- Jul 2004 to Sep 2024
17 permits since 2000 (engineer on 13 permits, architect on 2 permits, authorized agent-others on 1 permit, designer on 1 permit): 10 completed, 4 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 19, 2024 | Completed final sign-off May 2025 | 193 Corbett Av | Vidal Alfredo Construction | removal of a 4ft portion of (e) exterior rear wall for a larger sliding door opening at the 2nd fl of a three story unit, installation of a new header and plywood sheathing/vertical straps on the inside of the remaining wall panels.Details
removal of a 4ft portion of (e) exterior rear wall for a larger sliding door opening at the 2nd fl of a three story unit, installation of a new header and plywood sheathing/vertical straps on the inside of the remaining wall panels. | $15,000 |
| Dec 1, 2022 | Expired or cancelled cancelled Jan 2026 | 488 Ellis St | 4-Mac Construction | revision to mechanical system for approved permit #202112204709. additional information provided for water redirection framing plan @ ceiling.Details
revision to mechanical system for approved permit #202112204709. additional information provided for water redirection framing plan @ ceiling. | $20,000 |
| Mar 14, 2019 | Never finaled filed Mar 2019, never issued | 494 36th Av | alteration & addition per adu ordinance no 162-16 of lower level unit. scope includes converting crawlspace to (n) bedroom. addition of one (n) 3-fixture bath, (n) kitchenette, (n) storage, (n) stairs, (n) living area, (n) closet, fixtures & cabinets.Details
alteration & addition per adu ordinance no 162-16 of lower level unit. scope includes converting crawlspace to (n) bedroom. addition of one (n) 3-fixture bath, (n) kitchenette, (n) storage, (n) stairs, (n) living area, (n) closet, fixtures & cabinets. | $100,000 | |
| Aug 2, 2018 | Expired or cancelled withdrawn Jun 2025 | 1476 California St | lowering portion of (e) storage area on grnd flr slab on grade from 7'-0" ceiling ht to 8'-6" ceiling ht.ref 201709148092Details
lowering portion of (e) storage area on grnd flr slab on grade from 7'-0" ceiling ht to 8'-6" ceiling ht.ref 201709148092 | $35,000 | |
| Sep 5, 2017 | Completed final sign-off Oct 2020 | 550 05th Av | Sft Construction Corp | seismic retrofit to comply w/ mandatory soft-story retrofit program. the design is per iebc-appendix a-4Details
seismic retrofit to comply w/ mandatory soft-story retrofit program. the design is per iebc-appendix a-4 | $55,000 |
| Sep 5, 2017 | Completed final sign-off Apr 2020 | 275 Parker Av | Lordan Construction | seismic retrofit to comply w/ mandatory soft-story retrofit program. the design is per iebc - appendix a-4Details
seismic retrofit to comply w/ mandatory soft-story retrofit program. the design is per iebc - appendix a-4 | $30,000 |
| Dec 29, 2015 | Completed final sign-off Feb 2017 | 735 11th Av | T L Construction Co | seimic retrofit of existing 2 story 5 unit apt bldg to comply with 2012 iebc appendix a4 and asce 7-10. work includes addition of plywood shearwalls, holdowns and new foundation at garage/street levelDetails
seimic retrofit of existing 2 story 5 unit apt bldg to comply with 2012 iebc appendix a4 and asce 7-10. work includes addition of plywood shearwalls, holdowns and new foundation at garage/street level | $42,000 |
| Jan 31, 2014 | Completed final sign-off Sep 2014 | 186 Shakespeare St | T L Construction Co | remodel kitchen/dining area and bathroom: replace floor with tile, repl kitchen cabinets & countertop, add dishwasher, skylight. teardown wall separating dining area from living room. repl tub, pedestal sink, toilet and vinyl floor with new tub, vanity/sink toilet and tile floor.Details
remodel kitchen/dining area and bathroom: replace floor with tile, repl kitchen cabinets & countertop, add dishwasher, skylight. teardown wall separating dining area from living room. repl tub, pedestal sink, toilet and vinyl floor with new tub, vanity/sink toilet and tile floor. | $34,500 |
| Jan 7, 2014 | Completed final sign-off Jan 2014 | 746 Great Hy | infill existing opening between kitchen and dining room and restore to its original shear capacityDetails
infill existing opening between kitchen and dining room and restore to its original shear capacity | $2,000 | |
| May 24, 2012 | Never finaled issued May 2012, no final | 3579 19th St | Mike Cahalan | voluntary strengthening on ground floor.Details
voluntary strengthening on ground floor. | $8,000 |
| Sep 1, 2011 | Completed final sign-off Nov 2012 | 3887 17th St | Mike Cahalan | to comply w/ nov# 201152003 dated 8/2/11. upper rear deck has rot damaged struc framing. demo upper rear deck, lower rear deck & 2-story enclosed porch. not to rebuild lower rear deck, build (n)2-sty enclosed porch w/ 3rd story deck & ext.stairs 2ndfl to grade.enclosed porch is unconditioned spaceDetails
to comply w/ nov# 201152003 dated 8/2/11. upper rear deck has rot damaged struc framing. demo upper rear deck, lower rear deck & 2-story enclosed porch. not to rebuild lower rear deck, build (n)2-sty enclosed porch w/ 3rd story deck & ext.stairs 2ndfl to grade.enclosed porch is unconditioned space | $35,000 |
| Aug 9, 2010 | Completed final sign-off Sep 2010 | 2731 40th Av | Occidental Express | revision to pa# 2009.08.24.5398. remove construction of new deck less than 3' above grade from permitted work.Details
revision to pa# 2009.08.24.5398. remove construction of new deck less than 3' above grade from permitted work. | |
| Oct 17, 2007 | Never finaled issued Oct 2007, no final | 1924 Laguna St | roof truss reenforcementDetails
roof truss reenforcement | $1,200 | |
| Oct 25, 2005 | Completed final sign-off Jun 2006 | 70 Terra Vista Av | replacement framing for extg dilapidated concrete stair located within unit #54/rise and run stays the same over all dimension stay the sameDetails
replacement framing for extg dilapidated concrete stair located within unit #54/rise and run stays the same over all dimension stay the same | $50,000 | |
| Oct 24, 2005 | Never finaled issued Oct 2005, no final | 20 Genebern Wy | Cas Construction | revise se to works in progress- 200509082329 (9/8/05) &200510034529 (10/3/05) include interior partition walls (n) windows & doors, shearwalls, (n) bathroom, laundry, guest room, project room, great room.Details
revise se to works in progress- 200509082329 (9/8/05) &200510034529 (10/3/05) include interior partition walls (n) windows & doors, shearwalls, (n) bathroom, laundry, guest room, project room, great room. | $50,000 |
| Oct 20, 2005 | Expired or cancelled expired Oct 2008 | 146 18th Av | replacement of interior plywood shear wall steel moment frame /2 story fame/revision to app #200409073431Details
replacement of interior plywood shear wall steel moment frame /2 story fame/revision to app #200409073431 | $10,000 | |
| Jul 2, 2004 | Completed final sign-off Dec 2004 | 870 Fell St | vertical & horizontal addition-remove existing wood landing & stairs & replace w/new steel frame & sDetails
vertical & horizontal addition-remove existing wood landing & stairs & replace w/new steel frame & s | $25,000 |