Block 3703, lot 028
74 06th St
- City’s use
- Commercial Hotel
- Built
- 1907
- Stories
- 5
- Units
- 3
- Rooms
- 26 bathrooms
- Building
- 33,952 sq ft
- Lot
- 7,997 sq ft
- Zoning
- RSD
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
72 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 16, 2026 | In progress issued Sep 2026 | 74 06th St | Ambrocio Construction Inc | comply with complaint 202661911, item #4:c: the 2 side shower rooms next to the stiars on the 2/f had the drywall and shower pans removed. to sheetrock & weatherproof showerpan & retile. item 8: replace interior handrails from basement to ground floor.Details
comply with complaint 202661911, item #4:c: the 2 side shower rooms next to the stiars on the 2/f had the drywall and shower pans removed. to sheetrock & weatherproof showerpan & retile. item 8: replace interior handrails from basement to ground floor. | $10,500 |
| Jun 5, 2025 | Completed final sign-off Jun 2026 | 74 06th St | 4-Mac Construction | repair in kind: patch & remodel cracked brick veneer, cornices, brick mortar joints. reseal wall penetrations, clean and recoat areas of corrosion. repaint/repair window frames as needed. lubricate/paint fire escapes. repaint chipped parge where needed. repair and seal cracked parapet coping.Details
repair in kind: patch & remodel cracked brick veneer, cornices, brick mortar joints. reseal wall penetrations, clean and recoat areas of corrosion. repaint/repair window frames as needed. lubricate/paint fire escapes. repaint chipped parge where needed. repair and seal cracked parapet coping. | $10,000 |
| Jan 10, 2022 | Completed final sign-off Jun 2022 | 72 06th St | S F Garage Company Inc. | replace in kind 5-10 spalling bricks located at corner facade on jessie st. and 3-5 bricks dislodged bricks located on or close to corner of jessie st. and parking lot behind bldgDetails
replace in kind 5-10 spalling bricks located at corner facade on jessie st. and 3-5 bricks dislodged bricks located on or close to corner of jessie st. and parking lot behind bldg | $2,000 |
| Sep 8, 2020 | Completed final sign-off Nov 2021 | 74 06th St | 3 Mac Construction | bathroom remodeling: 3 shower rooms new tile. 3 ada bathrooms paint and new tile only.Details
bathroom remodeling: 3 shower rooms new tile. 3 ada bathrooms paint and new tile only. | $40,000 |
| Jun 8, 2020 | Completed final sign-off Aug 2020 | 74 06th St | Innovative Construction Implement | replace a total of (26) 90-min fire rated metal doors with frame in existing locations, in-kind, on floors 2-5 to all trash rooms and bathroom rooms in common/public areas in hallways. maher n/a.Details
replace a total of (26) 90-min fire rated metal doors with frame in existing locations, in-kind, on floors 2-5 to all trash rooms and bathroom rooms in common/public areas in hallways. maher n/a. | $30,000 |
| Dec 27, 2019 | Completed final sign-off Jun 2021 | 74 06th St | Data Glass Company | one fire escape window replaced in kind same style and operation but material will be all wood window on third floor jessie st side to comply with nov 201979861 #2.Details
one fire escape window replaced in kind same style and operation but material will be all wood window on third floor jessie st side to comply with nov 201979861 #2. | $800 |
| Dec 19, 2019 | Completed final sign-off Mar 2020 | 74 06th St | Innovative Construction Implement | remove and replace (8) 90 min fire rated metal doors with frame to 2nd,3rd,4th and 5th level bedroom entrance. remove and replace (8) 90 min fire rated metal doors with frame to 2nd,3rd,4th and 5th level to hotel rooms entrance. total of (16) 90 min fire rated matel doors with frame.Details
remove and replace (8) 90 min fire rated metal doors with frame to 2nd,3rd,4th and 5th level bedroom entrance. remove and replace (8) 90 min fire rated metal doors with frame to 2nd,3rd,4th and 5th level to hotel rooms entrance. total of (16) 90 min fire rated matel doors with frame. | $3,000 |
| Nov 6, 2019 | Completed final sign-off Dec 2019 | 74 06th St | repair 1st to 2nd fl handrail less than 20'.Details
repair 1st to 2nd fl handrail less than 20'. | $2,000 | |
| Jun 26, 2019 | Never finaled filed Jun 2019, never issued | 74 06th St | (n) accessory dwelling unit addition w/in (e) bldg footprint at lower level/basement flr. this includes (n) kitchen,bath,living/sleeping area per ord# 162-17.Details
(n) accessory dwelling unit addition w/in (e) bldg footprint at lower level/basement flr. this includes (n) kitchen,bath,living/sleeping area per ord# 162-17. | $125,000 | |
| Apr 18, 2019 | Never finaled issued Apr 2019, no final | 76 06th St | United California Glass And Door | installing 3 folding scissor gates, two on exterior window that will provide visiblity into storefront when closed. one scissor gate will be in jamb mounted inside the vestibule towards face of the bldg. it will swing and store against right hand wall when in open position.Details
installing 3 folding scissor gates, two on exterior window that will provide visiblity into storefront when closed. one scissor gate will be in jamb mounted inside the vestibule towards face of the bldg. it will swing and store against right hand wall when in open position. | $7,820 |
| Mar 28, 2019 | Completed final sign-off Apr 2019 | 74 06th St | replace missing 1/f to 2/f handrail. to comply with complaint 201939821Details
replace missing 1/f to 2/f handrail. to comply with complaint 201939821 | $2,000 | |
| Oct 23, 2018 | Completed final sign-off Nov 2018 | 72 06th St | G C Builders | 2/f: install new ada shower bench to wall within (e) shower roomDetails
2/f: install new ada shower bench to wall within (e) shower room | $2,000 |
| Jul 31, 2018 | Completed final sign-off Sep 2018 | 74 06th St | Western City Construction Co | repair rleaking problem of 2 shower on 2nd fl and one on 5th flDetails
repair rleaking problem of 2 shower on 2nd fl and one on 5th fl | $3,000 |
| Apr 17, 2018 | Completed final sign-off May 2018 | 74 06th St | G C Builders | 4th and 5th flr. remove and replace all tile and sheetrock from shower stall walls, replace 1 electrical switch, install new hardieback board waterproof shower stall with shower pan test. install new tile at 4th and 5th floor shower area.Details
4th and 5th flr. remove and replace all tile and sheetrock from shower stall walls, replace 1 electrical switch, install new hardieback board waterproof shower stall with shower pan test. install new tile at 4th and 5th floor shower area. | $20,000 |
| Nov 30, 2017 | Completed final sign-off Feb 2018 | 74 06th St | 3 Mac Construction | damage wall repair in kind (10ft x 10ft). no structural work. complaint with line # 09. nov # 201700241Details
damage wall repair in kind (10ft x 10ft). no structural work. complaint with line # 09. nov # 201700241 | $2,000 |
| Nov 1, 2017 | Completed final sign-off Feb 2018 | 74 06th St | G C Builders | remove tile from 2nd & 3rd floor shower stall, remove any dryrot in framing, replace shower valve and re-ajust floor drain. replace old receptacles and light switches, replace exhaust fan in kind in room 343 & 330. remodel 2 bathrooms, to comply with nov# 2017400241Details
remove tile from 2nd & 3rd floor shower stall, remove any dryrot in framing, replace shower valve and re-ajust floor drain. replace old receptacles and light switches, replace exhaust fan in kind in room 343 & 330. remodel 2 bathrooms, to comply with nov# 2017400241 | $30,000 |
| Aug 9, 2017 | Completed final sign-off Aug 2017 | 74 06th St | G C Builders | 4/f common restroom in hallway- replace tile floor in shower area, install new tileDetails
4/f common restroom in hallway- replace tile floor in shower area, install new tile | $6,000 |
| Jun 27, 2017 | Completed final sign-off Jul 2017 | 74 06th St | G C Builders | remove and replacee tile in shower/bathroom floor on 3rd floorDetails
remove and replacee tile in shower/bathroom floor on 3rd floor | $6,800 |
| May 26, 2017 | Never finaled issued May 2017, no final | 74 06th St | G C Builders | to comply with nov 201766521 item 4 only: replace 2nd floor tile in shower stall with newDetails
to comply with nov 201766521 item 4 only: replace 2nd floor tile in shower stall with new | $5,000 |
| Mar 21, 2017 | Expired or cancelled expired Dec 2024 | 74 06th St | S F Garage Company Inc. | interior exploratory demo: to determine location & size of beam for possible soft story upgrade.Details
interior exploratory demo: to determine location & size of beam for possible soft story upgrade. | $500 |
| Mar 3, 2017 | Never finaled issued Mar 2017, no final | 74 06th St | street spaceDetails
street space | ||
| Nov 28, 2016 | Completed final sign-off Dec 2016 | 74 06th St | Delvin Garcia Construction | renewal of expired permit # 201410108702 for final inspecton. all work are complete.Details
renewal of expired permit # 201410108702 for final inspecton. all work are complete. | |
| Nov 28, 2016 | Never finaled issued Nov 2016, no final | 74 06th St | Delvin Garcia Construction | renewal of expired permit # 201306119203. for final inspecton. all work are complete.Details
renewal of expired permit # 201306119203. for final inspecton. all work are complete. | |
| Nov 10, 2016 | Never finaled issued Nov 2016, no final | 72 06th St | street spaceDetails
street space | ||
| Oct 24, 2016 | Completed final sign-off Dec 2016 | 74 06th St | Monarch Builders Inc | to comply with 201641281: replace (e) reception deskDetails
to comply with 201641281: replace (e) reception desk | $3,500 |
| Jul 26, 2016 | Completed final sign-off Jul 2016 | 74 06th St | Occidental Express | to comply with nov 201385773 - renewal o f expired pa 2010-0330-9232, 2006-1205-9143 & 2006-0619-4444 for final inspectionDetails
to comply with nov 201385773 - renewal o f expired pa 2010-0330-9232, 2006-1205-9143 & 2006-0619-4444 for final inspection | |
| Jul 26, 2016 | Completed final sign-off Jul 2016 | 74 06th St | Occidental Express | to comply with nov 201385773 - renewal of expired pa 2003-0508-4046, 2002-0606-8353 and 9314991 for final inspectionDetails
to comply with nov 201385773 - renewal of expired pa 2003-0508-4046, 2002-0606-8353 and 9314991 for final inspection | |
| Jul 26, 2016 | Completed final sign-off Jul 2016 | 74 06th St | Occidental Express | to comply with nov 201385773 - renewal o f expired pa 9211065Details
to comply with nov 201385773 - renewal o f expired pa 9211065 | |
| Jul 26, 2016 | Completed final sign-off Jul 2016 | 74 06th St | Occidental Express | to comply with nov 201385773 - renewal of expired pa 2006-0224-5377, 2004-1004-5868 and 2004-0706-8071 for final inspectionDetails
to comply with nov 201385773 - renewal of expired pa 2006-0224-5377, 2004-1004-5868 and 2004-0706-8071 for final inspection | |
| Sep 28, 2015 | Completed final sign-off Feb 2016 | 74 06th St | Kelly And Son | fire sprinkler relocation and addition to existing fire system. 13 new heads. relocate 2 heads. reference ti 2015.0422.4321Details
fire sprinkler relocation and addition to existing fire system. 13 new heads. relocate 2 heads. reference ti 2015.0422.4321 | $8,800 |
| Jul 15, 2015 | Completed final sign-off Jan 2016 | 72 06th St | San Francisco Fire Protection | to obtain final inspectioin for work approved under pa# 200602245377. all work is complete.Details
to obtain final inspectioin for work approved under pa# 200602245377. all work is complete. | |
| Jul 15, 2015 | Completed final sign-off Jan 2016 | 72 06th St | San Francisco Fire Protection | renew for final 200606194444. all work is completeDetails
renew for final 200606194444. all work is complete | |
| Apr 22, 2015 | Never finaled issued May 2015, no final | 74 06th St | Alpha Construction Co *Stop Issusing* | renovation of 1st fl,basement,inerior finishes:2 accessible bathrs,addl kitchen,add laundry&mailboxes for tenant use, replace front auto sliding door system, remodel front/rear lobby,managers office,breakroom,ad storage see 1008.1.4.3 cbcDetails
renovation of 1st fl,basement,inerior finishes:2 accessible bathrs,addl kitchen,add laundry&mailboxes for tenant use, replace front auto sliding door system, remodel front/rear lobby,managers office,breakroom,ad storage see 1008.1.4.3 cbc | $210,000 |
| Oct 10, 2014 | Expired or cancelled expired Nov 2016 | 74 06th St | S F Garage Company Inc. | install 100 wall sconces, total on the 2nd & 3rd floor hallway. replace 100 doortrims & trims on 2nd & 3rd floor. texture & paint on 2nd & 3rd fl.Details
install 100 wall sconces, total on the 2nd & 3rd floor hallway. replace 100 doortrims & trims on 2nd & 3rd floor. texture & paint on 2nd & 3rd fl. | $10,000 |
| Jun 3, 2014 | Completed final sign-off Jun 2014 | 74 06th St | Occidental Express | to obtain final inspection for work approved under pa# 200407068071. all work is complete.Details
to obtain final inspection for work approved under pa# 200407068071. all work is complete. | |
| Jun 3, 2014 | Completed final sign-off Jun 2014 | 74 06th St | Occidental Express | to obtain final inspection for work approved under pa# 200206068353. all work is complete.Details
to obtain final inspection for work approved under pa# 200206068353. all work is complete. | |
| Jun 3, 2014 | Completed final sign-off Jun 2014 | 74 06th St | Occidental Express | to obtain final inspection for work approved under pa# 9314991. all work is complete.Details
to obtain final inspection for work approved under pa# 9314991. all work is complete. | |
| Jun 3, 2014 | Completed final sign-off Jun 2014 | 74 06th St | Occidental Express | to obtain final inspection for work approved under pa# 200004016095. all work is complete.Details
to obtain final inspection for work approved under pa# 200004016095. all work is complete. | |
| Jun 3, 2014 | Completed final sign-off Jun 2014 | 74 06th St | Occidental Express | to obtain final inspection for work approved under pa# 200306106740. all work is complete.Details
to obtain final inspection for work approved under pa# 200306106740. all work is complete. | |
| May 28, 2014 | Completed final sign-off May 2014 | 72 06th St | Occidental Express | to obtain final inspection for work approved under pa 200612059143. all work is complete. compliance with ord 155-13 not requiredDetails
to obtain final inspection for work approved under pa 200612059143. all work is complete. compliance with ord 155-13 not required | |
| May 28, 2014 | Completed final sign-off May 2014 | 72 06th St | Occidental Express | to obtain final inspection for work approved under pa 200606204538. all work is complete. compliance with ord 155-13 not requiredDetails
to obtain final inspection for work approved under pa 200606204538. all work is complete. compliance with ord 155-13 not required | |
| May 28, 2014 | Completed final sign-off May 2014 | 72 06th St | Occidental Express | to obtain final inspection for work approved under 200810073641. all work is complete. compliance with ord 155-13 not requiredDetails
to obtain final inspection for work approved under 200810073641. all work is complete. compliance with ord 155-13 not required | |
| Nov 21, 2013 | Completed final sign-off Dec 2013 | 72 06th St | Occidental Express | complying with nov 201322531. installing heating duct to room 208 from existing heating duct. also complying with novs - 201322682, 2013233512, 201322191 & ord 029-13 for installing grab bars in common bathroomsDetails
complying with nov 201322531. installing heating duct to room 208 from existing heating duct. also complying with novs - 201322682, 2013233512, 201322191 & ord 029-13 for installing grab bars in common bathrooms | $2,500 |
| Jun 11, 2013 | Expired or cancelled expired Nov 2016 | 74 06th St | comply with ordinance 029-13. 5 floors. 17 showers, 14 toilets, 31 brab barsDetails
comply with ordinance 029-13. 5 floors. 17 showers, 14 toilets, 31 brab bars | $1,000 | |
| Nov 7, 2012 | Completed final sign-off Feb 2013 | 74 06th St | B B J Electric, Inc | add notification devices to (e) fire alarm system for new tenant space-8 new devicesDetails
add notification devices to (e) fire alarm system for new tenant space-8 new devices | $5,800 |
| Oct 16, 2012 | Never finaled issued Oct 2012, no final | 72 06th St | revision to pa#201109094224 & 201207275976. interior remodel, partition and hvac changesDetails
revision to pa#201109094224 & 201207275976. interior remodel, partition and hvac changes | ||
| Jul 27, 2012 | Never finaled issued Aug 2012, no final | 72 06th St | enclose an existing opening in the framing of 1st floor - replace affected floor framing across load bearing wall.Details
enclose an existing opening in the framing of 1st floor - replace affected floor framing across load bearing wall. | $2,000 | |
| Sep 9, 2011 | Never finaled issued Feb 2012, no final | 72 06th St | change of use from (e) laundry to (n) office use at sfpd substation, includes new offices, new conference area, new kitchenette, new accessible bathrms, showers, entry and glazing.Details
change of use from (e) laundry to (n) office use at sfpd substation, includes new offices, new conference area, new kitchenette, new accessible bathrms, showers, entry and glazing. | $400,000 | |
| Jul 8, 2011 | Expired or cancelled expired Dec 2012 | 74 06th St | Occidental Express | obtain final inspection for work approved under pa# 2010-0330-9232. all work is completeDetails
obtain final inspection for work approved under pa# 2010-0330-9232. all work is complete | |
| Jun 6, 2011 | Completed final sign-off Feb 2013 | 72 06th St | Liu Plumbing | install (7) new heads in basement. install (38) new heads in t.i. spaces on 1st floor & upgrade main riser in basement.Details
install (7) new heads in basement. install (38) new heads in t.i. spaces on 1st floor & upgrade main riser in basement. | $18,000 |
| Mar 30, 2010 | Completed final sign-off Dec 2012 | 74 06th St | Occidental Express | upgrading bathrooms at 2nd., 3rd., 4th. & 5th. flrs. by adding accessible shower, tub & 2-toilets on each flr. remodeling first flr. lobby, bathrooms & entry. comply with his/nov 200915862, 201034604 & 2005604425.Details
upgrading bathrooms at 2nd., 3rd., 4th. & 5th. flrs. by adding accessible shower, tub & 2-toilets on each flr. remodeling first flr. lobby, bathrooms & entry. comply with his/nov 200915862, 201034604 & 2005604425. | $185,000 |
| Mar 11, 2009 | Expired or cancelled expired Dec 2012 | 72 06th St | San Francisco Fire Protection | renew pa# 2006/06/19/4444 to complete work & obtain final inspection.Details
renew pa# 2006/06/19/4444 to complete work & obtain final inspection. | $30,000 |
| Oct 7, 2008 | Expired or cancelled expired Dec 2012 | 74 06th St | Occidental Express | replacing gas fired forced air furnaces (5) on 5 floors including deteriorated ducting same locationsDetails
replacing gas fired forced air furnaces (5) on 5 floors including deteriorated ducting same locations | $75,000 |
| Apr 24, 2008 | Expired or cancelled expired Dec 2012 | 74 06th St | renew appl#200305084046 for final inspection.Details
renew appl#200305084046 for final inspection. | ||
| Mar 11, 2008 | Never finaled issued Mar 2008, no final | 74 06th St | street spaceDetails
street space | ||
| Dec 4, 2007 | Completed final sign-off Mar 2008 | 72 06th St | Occidental Express | renew expired app #200507268652 and app #200407068071 for final inspectionDetails
renew expired app #200507268652 and app #200407068071 for final inspection | |
| Nov 20, 2007 | Never finaled issued Nov 2007, no final | 72 06th St | Occidental Express | replace door w/ 20 min rate, remodel bathrms, replacing plumbing & electrical fixtures, runaces, windows not visible from st. plaster repair and comply w/ active complaints.Details
replace door w/ 20 min rate, remodel bathrms, replacing plumbing & electrical fixtures, runaces, windows not visible from st. plaster repair and comply w/ active complaints. | $286,000 |
| Aug 28, 2007 | Never finaled issued Aug 2007, no final | 74 06th St | street space permit only.Details
street space permit only. | ||
| Dec 5, 2006 | Expired or cancelled expired Dec 2012 | 74 06th St | Occidental Express | replacing guest room doors with 20 min rated doors, remodeling of bathrooms including replacing plumbing fixtures, plaster repair. to comply w/nov#200670728,#200667557,#200671606,#200670542, and #200564264.Details
replacing guest room doors with 20 min rated doors, remodeling of bathrooms including replacing plumbing fixtures, plaster repair. to comply w/nov#200670728,#200667557,#200671606,#200670542, and #200564264. | $132,000 |
| Aug 4, 2006 | Never finaled issued Aug 2006, no final | 72 06th St | S M Construction/Assoc. *Check For I.D* | renew appl#200507268652 inspectionDetails
renew appl#200507268652 inspection | |
| Jun 20, 2006 | Expired or cancelled expired Nov 2007 | 72 06th St | Occidental Express | renovating common bathrooms on all floors including repalcing tile, plmg and electrical fixtures and painting. also misc door and wndw repairs, painting and flooring o.s. flourescent lights in bathDetails
renovating common bathrooms on all floors including repalcing tile, plmg and electrical fixtures and painting. also misc door and wndw repairs, painting and flooring o.s. flourescent lights in bath | $196,000 |
| Jun 19, 2006 | Expired or cancelled expired Nov 2007 | 72 06th St | San Francisco Fire Protection | install fire control panel, remote annunciator(horn in every unit)all areas horn/strobes and smoke detection inall areasDetails
install fire control panel, remote annunciator(horn in every unit)all areas horn/strobes and smoke detection inall areas | $42,000 |
| Feb 24, 2006 | Expired or cancelled expired Apr 2008 | 72 06th St | San Francisco Fire Protection | add on additional horns and horn/strobes to increase audibility throughout building in addition to 200410045868. permit retains to water flow monituring sro-170-2. additional audible required per anj.Details
add on additional horns and horn/strobes to increase audibility throughout building in addition to 200410045868. permit retains to water flow monituring sro-170-2. additional audible required per anj. | $5,000 |
| Jul 26, 2005 | Never finaled issued Aug 2005, no final | 72 06th St | S M Construction/Assoc. *Check For I.D* | new retaining walls. rev to pa# 2004/07/06/8071.Details
new retaining walls. rev to pa# 2004/07/06/8071. | |
| Oct 13, 2004 | Never finaled issued Oct 2004, no final | 72 06th St | street space permitDetails
street space permit | ||
| Oct 4, 2004 | Completed final sign-off May 2014 | 72 06th St | San Francisco Fire Protection | connect (e) fire alarm panel to newly installed sprinkler systemDetails
connect (e) fire alarm panel to newly installed sprinkler system | $500 |
| Jul 6, 2004 | Expired or cancelled expired Mar 2007 | 72 06th St | S M Construction/Assoc. *Check For I.D* | a new retaining wall in bassemet at property lineDetails
a new retaining wall in bassemet at property line | $65,000 |
| Jun 10, 2003 | Expired or cancelled expired Mar 2004 | 74 06th St | Occidental Express | repair minor fire, smoke/water damage in room #535, repair plaster, paint & replace carpet, no strucDetails
repair minor fire, smoke/water damage in room #535, repair plaster, paint & replace carpet, no struc | $1,500 |
| May 8, 2003 | Expired or cancelled cancelled Jun 2014 | 74 06th St | Ledda Plumbing Inc | updating fire system- ordinance 170-02- sro token sprinklers for guest rooms only, main system exiDetails
updating fire system- ordinance 170-02- sro token sprinklers for guest rooms only, main system exi | $15,000 |
| Nov 7, 2002 | Expired or cancelled cancelled Jun 2011 | 72 06th St | abandonment of vacant sus-sidewalk basement, build new closure wall at property line, backfilled walDetails
abandonment of vacant sus-sidewalk basement, build new closure wall at property line, backfilled wal | $25,000 | |
| Jun 6, 2002 | Expired or cancelled expired Jan 2006 | 74 06th St | Occidental Express | misc. fire & water & smoke damage repair incl. plaster repair, roof repair, elect & plbg repair, comDetails
misc. fire & water & smoke damage repair incl. plaster repair, roof repair, elect & plbg repair, com | $100,000 |
| Apr 1, 2000 | Expired or cancelled expired Oct 2000 | 72 06th St | Occidental Express | misc minor fire, smoke & water damage in rooms 208, 209, 210 & 250 including plaster repair & paintiDetails
misc minor fire, smoke & water damage in rooms 208, 209, 210 & 250 including plaster repair & painti | $9,650 |