3 Mac Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2016 to Dec 2021
- Last 24 months
- 0 permits filed
31 permits since 2000: 20 completed, 7 never finaled, 4 expired or cancelled.
Of the 7 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 23, 2021 | Never finaled issued Dec 2021, no final | 93 06th St | paint 30 rooms (10 x 10) and replace vinyl flooring. replace 30 smoke detectors in 30 rooms. replace 22 vanities to wall mount sinks. residential hotel - non-transient.Details
paint 30 rooms (10 x 10) and replace vinyl flooring. replace 30 smoke detectors in 30 rooms. replace 22 vanities to wall mount sinks. residential hotel - non-transient. | $14,000 |
| Jul 20, 2021 | Completed final sign-off Feb 2025 | 138 06th St | 2nd, 3rd, and 4th fl. new bath for every hotel room, 70 shower/toilet combo. new 7 mobility designated rooms. 4 ada bathrooms total.Details
2nd, 3rd, and 4th fl. new bath for every hotel room, 70 shower/toilet combo. new 7 mobility designated rooms. 4 ada bathrooms total. | $823,000 |
| Apr 16, 2021 | Completed final sign-off Aug 2021 | 1694 Grove St | unit 1694: kitchen & bathroom remodel in-kind. new cabinets, sink, countertop, toilet, tub, vanity, re-wire whole unit. no wall change. no layout change.Details
unit 1694: kitchen & bathroom remodel in-kind. new cabinets, sink, countertop, toilet, tub, vanity, re-wire whole unit. no wall change. no layout change. | $55,000 |
| Apr 13, 2021 | Expired or cancelled cancelled Sep 2023 | 48 Saturn St | exploratory drilling for bore sample for paeparation of soil report under supervision of engineer, back fill with lean concrete afterDetails
exploratory drilling for bore sample for paeparation of soil report under supervision of engineer, back fill with lean concrete after | $1,000 |
| Feb 25, 2021 | Completed final sign-off Oct 2021 | 909 Page St | replace siding of the south wall of the bldg. 30ft x 35ftDetails
replace siding of the south wall of the bldg. 30ft x 35ft | $11,000 |
| Dec 15, 2020 | Never finaled issued Dec 2020, no final | 1060 Filbert St | remove all lath and plaster throughout and install 5/8 type sheetrock on all wall and ceilings, on plwalls install typex lath and plaster also remove and replace all flooring with new hardwood flooring (excludes kitchnes and bathroomsDetails
remove all lath and plaster throughout and install 5/8 type sheetrock on all wall and ceilings, on plwalls install typex lath and plaster also remove and replace all flooring with new hardwood flooring (excludes kitchnes and bathrooms | $350,000 |
| Nov 18, 2020 | Completed final sign-off Jan 2021 | 525 Duncan St | replace 2 windows in kind. not street facing. replace 1 slidoing door in kind not street facing. dryrot repairDetails
replace 2 windows in kind. not street facing. replace 1 slidoing door in kind not street facing. dryrot repair | $5,500 |
| Nov 4, 2020 | Never finaled issued Nov 2020, no final | 505 Ofarrell St | remodel 80 rooms: paint, plank flooring, patch. install new faucets, sink. update elctrical work. new electrical in all rooms, install sub-panel each floor.Details
remodel 80 rooms: paint, plank flooring, patch. install new faucets, sink. update elctrical work. new electrical in all rooms, install sub-panel each floor. | $200,000 |
| Oct 19, 2020 | Completed final sign-off Jan 2021 | 525 Duncan St | remodel unit #02 bathroom and kitchen in kind. new cabinets, sinks, counter top. bath tub and vanity. no structural work. bathroom 5x8 ft kitchen 8x8 ft.Details
remodel unit #02 bathroom and kitchen in kind. new cabinets, sinks, counter top. bath tub and vanity. no structural work. bathroom 5x8 ft kitchen 8x8 ft. | $26,000 |
| Oct 19, 2020 | Completed final sign-off Dec 2020 | 256 Waterville St | replace 27 existing windows in kind. street facing. wood windows at the front facade.Details
replace 27 existing windows in kind. street facing. wood windows at the front facade. | $15,000 |
| Sep 8, 2020 | Completed final sign-off Oct 2020 | 126 Hyde St | exterior painting front of building only. 2 storyDetails
exterior painting front of building only. 2 story | $11,000 |
| Sep 8, 2020 | Completed final sign-off Nov 2021 | 74 06th St | bathroom remodeling: 3 shower rooms new tile. 3 ada bathrooms paint and new tile only.Details
bathroom remodeling: 3 shower rooms new tile. 3 ada bathrooms paint and new tile only. | $40,000 |
| Jul 2, 2020 | Expired or cancelled expired Apr 2024 | 630 Geary St | 54 rooms & bathrooms remodel in kind, paint, plank flooring & patch, remodel in kind manager unit, update all electricity & plumbing in all rooms, bath & hall, install sub panel on each fl. all work in kind & cosmeticDetails
54 rooms & bathrooms remodel in kind, paint, plank flooring & patch, remodel in kind manager unit, update all electricity & plumbing in all rooms, bath & hall, install sub panel on each fl. all work in kind & cosmetic | $200,000 |
| May 27, 2020 | Completed final sign-off Aug 2020 | 2844 21st St | unit #302: remodel kitchen and bathroom in the kind. new cabinets, sink, counter top, toilet, tub, vanity. no structural work.Details
unit #302: remodel kitchen and bathroom in the kind. new cabinets, sink, counter top, toilet, tub, vanity. no structural work. | $25,000 |
| Feb 21, 2020 | Completed final sign-off Jul 2020 | 565 Ellis St | remodel unit #14. bathroom and kitchen in kind. new cabinets, sinks, counter top. bath tub and vanity. no structural work. no alteration of walls. bathroom 5x8, kitchen 10x10.Details
remodel unit #14. bathroom and kitchen in kind. new cabinets, sinks, counter top. bath tub and vanity. no structural work. no alteration of walls. bathroom 5x8, kitchen 10x10. | $30,000 |
| Oct 8, 2019 | Completed final sign-off Oct 2021 | 246 Mcallister St | replace flooring, paint and electrical for 62 rooms with bathroom. paint, new light fixture lobby area.Details
replace flooring, paint and electrical for 62 rooms with bathroom. paint, new light fixture lobby area. | $80,500 |
| Sep 16, 2019 | Never finaled issued Sep 2019, no final | 2434 California St | unit 2 - remodel 1 existing kitchen and 1 bathroom. no changes in walls and openings. maintain 1-hr separation btw units & business areaDetails
unit 2 - remodel 1 existing kitchen and 1 bathroom. no changes in walls and openings. maintain 1-hr separation btw units & business area | $16,000 |
| Aug 7, 2019 | Completed final sign-off Jan 2021 | 256 Waterville St | revision to app#201906183729. remodel kitchen and 6 bathrooms. inkind new cabinets, sinks, showers and tubs. new lights and plugs. reframe bearing wall between kithcen and dining room.Details
revision to app#201906183729. remodel kitchen and 6 bathrooms. inkind new cabinets, sinks, showers and tubs. new lights and plugs. reframe bearing wall between kithcen and dining room. | |
| Jun 18, 2019 | Completed final sign-off Dec 2020 | 256 Waterville St | remodel kitchen & 4 bathrooms. in kind. new cabinets, sinks, shower & tubs. new lights & plugs.Details
remodel kitchen & 4 bathrooms. in kind. new cabinets, sinks, shower & tubs. new lights & plugs. | $86,500 |
| Apr 9, 2019 | Completed final sign-off May 2019 | 10 Lapham Wy | reroofing.Details
reroofing. | $8,800 |
| Feb 19, 2019 | Completed final sign-off Mar 2019 | 2330 17th St | to comply with nov201811901: repair (r) stairs, less than 50% repair. item #2. maher n/a.Details
to comply with nov201811901: repair (r) stairs, less than 50% repair. item #2. maher n/a. | $10,000 |
| Jan 11, 2019 | Never finaled issued Nov 2019, no final | 785 Brannan St | (n) accessible wc w/in (e) office space for staff @ lower levelDetails
(n) accessible wc w/in (e) office space for staff @ lower level | $11,000 |
| May 31, 2018 | Never finaled issued May 2018, no final | 1877 Union St | repair cracks and smooth it out. n/a for maher.Details
repair cracks and smooth it out. n/a for maher. | $4,000 |
| May 3, 2018 | Completed final sign-off Aug 2018 | 416 Duncan St | unit 7: remodel kitchen & bathroom in-kind, new cabinets, sinks, countertop, toilet, bathtub & vanity, (1) bathroom fan. no structural work.Details
unit 7: remodel kitchen & bathroom in-kind, new cabinets, sinks, countertop, toilet, bathtub & vanity, (1) bathroom fan. no structural work. | $25,000 |
| Mar 23, 2018 | Expired or cancelled expired May 2019 | 4828 Mission St | comply with nov 201851591. remodel kitchen and bath in kind. new cabinets, sinks, countertop, toilets, bath, vanity. no structural work. all work in unit 2 8x8 kitchen, 5x8 bath.no moving wallsDetails
comply with nov 201851591. remodel kitchen and bath in kind. new cabinets, sinks, countertop, toilets, bath, vanity. no structural work. all work in unit 2 8x8 kitchen, 5x8 bath.no moving walls | $36,000 |
| Dec 28, 2017 | Completed final sign-off Jan 2018 | 548 Steiner St | complaint # 201721321 (#552) for nov item #2: 8x8ft new ceiling installation, drywall - paint.Details
complaint # 201721321 (#552) for nov item #2: 8x8ft new ceiling installation, drywall - paint. | $1,000 |
| Nov 30, 2017 | Completed final sign-off Feb 2018 | 74 06th St | damage wall repair in kind (10ft x 10ft). no structural work. complaint with line # 09. nov # 201700241Details
damage wall repair in kind (10ft x 10ft). no structural work. complaint with line # 09. nov # 201700241 | $2,000 |
| Nov 21, 2017 | Expired or cancelled cancelled Jan 2026 | 33 Santa Monica Wy | remodel kitchen & 2 bedrooms. add 3 bathrooms. no exterior changes.Details
remodel kitchen & 2 bedrooms. add 3 bathrooms. no exterior changes. | $154,000 |
| Aug 1, 2017 | Completed final sign-off Jan 2018 | 10 Lapham Wy | remodel 3 bathrooms i nkind, & laundry room, new sink,s toilets, bathtubs, no structural work no chane to opening or wall layouts.Details
remodel 3 bathrooms i nkind, & laundry room, new sink,s toilets, bathtubs, no structural work no chane to opening or wall layouts. | $28,500 |
| Jul 5, 2017 | Completed final sign-off Jan 2020 | 161 11th Av | soft story retrofit per sfebc chapter 4d, engineering criteria 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d, engineering criteria 2016 cebc appendix a-4. | $75,000 |
| Mar 28, 2016 | Never finaled issued May 2016, no final | 251 15th Av | convert a portion of garage to a media room & laundry room (437 sq.ft.). 1/f- add patio to rear yard, add 1 bedroom & 1 bathroom, 2/f- renovate (e) dining, living, kitchen, 1/2 bath & remove 1 bath. enlarge (e) rear deck on 2/f. 3/f- renovate (e) beds/1 bath, add 2 bathrooms. window replacementDetails
convert a portion of garage to a media room & laundry room (437 sq.ft.). 1/f- add patio to rear yard, add 1 bedroom & 1 bathroom, 2/f- renovate (e) dining, living, kitchen, 1/2 bath & remove 1 bath. enlarge (e) rear deck on 2/f. 3/f- renovate (e) beds/1 bath, add 2 bathrooms. window replacement | $170,000 |