Block 0334, lot 022
565 Ellis St
- City’s use
- Multi-Family Residential
- Built
- 1922
- Stories
- 4
- Units
- 15
- Rooms
- 15 bathrooms
- Building
- 7,052 sq ft
- Lot
- 2,345 sq ft
- Zoning
- RC4
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 24, 2026 | In progress filed Aug 2026, not yet issued | 565 Ellis St | repair existing concrete balcony surface and to provide structural steel support for existing balcony and existing fire escape assembly. paint exposed steel support elements to match (e) facade color. height of steel guard to match existing height of guardrail.Details
repair existing concrete balcony surface and to provide structural steel support for existing balcony and existing fire escape assembly. paint exposed steel support elements to match (e) facade color. height of steel guard to match existing height of guardrail. | $41,000 | |
| Dec 26, 2025 | In progress issued Dec 2025 | 567 Ellis St | Ningzhi Hu Signs Company | install 10 channel gold letters mounted on panel box that is non illuminated facing street. (80" x 12"): "noors snack"Details
install 10 channel gold letters mounted on panel box that is non illuminated facing street. (80" x 12"): "noors snack" | $1,300 |
| Nov 26, 2025 | Completed final sign-off Dec 2025 | 567 Ellis St | Skyblue Builders Inc | to obtain final inspection for work approved under pa# 202409039912. all work is complete.Details
to obtain final inspection for work approved under pa# 202409039912. all work is complete. | |
| Sep 3, 2024 | Expired or cancelled expired Dec 2025 | 567 Ellis St | I S M Construction Company | comply w/planning enforcement case no 2024003689 enf and 202423675 change of use from ground level commercial unit from courier (bn) to general retail and service use (m) . restore storefront transparency. (n) scissor accordion security gate change unit # from 565b ti 567. accessiblity & fire ratingDetails
comply w/planning enforcement case no 2024003689 enf and 202423675 change of use from ground level commercial unit from courier (bn) to general retail and service use (m) . restore storefront transparency. (n) scissor accordion security gate change unit # from 565b ti 567. accessiblity & fire rating | $48,000 |
| Oct 18, 2023 | Completed final sign-off Jan 2024 | 565 Ellis St | I S M Construction Company | unit#2 - bathroom and kitchen remodel in kind. no changes in wall layout, floor layout, and opening layout. no structural work.Details
unit#2 - bathroom and kitchen remodel in kind. no changes in wall layout, floor layout, and opening layout. no structural work. | $24,000 |
| Sep 6, 2023 | Completed final sign-off Sep 2023 | 565 Ellis St | I S M Construction Company | unit b: comply w/ nov 202311501: partition wall,replacement of bath remodel in kind.Details
unit b: comply w/ nov 202311501: partition wall,replacement of bath remodel in kind. | $1,000 |
| Feb 21, 2020 | Completed final sign-off Jul 2020 | 565 Ellis St | 3 Mac Construction | remodel unit #14. bathroom and kitchen in kind. new cabinets, sinks, counter top. bath tub and vanity. no structural work. no alteration of walls. bathroom 5x8, kitchen 10x10.Details
remodel unit #14. bathroom and kitchen in kind. new cabinets, sinks, counter top. bath tub and vanity. no structural work. no alteration of walls. bathroom 5x8, kitchen 10x10. | $30,000 |
| Jul 28, 2014 | Completed final sign-off Dec 2014 | 565 Ellis St | S F Garage Company Inc. | comply with nov 201481841. all plaster removed, shall be replace with 5/8" type x sheetrock. maintain egress at all time during constructionDetails
comply with nov 201481841. all plaster removed, shall be replace with 5/8" type x sheetrock. maintain egress at all time during construction | $10,000 |
| Dec 12, 2013 | Completed final sign-off Oct 2014 | 565 Ellis St | S F Garage Company Inc. | unit #4: remodel (1) kitchen & (1) bathrooms in-kind. no structural work. comply with ced 150(k). kitchen: min 50% of kitchen lighting, h.e. by watt fixture. bath: m.e. or t-24 occupancy sensor.Details
unit #4: remodel (1) kitchen & (1) bathrooms in-kind. no structural work. comply with ced 150(k). kitchen: min 50% of kitchen lighting, h.e. by watt fixture. bath: m.e. or t-24 occupancy sensor. | $15,000 |
| Mar 19, 2013 | Completed final sign-off Dec 2016 | 565 Ellis St | S F Garage Company Inc. | remodel unit #8 in kind, kitchen & bathroom remodel, all new florecent lighting.Details
remodel unit #8 in kind, kitchen & bathroom remodel, all new florecent lighting. | $26,000 |
| Jan 16, 2013 | Never finaled issued Jan 2013, no final | 565 Ellis St | Fire & Security & Alarm Co/ F.S.A.C. | voluntary panel replacement in none sprinklered bldg. replace extg 10 smoke detectors and 6 pull stations with new at the same location. tie in all devices to new panel to be monitor to central station.Details
voluntary panel replacement in none sprinklered bldg. replace extg 10 smoke detectors and 6 pull stations with new at the same location. tie in all devices to new panel to be monitor to central station. | $5,200 |
| Jan 14, 2013 | Completed final sign-off Dec 2016 | 565 Ellis St | S F Garage Company Inc. | remodel unit #15 in kind, kitchen & bathroom only, all new fluorescent lightsDetails
remodel unit #15 in kind, kitchen & bathroom only, all new fluorescent lights | $25,000 |
| Dec 14, 2012 | Completed final sign-off Dec 2016 | 565 Ellis St | S F Garage Company Inc. | #16- remodel kitchen & bathroom in kind with new cabinets, vanity, toilets & fixture. no structural work, comply with cec150(k). all work in #16 only, kitchen: min. 50% of kitchen lights he by watt fixture. bath: he. or t-24 occupancy sensor.Details
#16- remodel kitchen & bathroom in kind with new cabinets, vanity, toilets & fixture. no structural work, comply with cec150(k). all work in #16 only, kitchen: min. 50% of kitchen lights he by watt fixture. bath: he. or t-24 occupancy sensor. | $15,000 |
| Dec 14, 2012 | Completed final sign-off Dec 2016 | 565 Ellis St | S F Garage Company Inc. | #9- remodel kitchen & bathroom in kind with new cabinets, vanity, toilets & fixture. no structural work, comply with cec150(k). all work in #9 only, kitchen: min. 50% of kitchen lights he by watt fixture. bath: he. or t-24 occupancy sensor.Details
#9- remodel kitchen & bathroom in kind with new cabinets, vanity, toilets & fixture. no structural work, comply with cec150(k). all work in #9 only, kitchen: min. 50% of kitchen lights he by watt fixture. bath: he. or t-24 occupancy sensor. | $15,000 |
| Jul 7, 2011 | Expired or cancelled withdrawn Nov 2024 | 565 Ellis St | change occupancy for ground floor unit b from unoccupied to spa.Details
change occupancy for ground floor unit b from unoccupied to spa. | $1,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- S F Garage Company Inc. (6), I S M Construction Company (3), 3 Mac Construction, Fire & Security & Alarm Co/ F.S.A.C., Ningzhi Hu Signs Company, Skyblue Builders Inc
- Engineers
- Alex Santos, William Wl Liang
- Authorized agent-otherss
- Michael Sol Elmore
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.