Back to bathroom remodel contractors
4-Mac Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2018 to Jul 2026
- Last 24 months
- 32 permits filed
82 permits since 2000: 43 completed, 21 in progress, 12 never finaled, 6 expired or cancelled.
Of the 12 never-finaled permits, 12 are 3 to 5 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
30 bathroom remodel permits: 18 completed, 5 in progress, 4 never finaled, 3 expired or cancelled. Typically 6 days from filing to permit and 300 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 15, 2026 | In progress filed Jul 2026, not yet issued | 610 Polk St | remodel in-kind 49 bathrooms from 2nd floor thru 6th floor.units 209-212, 214-218, 308-312, 408-412, 414-418, 508-512, 514-518, 608-612, 614-618. five bathrms(218, 318, 418, 518, 618) will be remodel as accessible. no residential rooms coverted or removed under this permit.Details
remodel in-kind 49 bathrooms from 2nd floor thru 6th floor.units 209-212, 214-218, 308-312, 408-412, 414-418, 508-512, 514-518, 608-612, 614-618. five bathrms(218, 318, 418, 518, 618) will be remodel as accessible. no residential rooms coverted or removed under this permit. | $400,000 |
| Jun 9, 2025 | In progress issued Jul 2025 | 34 06th St | 2/f to 7/f (residential floors): new in kind alteration and remodel to (e) typical stacked bathrooms at 2/f, 3/f, 4/f, 5/f, 6/f and 7/f.Details
2/f to 7/f (residential floors): new in kind alteration and remodel to (e) typical stacked bathrooms at 2/f, 3/f, 4/f, 5/f, 6/f and 7/f. | $100,000 |
| May 29, 2025 | In progress issued May 2025 | 2237 Mason St | only where needed remove and replace in kind sheet rock or lath and plaster 5/8 typ x for new plumbing for existing bathrooms. replace existing panels where needed from ceiling in dining area. no change in bathroom layout. all works on ceilingDetails
only where needed remove and replace in kind sheet rock or lath and plaster 5/8 typ x for new plumbing for existing bathrooms. replace existing panels where needed from ceiling in dining area. no change in bathroom layout. all works on ceiling | $3,000 |
| Mar 18, 2025 | Completed final sign-off Jan 2026 | 587 Eddy St | new alteration to existing typical bathrooms at bedroom. #306,406,506,606Details
new alteration to existing typical bathrooms at bedroom. #306,406,506,606 | $35,000 |
| Feb 26, 2025 | Completed final sign-off Jan 2026 | 520 South Van Ness Av | 3/fl-(n) alteration and remodel to (e) 3rd floor mens and womens bathroomDetails
3/fl-(n) alteration and remodel to (e) 3rd floor mens and womens bathroom | $150,000 |
| Dec 3, 2024 | In progress filed Dec 2024, not yet issued | 505 Ofarrell St | unit 515 and 315: remodel 2 bathrooms in kind in the rooms. ne wshower pan, new sink, new toilet.Details
unit 515 and 315: remodel 2 bathrooms in kind in the rooms. ne wshower pan, new sink, new toilet. | $40,000 |
| Dec 3, 2024 | Expired or cancelled withdrawn Aug 2025 | 610 Fillmore St | unit 106, 206, and 306: remodel 3 bathrooms voluntary upgrade into ada bathrooms . new shower pan, new toilet, new sinkDetails
unit 106, 206, and 306: remodel 3 bathrooms voluntary upgrade into ada bathrooms . new shower pan, new toilet, new sink | $60,000 |
| Sep 16, 2024 | Completed final sign-off Oct 2024 | 505 Ofarrell St | unti's 415 and 615: (2) bath remodel: replace 2 shower pans, install new toilet, install (2) new sinks and retile walls and floor in the rooms. no structural work.Details
unti's 415 and 615: (2) bath remodel: replace 2 shower pans, install new toilet, install (2) new sinks and retile walls and floor in the rooms. no structural work. | $21,200 |
| Jul 18, 2024 | Completed final sign-off Oct 2024 | 908 Post St | unit 23: new bathroom in sleeping rm # 23. no kitchen to be addedDetails
unit 23: new bathroom in sleeping rm # 23. no kitchen to be added | $21,000 |
| Jul 3, 2024 | Completed final sign-off Oct 2024 | 427 Madrid St | remodel bathroom 5x8 ft in kind, no moving walls. new toilet, new shower pan, new vanity. all fixtures to remain in same location.Details
remodel bathroom 5x8 ft in kind, no moving walls. new toilet, new shower pan, new vanity. all fixtures to remain in same location. | $21,500 |
| Mar 25, 2024 | Completed final sign-off May 2024 | 34 06th St | replace 30 (e) wood doors to metal doors. (bathrooms doors, storage, and offices) maintain rating of doors.Details
replace 30 (e) wood doors to metal doors. (bathrooms doors, storage, and offices) maintain rating of doors. | $28,000 |
| Jan 26, 2024 | Completed final sign-off Mar 2026 | 13 Forest Knolls Dr | revision to pa# 202002124281, shuffle kitchen fixtures. relocate bathroom fixtures.Details
revision to pa# 202002124281, shuffle kitchen fixtures. relocate bathroom fixtures. | $100 |
| Oct 27, 2023 | Completed final sign-off Dec 2024 | 520 South Van Ness Av | new alteration; remodel to (e) 2/f women's bathroom-replace partition walls; stalls; (n) finishes and waterproofing, new fixtures; restroom accessories, new lighting; electrical fixtures, new soffit.Details
new alteration; remodel to (e) 2/f women's bathroom-replace partition walls; stalls; (n) finishes and waterproofing, new fixtures; restroom accessories, new lighting; electrical fixtures, new soffit. | $100,000 |
| Aug 2, 2023 | In progress issued Mar 2025 | 1918 Clement St | interior remodel of 1st fl. remodel to include dinning area, kitchen, bathroom and office. change of use to (n) lmted restaurant mep deferred.Details
interior remodel of 1st fl. remodel to include dinning area, kitchen, bathroom and office. change of use to (n) lmted restaurant mep deferred. | $120,000 |
| May 19, 2023 | Completed final sign-off May 2024 | 372 Union St | remodel 1-kitchen and 1-bathroom, rewire electrical for this unit and install & replace existing window in bathroom, non-street facing. in kind remodel. max u factor 0.3Details
remodel 1-kitchen and 1-bathroom, rewire electrical for this unit and install & replace existing window in bathroom, non-street facing. in kind remodel. max u factor 0.3 | $50,000 |
| Apr 27, 2023 | Completed final sign-off Jul 2025 | 1018 Mission St | relocation of (e) managers unit @ 2nd flr, new bathrooms for rooms on 2-5 flrs, 4 new bathrooms w/grab bars @ rooms 117, 217, 317 & 417, new common use offices for residents on 2-5 flrs, no change to (e) unit count. new ada push button at g/f, new reception counter.Details
relocation of (e) managers unit @ 2nd flr, new bathrooms for rooms on 2-5 flrs, 4 new bathrooms w/grab bars @ rooms 117, 217, 317 & 417, new common use offices for residents on 2-5 flrs, no change to (e) unit count. new ada push button at g/f, new reception counter. | $1,660,000 |
| Apr 7, 2023 | Never finaled issued Apr 2023, no final | 201 14th Av | comply with nov# 202303713: remodel of (3) kitchens and (6) bathrooms in kind. call for start of work inspection upon issuance of permit.Details
comply with nov# 202303713: remodel of (3) kitchens and (6) bathrooms in kind. call for start of work inspection upon issuance of permit. | $67,000 |
| Mar 16, 2023 | Completed final sign-off May 2024 | 370 Union St | (1) kitchen and (1) bathroom remodel and rewire the electrical for unit 370.Details
(1) kitchen and (1) bathroom remodel and rewire the electrical for unit 370. | $70,000 |
| Dec 16, 2022 | Never finaled issued Dec 2022, no final | 1024 Mission St | remodel bathroom, in kindDetails
remodel bathroom, in kind | $15,003 |
| Jun 6, 2022 | Completed final sign-off Apr 2023 | 671 Laguna Honda Bl | remodel (2) bathrooms and kitchen in-kind. new cabinets, sinks, countertops, bathtub, vanity, toilets. no structural work. bathroom size 5x8 and kitchen 10x10 ft.Details
remodel (2) bathrooms and kitchen in-kind. new cabinets, sinks, countertops, bathtub, vanity, toilets. no structural work. bathroom size 5x8 and kitchen 10x10 ft. | $42,000 |
| Jun 6, 2022 | Never finaled issued Jun 2022, no final | 51 Rio Ct | remodel bathroom in-kind. 5 x 8 ft. new sink, new showe pan, new vanity.Details
remodel bathroom in-kind. 5 x 8 ft. new sink, new showe pan, new vanity. | $12,500 |
| Jun 2, 2022 | Expired or cancelled cancelled May 2024 | 1442 Broadway | (front building) remodel one kitchen & one bathroom.non structuralDetails
(front building) remodel one kitchen & one bathroom.non structural | $45,000 |
| Jun 2, 2022 | Expired or cancelled cancelled Jul 2023 | 1442 Broadway | (rear building) unit # 3, #4, #6: remodel kitchen & bathroom. total of 3 kitchens and 3 bathrooms.Details
(rear building) unit # 3, #4, #6: remodel kitchen & bathroom. total of 3 kitchens and 3 bathrooms. | $135,000 |
| Feb 15, 2022 | Completed final sign-off Apr 2024 | 2057 Green St | bath room remodel, replace bath tub and faucet, replace toliet and sink, replace switches and outletDetails
bath room remodel, replace bath tub and faucet, replace toliet and sink, replace switches and outlet | $14,000 |
| Feb 15, 2022 | Completed final sign-off Apr 2022 | 1452 Clement St | remodel one bath room, replace faucet, replace sink, replace tiles, install new fan. maintain rated separation between dwelling units. exhaust terminate 3' from pl & openings into the bldg.Details
remodel one bath room, replace faucet, replace sink, replace tiles, install new fan. maintain rated separation between dwelling units. exhaust terminate 3' from pl & openings into the bldg. | $14,000 |
| Aug 11, 2021 | Completed final sign-off Aug 2025 | 1457 Hudson Av | installation of bathroom in the attic bedroom #3. interior remodel: main flr kitchen are to be remodeled. basement unit: kitchen re-design and updated. (e) bathroom remodel and relocated. add laundry room (52sf)Details
installation of bathroom in the attic bedroom #3. interior remodel: main flr kitchen are to be remodeled. basement unit: kitchen re-design and updated. (e) bathroom remodel and relocated. add laundry room (52sf) | $75,000 |
| Jun 10, 2021 | Completed final sign-off Oct 2021 | 459 Turk St | 1/f: remodel 2 bathrooms in kind in common area. replace shower valve, tile, shower pan. add grab bars in both bathrooms.Details
1/f: remodel 2 bathrooms in kind in common area. replace shower valve, tile, shower pan. add grab bars in both bathrooms. | $12,000 |
| Jun 10, 2021 | Completed final sign-off Jul 2023 | 2849 Bryant St | 570 sqfr of existing basement remodeled to new bedroom, laundry room & full bathroom. windows & doors will be replaced at ground fl rear. existing exterior spiral stairs at rear to be replaced with straight stairs.Details
570 sqfr of existing basement remodeled to new bedroom, laundry room & full bathroom. windows & doors will be replaced at ground fl rear. existing exterior spiral stairs at rear to be replaced with straight stairs. | $45,000 |
| Mar 11, 2021 | Never finaled issued Oct 2022, no final | 630 Geary St | comply w/nov 202173833 & 202173835. convert(e) basement entertainment rm to(n) storage rm w/full bath, convert(e) communal baths on flrs 1-5 to (n) utility closets w/janitorial sinks, 1/f reconfig/change use of 2(e) rms to (n) ofc & restore kitchen to mgrs dwelling unit. convert 30(e) guest rmDetails
comply w/nov 202173833 & 202173835. convert(e) basement entertainment rm to(n) storage rm w/full bath, convert(e) communal baths on flrs 1-5 to (n) utility closets w/janitorial sinks, 1/f reconfig/change use of 2(e) rms to (n) ofc & restore kitchen to mgrs dwelling unit. convert 30(e) guest rm | $100,000 |
| Dec 4, 2018 | Completed final sign-off Dec 2024 | 520 South Van Ness Av | interior new alteration to e 2nd fl mens bath to comply with nov 201802994Details
interior new alteration to e 2nd fl mens bath to comply with nov 201802994 | $150,000 |