Permit GraphShortlistSan Francisco building permits since 2000

Block 1654, lot 006

735 11th Ave

City’s use
Multi-Family Residential
Built
1923
Stories
2
Units
5
Rooms
5 bathrooms
Building
4,350 sq ft
Lot
3,000 sq ft
Zoning
RH2
Construction type
D

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

11 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
May 9, 2016Completed
final sign-off Sep 2016
735 11th AvSears Home Improvemt Prod,install vinyl siding over back left wall 600 sq ft. no structural changes not visible from street
Details
Permit
201605096865
Status
complete
Filed
May 9, 2016
Permit issued
May 9, 2016
Final sign-off
Sep 19, 2016
Declared cost
$8,974
Address
735 11th Av

install vinyl siding over back left wall 600 sq ft. no structural changes not visible from street

Open the permit page

$8,974
May 4, 2016Never finaled
issued May 2016, no final
735 11th Avstreet space permit
Details
Permit
M687447
Status
issued
Filed
May 4, 2016
Permit issued
May 4, 2016
Address
735 11th Av

street space permit

Open the permit page

Dec 29, 2015Completed
final sign-off Feb 2017
735 11th AvT L Construction Coseimic retrofit of existing 2 story 5 unit apt bldg to comply with 2012 iebc appendix a4 and asce 7-10. work includes addition of plywood shearwalls, holdowns and new foundation at garage/street level
Details
Permit
201512296068
Status
complete
Filed
Dec 29, 2015
Permit issued
Jan 29, 2016
Final sign-off
Feb 22, 2017
Declared cost
$42,000
Address
735 11th Av

seimic retrofit of existing 2 story 5 unit apt bldg to comply with 2012 iebc appendix a4 and asce 7-10. work includes addition of plywood shearwalls, holdowns and new foundation at garage/street level

Open the permit page

$42,000
May 13, 2010Never finaled
issued May 2010, no final
735 11th Avstreet space permit
Details
Permit
M202069
Status
issued
Filed
May 13, 2010
Permit issued
May 13, 2010
Address
735 11th Av

street space permit

Open the permit page

Jan 15, 2009Completed
final sign-off Feb 2009
735 11th Avinterior remodel of a (e) apt. unit 5: revision for appl.#2008/0429/0916. provide grill for heater flue terminal. 1-hour entry door @ entry lobby. provide artificial light 10' candle min. and mechanical ventilation for dinning room.
Details
Permit
200901150286
Status
complete
Filed
Jan 15, 2009
Permit issued
Jan 21, 2009
Final sign-off
Feb 10, 2009
Declared cost
$2,000
Address
735 11th Av

interior remodel of a (e) apt. unit 5: revision for appl.#2008/0429/0916. provide grill for heater flue terminal. 1-hour entry door @ entry lobby. provide artificial light 10' candle min. and mechanical ventilation for dinning room.

Open the permit page

$2,000
Jan 8, 2009Completed
final sign-off Feb 2009
735 11th AvHiteco Construction Inc*** Check I. D***work @ apt# 2 only. remodel kitchen & bathroom. all fixture keep the same location. new electrical wire for the unit.
Details
Permit
200901089770
Status
complete
Filed
Jan 8, 2009
Permit issued
Jan 8, 2009
Final sign-off
Feb 20, 2009
Declared cost
$20,000
Address
735 11th Av

work @ apt# 2 only. remodel kitchen & bathroom. all fixture keep the same location. new electrical wire for the unit.

Open the permit page

$20,000
Jan 6, 2009Completed
final sign-off Feb 2009
735 11th AvPeninsula Fire Protection Incfire sprinkler for the remodeled area ground floor unit. there is (e) sprinkler system. total 8 heads.
Details
Permit
200901069659
Status
complete
Filed
Jan 6, 2009
Permit issued
Jan 27, 2009
Final sign-off
Feb 10, 2009
Declared cost
$2,500
Address
735 11th Av

fire sprinkler for the remodeled area ground floor unit. there is (e) sprinkler system. total 8 heads.

Open the permit page

$2,500
Oct 9, 2008Completed
final sign-off Feb 2009
735 11th AvHiteco Construction Inc*** Check I. D***at unit #5, revision to pa #200804290916, revised furance to wall heater on g/f.
Details
Permit
200810093839
Status
complete
Filed
Oct 9, 2008
Permit issued
Oct 10, 2008
Final sign-off
Feb 13, 2009
Address
735 11th Av

at unit #5, revision to pa #200804290916, revised furance to wall heater on g/f.

Open the permit page

Apr 29, 2008Completed
final sign-off Feb 2009
735 11th AvHiteco Construction Inc*** Check I. D***interior remodel of (e) apt. unit #5-relocate (e) kitchen, remodel (e) bathroom, (e) studio area convert to bedroom, (e) storage area convert to living room and dining room and repairs for correction nov# 200731477
Details
Permit
200804290916
Status
complete
Filed
Apr 29, 2008
Permit issued
May 1, 2008
Final sign-off
Feb 13, 2009
Declared cost
$60,000
Address
735 11th Av

interior remodel of (e) apt. unit #5-relocate (e) kitchen, remodel (e) bathroom, (e) studio area convert to bedroom, (e) storage area convert to living room and dining room and repairs for correction nov# 200731477

Open the permit page

$60,000
Dec 19, 2007Completed
final sign-off Jan 2008
735 11th Avrepair one hour separation at wall between the garage and living room (add 5/8" type "x" gyp. bd @ garage side.
Details
Permit
200712190822
Status
complete
Filed
Dec 19, 2007
Permit issued
Dec 19, 2007
Final sign-off
Jan 23, 2008
Declared cost
$500
Address
735 11th Av

repair one hour separation at wall between the garage and living room (add 5/8" type "x" gyp. bd @ garage side.

Open the permit page

$500
Mar 29, 2002Completed
final sign-off May 2002
735 11th Avcomply w/n.ov.200227145
Details
Permit
200203292673
Status
complete
Filed
Mar 29, 2002
Permit issued
Mar 29, 2002
Final sign-off
May 16, 2002
Declared cost
$495
Address
735 11th Av

comply w/n.ov.200227145

Open the permit page

$495

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Hiteco Construction Inc*** Check I. D*** (3), Peninsula Fire Protection Inc, Sears Home Improvemt Prod,, T L Construction Co
Engineers
Mike Yim

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.