel kitchen & bathroom. total of 3 kitchens and 3 bathrooms.Details
(rear building) unit # 3, #4, #6: remodel kitchen & bathroom. total of 3 kitchens and 3 bathrooms. | $135,000 |
| Jun 2, 2022 | Expired or cancelled cancelled May 2024 | 1442 Broadway | (front building) remodel one kitchen & one bathroom.non structuralDetails
(front building) remodel one kitchen & one bathroom.non structural | $45,000 |
| Aug 11, 2021 | Completed final sign-off Aug 2025 | 1457 Hudson Av | installation of bathroom in the attic bedroom #3. interior remodel: main flr kitchen are to be remodeled. basement unit: kitchen re-design and updated. (e) bathroom remodel and relocated. add laundry room (52sf)Details
installation of bathroom in the attic bedroom #3. interior remodel: main flr kitchen are to be remodeled. basement unit: kitchen re-design and updated. (e) bathroom remodel and relocated. add laundry room (52sf) | $75,000 |
| Mar 11, 2021 | Never finaled issued Oct 2022, no final | 630 Geary St | comply w/nov 202173833 & 202173835. convert(e) basement entertainment rm to(n) storage rm w/full bath, convert(e) communal baths on flrs 1-5 to (n) utility closets w/janitorial sinks, 1/f reconfig/change use of 2(e) rms to (n) ofc & restore kitchen to mgrs dwelling unit. convert 30(e) guest rmDetails
comply w/nov 202173833 & 202173835. convert(e) basement entertainment rm to(n) storage rm w/full bath, convert(e) communal baths on flrs 1-5 to (n) utility closets w/janitorial sinks, 1/f reconfig/change use of 2(e) rms to (n) ofc & restore kitchen to mgrs dwelling unit. convert 30(e) guest rm | $100,000 |