Block 0347, lot 005
246 Mcallister St
- City’s use
- Commercial Hotel
- Built
- 1926
- Stories
- 6
- Units
- 62
- Rooms
- 64 bathrooms
- Building
- 21,600 sq ft
- Lot
- 3,824 sq ft
- Zoning
- RC4
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
18 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 5, 2026 | In progress issued May 2026 | 246 Mcallister St | 4-Mac Construction | replace or repair in kind the following: recoat or replace bitumen waterproff on roof parapet repaint parapet and reconstrut missing cornice sections on north facade. remove loose peeling paint and repaint, seal cracks with motor on south side as needed. lube and repaint fire escape ladders as needDetails
replace or repair in kind the following: recoat or replace bitumen waterproff on roof parapet repaint parapet and reconstrut missing cornice sections on north facade. remove loose peeling paint and repaint, seal cracks with motor on south side as needed. lube and repaint fire escape ladders as need | $10,000 |
| Oct 16, 2024 | Completed final sign-off Feb 2026 | 246 Mcallister St | Innovative Technologies | upgrade of fire alarm in system to comply w/sffc 1103.7.6.1 installation of low frequency sounder in sleeping areasDetails
upgrade of fire alarm in system to comply w/sffc 1103.7.6.1 installation of low frequency sounder in sleeping areas | $10,000 |
| Jun 13, 2022 | Expired or cancelled cancelled Jan 2026 | 246 Mcallister St | (n) pricate pedestrian and vehicular metal access gate at breen placeDetails
(n) pricate pedestrian and vehicular metal access gate at breen place | $18,000 | |
| Sep 1, 2020 | Completed final sign-off Nov 2021 | 246 Mcallister St | International Fire Equipment Co Incorpor | remove all heads from remaining old piping and plugged them. change 10 painted head. add 3 head and relocate 1. change 2 heads in laundry to 200f. remove old laundry drain & install new in restroom/storage.Details
remove all heads from remaining old piping and plugged them. change 10 painted head. add 3 head and relocate 1. change 2 heads in laundry to 200f. remove old laundry drain & install new in restroom/storage. | $5,000 |
| Oct 8, 2019 | Completed final sign-off Oct 2021 | 246 Mcallister St | 3 Mac Construction | replace flooring, paint and electrical for 62 rooms with bathroom. paint, new light fixture lobby area.Details
replace flooring, paint and electrical for 62 rooms with bathroom. paint, new light fixture lobby area. | $80,500 |
| Jun 27, 2018 | Completed final sign-off Jun 2018 | 246 Mcallister St | Occidental Express | final inspection for work completed under pa#201205311546, complying with ordinance #170.02 (sro fire sprinkler ordinance)Details
final inspection for work completed under pa#201205311546, complying with ordinance #170.02 (sro fire sprinkler ordinance) | |
| Jun 27, 2018 | Completed final sign-off Jun 2018 | 246 Mcallister St | Occidental Express | final inspection for work completed under pa#200401234747, complying with ordinance #170.02 (sro fire sprinkler ordinance)Details
final inspection for work completed under pa#200401234747, complying with ordinance #170.02 (sro fire sprinkler ordinance) | |
| Sep 28, 2015 | Never finaled issued Sep 2015, no final | 246 Mcallister St | Mike P H Construction Co | reroofingDetails
reroofing | $5,000 |
| Jun 12, 2013 | Completed final sign-off Dec 2013 | 246 Mcallister St | Occidental Express | remodel community kitchen, dining room and reception area.Details
remodel community kitchen, dining room and reception area. | $18,500 |
| Sep 21, 2012 | Never finaled issued Sep 2012, no final | 246 Mcallister St | Fire & Security & Alarm Co/ F.S.A.C. | due to the adding of the sprinkler system on each floor, replace non-monitoring panel w/new fire sk-5808 control panel at the same location. replace existing devices like for like at the same location. tie-in existing bells to new panel. nfpa 72 control system monitoring.Details
due to the adding of the sprinkler system on each floor, replace non-monitoring panel w/new fire sk-5808 control panel at the same location. replace existing devices like for like at the same location. tie-in existing bells to new panel. nfpa 72 control system monitoring. | $10,000 |
| Jun 1, 2012 | Completed final sign-off May 2016 | 246 Mcallister St | Occidental Express | complying with nov # 201227041, 201128761, 2007015383, 201227282. misc. repairs.Details
complying with nov # 201227041, 201128761, 2007015383, 201227282. misc. repairs. | $8,500 |
| May 31, 2012 | Never finaled issued Aug 2012, no final | 246 Mcallister St | West Pacific Fire Protection Svcs. Inc. | install new fire sprinkler system in (e) hotel 293 s.head. comply with sro ord #170.02. allcomplants to br complies with under separate permtis.Details
install new fire sprinkler system in (e) hotel 293 s.head. comply with sro ord #170.02. allcomplants to br complies with under separate permtis. | $82,000 |
| May 11, 2011 | Completed final sign-off Jun 2011 | 246 Mcallister St | to correct nov #200795383. remove glued - on billboard on right side of bldg. (east). approx 8 feet tall x 14 feet wide.Details
to correct nov #200795383. remove glued - on billboard on right side of bldg. (east). approx 8 feet tall x 14 feet wide. | ||
| Jul 8, 2004 | Completed final sign-off Jul 2004 | 246 Mcallister St | replace broken skylight, and comply w/nov 200448803- patch sheetrock in rom 5/8" type x 308, 309 & 3Details
replace broken skylight, and comply w/nov 200448803- patch sheetrock in rom 5/8" type x 308, 309 & 3 | $1,500 | |
| Jun 15, 2004 | Completed final sign-off Jun 2004 | 246 Mcallister St | #101- remove toilet in bathroom to place refriatorDetails
#101- remove toilet in bathroom to place refriator | $500 | |
| Jan 23, 2004 | Expired or cancelled expired Mar 2007 | 246 Mcallister St | Triad Fire Protection System | installation of sprinkler system as per s.r.o hotel sprinkler installation per n.o.v. 200337358Details
installation of sprinkler system as per s.r.o hotel sprinkler installation per n.o.v. 200337358 | $52,000 |
| May 7, 2003 | Never finaled issued May 2003, no final | 246 Mcallister St | renewal of appln #200106252282 for final inspection complete by rafael torres til (g/f)Details
renewal of appln #200106252282 for final inspection complete by rafael torres til (g/f) | ||
| Jun 25, 2001 | Expired or cancelled expired May 2003 | 246 Mcallister St | construction to address disabled access violations stair construction, emergency lighting, signage.Details
construction to address disabled access violations stair construction, emergency lighting, signage. | $9,000 |