Lordan Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2011 to Oct 2024
- Last 24 months
- 1 permit filed
108 permits since 2000: 96 completed, 8 never finaled, 4 expired or cancelled.
Of the 8 never-finaled permits, 8 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 108.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 15, 2024 | Completed final sign-off Mar 2025 | 1251 Judah St | replace courtyard stucco wall in kind, replace plywood for stucco as needed. installation 120 sq ft. stucco exterior at east elevation courtyard wall, repair 6 ft. high. all work in kind.Details
replace courtyard stucco wall in kind, replace plywood for stucco as needed. installation 120 sq ft. stucco exterior at east elevation courtyard wall, repair 6 ft. high. all work in kind. | $6,000 |
| Oct 4, 2024 | Expired or cancelled withdrawn Oct 2024 | 1243 Judah St | install courtyard stucco wall. repair, frame, plywood for stucco installation 120 sqft stucco exterior rot, easy elevation courtyard wall repair 6 feet high. to comply with nov#: 202313297Details
install courtyard stucco wall. repair, frame, plywood for stucco installation 120 sqft stucco exterior rot, easy elevation courtyard wall repair 6 feet high. to comply with nov#: 202313297 | $6,000 |
| Jan 23, 2024 | Completed final sign-off Feb 2024 | 15 Lincoln Wy | revised plywood shear walls and relocate moment frame. revision to pa# 201709148290Details
revised plywood shear walls and relocate moment frame. revision to pa# 201709148290 | |
| May 19, 2023 | Completed final sign-off Dec 2023 | 2335 Ocean Av | to comply with abe program ord 51-16. abe 202001221140.Details
to comply with abe program ord 51-16. abe 202001221140. | $10,000 |
| May 19, 2023 | Completed final sign-off Dec 2023 | 2337 Ocean Av | to comply with abe program ord 51-16. abe 202203013233. alteration to building entryDetails
to comply with abe program ord 51-16. abe 202203013233. alteration to building entry | $20,000 |
| May 19, 2023 | Completed final sign-off Dec 2023 | 2339 Ocean Av | to comply with abe program ord 51-16. abe 201912310501. alteration to building entryDetails
to comply with abe program ord 51-16. abe 201912310501. alteration to building entry | $3,000 |
| Apr 28, 2023 | Completed final sign-off Jul 2023 | 1245 Hayes St | compliance w/ mandatory seismic retrofit program per 2022 sfbc appendix a4Details
compliance w/ mandatory seismic retrofit program per 2022 sfbc appendix a4 | $40,000 |
| Jun 10, 2022 | Completed final sign-off Feb 2024 | 440 Kirkham St | underpin approx 21 linear ft of (e) footing along west side of building to accommode foundation installation at 1482-1498 09th ave under pa# 202002194861 r2.Details
underpin approx 21 linear ft of (e) footing along west side of building to accommode foundation installation at 1482-1498 09th ave under pa# 202002194861 r2. | $15,000 |
| Oct 27, 2021 | Completed final sign-off Jan 2022 | 611 Burnett Av | to comply with nov202180491: repair & replace garage post & damaged beam.Details
to comply with nov202180491: repair & replace garage post & damaged beam. | $5,000 |
| Jul 8, 2021 | Completed final sign-off Jun 2022 | 1557 Noe St | rev pa201907176166: door at lobby laundry change; rev to structural.Details
rev pa201907176166: door at lobby laundry change; rev to structural. | |
| Jun 7, 2021 | Expired or cancelled cancelled Jul 2021 | 325 Wayland St | remodel 1 kitchen and 2 bathrooms in-kind @ 2nd level.no structural workDetails
remodel 1 kitchen and 2 bathrooms in-kind @ 2nd level.no structural work | $70,000 |
| May 20, 2021 | Completed final sign-off Dec 2021 | 168 Palm Av | seismic strengthening to comply with sf soft story ordinance design per iebc appendix a-4.Details
seismic strengthening to comply with sf soft story ordinance design per iebc appendix a-4. | $120,000 |
| Apr 2, 2021 | Completed final sign-off Jul 2024 | 4416 20th St | 1. ground floor a.construct 795 sf. accessory dwelling unit at ground floor adu to consist of 1 - bedroom, 1 - bathroom, 1 - kitchen and a living room. remodel 2 and 3rd floors.Details
1. ground floor a.construct 795 sf. accessory dwelling unit at ground floor adu to consist of 1 - bedroom, 1 - bathroom, 1 - kitchen and a living room. remodel 2 and 3rd floors. | $30,000 |
| Mar 1, 2021 | Never finaled issued Jul 2021, no final | 1150 Monterey Bl | moving one wall in garage.Details
moving one wall in garage. | $50,000 |
| Feb 23, 2021 | Never finaled issued Feb 2021, no final | 1340 12th Av | to comply with nov 202172338. remove dryrot siding of tradesman corridor. fix and replace siding. approx. 400 sqft.Details
to comply with nov 202172338. remove dryrot siding of tradesman corridor. fix and replace siding. approx. 400 sqft. | $4,000 |
| Nov 24, 2020 | Never finaled issued Nov 2020, no final | 1674 Washington St | replace 12 windows - front of building - millguard 100 wood clad - wood horizontal sidingDetails
replace 12 windows - front of building - millguard 100 wood clad - wood horizontal siding | $20,000 |
| Sep 27, 2020 | Never finaled issued Jan 2021, no final | 3421 20th St | rev to pa202002073886 & pa201612306363: comply to complaint 201901291-revise foundation & excavate soile at rear of building (approx 126 cy).Details
rev to pa202002073886 & pa201612306363: comply to complaint 201901291-revise foundation & excavate soile at rear of building (approx 126 cy). | $80,000 |
| Aug 5, 2020 | Never finaled issued Aug 2020, no final | 1160 Fell St | dry rot repair in the back rear yard, 20x30. 600sq ft. repair in kind.Details
dry rot repair in the back rear yard, 20x30. 600sq ft. repair in kind. | $16,000 |
| Feb 7, 2020 | Expired or cancelled expired Jun 2022 | 3421 20th St | revise pa# 201612306363; revise fondation and sequenceDetails
revise pa# 201612306363; revise fondation and sequence | $40,000 |
| Jan 21, 2020 | Expired or cancelled expired Sep 2024 | 4170 17th St | repair of rear stairs, less than 50% . repair in kind. to comply with nov# 201903382 # 4Details
repair of rear stairs, less than 50% . repair in kind. to comply with nov# 201903382 # 4 | $2,000 |
| Oct 24, 2019 | Completed final sign-off Jan 2020 | 1674 Washington St | rev to pa# 201708094318; soft story retrofit per sfebc chaper 4d engineering criteria 2016 cebc appendix a-4Details
rev to pa# 201708094318; soft story retrofit per sfebc chaper 4d engineering criteria 2016 cebc appendix a-4 | |
| Jul 22, 2019 | Never finaled issued Jul 2019, no final | 1266 17th Av | revision to 201709077231 soft story seismic upgrade per sfebc 34b, 2016 iebc appx a4 change 2 moment frames on grnd flrDetails
revision to 201709077231 soft story seismic upgrade per sfebc 34b, 2016 iebc appx a4 change 2 moment frames on grnd flr | $6,000 |
| Jul 17, 2019 | Completed final sign-off Jun 2022 | 1557 Noe St | per legalization ordinance# 43-14, unit legalize for 1 bedroom & 1 bathroom on ground floor. provide lateral force resistance per 2016 sfbc 407 change of occupancy from r-3 to r-2.Details
per legalization ordinance# 43-14, unit legalize for 1 bedroom & 1 bathroom on ground floor. provide lateral force resistance per 2016 sfbc 407 change of occupancy from r-3 to r-2. | $20,000 |
| May 6, 2019 | Completed final sign-off Jul 2019 | 1242 Taylor St | revision to 201709306371. reduce foundation replacenment at rear of bld because (e) foundation condition appears better than expectedDetails
revision to 201709306371. reduce foundation replacenment at rear of bld because (e) foundation condition appears better than expected | |
| Apr 10, 2019 | Completed final sign-off May 2019 | 1340 12th Av | to comply with nov# 201940031 # 2, new rear back doorDetails
to comply with nov# 201940031 # 2, new rear back door | $1,000 |
| Mar 21, 2019 | Never finaled issued Mar 2019, no final | 830 Shotwell St | underpin (e) foundation approximately 25'-6" along south property lineDetails
underpin (e) foundation approximately 25'-6" along south property line | $14,000 |
| Oct 17, 2018 | Completed final sign-off Jan 2020 | 55 Woodward St | soft story upgrade per sfebc chapter 4d. engineering criteria 2016 cebc appendix a-4. install (n) shearwalls & (n) concrete walls to comply w/ sfebc chapter 4d.Details
soft story upgrade per sfebc chapter 4d. engineering criteria 2016 cebc appendix a-4. install (n) shearwalls & (n) concrete walls to comply w/ sfebc chapter 4d. | $40,000 |
| Sep 14, 2018 | Completed final sign-off Mar 2023 | 395 25th Av | residential soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial pa #201809140361.Details
residential soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial pa #201809140361. | $60,000 |
| Sep 14, 2018 | Completed final sign-off Mar 2023 | 395 25th Av | commercial soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential pa #201809140360.Details
commercial soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential pa #201809140360. | $30,000 |
| Aug 31, 2018 | Completed final sign-off Sep 2019 | 5125 Geary Bl | seismic retrofit of soft-story residential. comply w/ sfebc ad mandatory seismic retrofit per 2016 cbc appendix a4.(e) hvac system to remain ref pa 201808318943 for residential seismic retrofitDetails
seismic retrofit of soft-story residential. comply w/ sfebc ad mandatory seismic retrofit per 2016 cbc appendix a4.(e) hvac system to remain ref pa 201808318943 for residential seismic retrofit | $75,000 |
| Aug 31, 2018 | Completed final sign-off Sep 2019 | 5125 Geary Bl | seismic retrofit of soft story to comply with sfebc 40 mandatory seismic retrofi per 218 cebc appendix a4 (e) hvac system to remail, ref 201808318940 ( for commerical only )Details
seismic retrofit of soft story to comply with sfebc 40 mandatory seismic retrofi per 218 cebc appendix a4 (e) hvac system to remail, ref 201808318940 ( for commerical only ) | $25,000 |
| Aug 16, 2018 | Completed final sign-off Oct 2018 | 3217 Vicente St | revision to mandatory soft story retrofit permit 2017-0915-8767 (soft story) per iebc appendix a-4 per chapter 4dDetails
revision to mandatory soft story retrofit permit 2017-0915-8767 (soft story) per iebc appendix a-4 per chapter 4d | |
| Aug 8, 2018 | Completed final sign-off Dec 2018 | 3525 Anza St | rev to pa#201708255946; using existing grade beams w/new concrete cap at two hardy frame panelsDetails
rev to pa#201708255946; using existing grade beams w/new concrete cap at two hardy frame panels | |
| Jun 4, 2018 | Completed final sign-off Mar 2019 | 1459 Jones St | revision to mandatory soft story retrofit pa 2018-0112-8499 hardy moment frame changed to custom designed special moment frame. n/a for maher.Details
revision to mandatory soft story retrofit pa 2018-0112-8499 hardy moment frame changed to custom designed special moment frame. n/a for maher. | |
| May 29, 2018 | Completed final sign-off Feb 2020 | 2425 Fillmore St | commercial only: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4.Details
commercial only: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. | $25,000 |
| May 29, 2018 | Completed final sign-off Feb 2020 | 2425 Fillmore St | residential only: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
residential only: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $75,000 |
| May 21, 2018 | Completed final sign-off Feb 2019 | 1450 La Playa | revision to 201509247932 relocate moment frame to front facadeDetails
revision to 201509247932 relocate moment frame to front facade | |
| Mar 29, 2018 | Never finaled issued Mar 2021, no final | 3421 20th St | two (n) adu units per ord# 162-17, each w/ 1 bedrm, 1 bath on 1st flr.Details
two (n) adu units per ord# 162-17, each w/ 1 bedrm, 1 bath on 1st flr. | $80,000 |
| Mar 22, 2018 | Completed final sign-off Mar 2019 | 1453 Hyde St | foundation replacement, voluntary structural upgrade of basement floorDetails
foundation replacement, voluntary structural upgrade of basement floor | $100,000 |
| Feb 2, 2018 | Completed final sign-off May 2018 | 988 Broadway | revision to mandatory soft story retrofit ref pa 2017-0915-8764 (soft story) n/a for maher.Details
revision to mandatory soft story retrofit ref pa 2017-0915-8764 (soft story) n/a for maher. | |
| Jan 16, 2018 | Completed final sign-off Dec 2018 | 2335 Washington St | compliance with mandatory seismic retrofit program per 2016 cebc appendix a-4Details
compliance with mandatory seismic retrofit program per 2016 cebc appendix a-4 | $82,000 |
| Jan 12, 2018 | Completed final sign-off Mar 2019 | 1459 Jones St | residential - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial soft story under pa 201801128501Details
residential - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial soft story under pa 201801128501 | $57,500 |
| Jan 12, 2018 | Completed final sign-off Mar 2019 | 1201 Jackson St | commercial ada portion -mandatory soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential soft story under pa 2018-0112-8499Details
commercial ada portion -mandatory soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential soft story under pa 2018-0112-8499 | $29,500 |
| Oct 4, 2017 | Completed final sign-off Dec 2018 | 15 Guerrero St | soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4. | $53,000 |
| Oct 4, 2017 | Completed final sign-off Dec 2018 | 21 Guerrero St | soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4. | $53,000 |
| Sep 28, 2017 | Completed final sign-off Nov 2017 | 1275 California St | rev to original soft story drawing pa#201612225709.Details
rev to original soft story drawing pa#201612225709. | |
| Sep 18, 2017 | Completed final sign-off Jun 2020 | 232 21st Av | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $75,000 |
| Sep 15, 2017 | Completed final sign-off May 2018 | 988 Broadway | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. n/a for maherDetails
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. n/a for maher | $50,000 |
| Sep 15, 2017 | Completed final sign-off Oct 2018 | 3217 Vicente St | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. n/a for maherDetails
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. n/a for maher | $50,000 |
| Sep 15, 2017 | Completed final sign-off Nov 2019 | 4170 17th St | soft story retrofit per sf ordinance compliance per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4, plywood shearwalls added or strenghtened at ground floor concrete fdns added or strenghtened as required designDetails
soft story retrofit per sf ordinance compliance per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4, plywood shearwalls added or strenghtened at ground floor concrete fdns added or strenghtened as required design | $80,000 |
| Sep 15, 2017 | Completed final sign-off Dec 2018 | 1800 Larkin St | mandatory soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. n/a for maherDetails
mandatory soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. n/a for maher | $50,000 |
| Sep 14, 2017 | Completed final sign-off Feb 2024 | 15 Lincoln Wy | soft story retrofit per sfebc chapter 4d engineering 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering 2016 cebc appendix a-4 | $100,000 |
| Sep 13, 2017 | Completed final sign-off Oct 2018 | 1367 07th Av | mandatory soft story retrofit per sf ebc ch4d-2016 cebc appx a-4.Details
mandatory soft story retrofit per sf ebc ch4d-2016 cebc appx a-4. | $50,000 |
| Sep 8, 2017 | Completed final sign-off Sep 2018 | 26 Crestline Dr | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $30,000 |
| Sep 5, 2017 | Completed final sign-off Apr 2020 | 275 Parker Av | seismic retrofit to comply w/ mandatory soft-story retrofit program. the design is per iebc - appendix a-4Details
seismic retrofit to comply w/ mandatory soft-story retrofit program. the design is per iebc - appendix a-4 | $30,000 |
| Aug 30, 2017 | Completed final sign-off Jul 2019 | 1242 Taylor St | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4 | $80,000 |
| Aug 25, 2017 | Completed final sign-off Dec 2018 | 3525 Anza St | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $66,000 |
| Aug 24, 2017 | Completed final sign-off Apr 2018 | 4131 California St | compliance w/ mandatory seismic retrofit program per sfebc chapter 4d & 2016 cebc appx a-4Details
compliance w/ mandatory seismic retrofit program per sfebc chapter 4d & 2016 cebc appx a-4 | $65,000 |
| Aug 21, 2017 | Completed final sign-off Dec 2019 | 5636 California St | seismic upgrade to comply with ordinancne 66-13. soft story retrofit per sfebc chapter 4d, 2012 cebc appendix a-4.Details
seismic upgrade to comply with ordinancne 66-13. soft story retrofit per sfebc chapter 4d, 2012 cebc appendix a-4. | $28,000 |
| Aug 9, 2017 | Completed final sign-off Jan 2020 | 1674 Washington St | soft story retrofit per sfebc chapter 4d engineering 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering 2016 cebc appendix a-4 | $80,000 |
| Aug 1, 2017 | Completed final sign-off Feb 2018 | 875 Broadway | soft story retrofit per sfebc chapter 4d per engineering creteria 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d per engineering creteria 2016 cebc appendix a-4. | $50,000 |
| Jul 21, 2017 | Completed final sign-off Sep 2018 | 3234 Washington St | soft story retrofit per sfebc chapter 4d, engineering creteria 2016 cebc appendix a-4. south side of garage level is partially below garde & building has split levels due to scope of site. ** maher: n/a **Details
soft story retrofit per sfebc chapter 4d, engineering creteria 2016 cebc appendix a-4. south side of garage level is partially below garde & building has split levels due to scope of site. ** maher: n/a ** | $100,000 |
| Jun 30, 2017 | Completed final sign-off May 2018 | 4248 20th St | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 n/a for maherDetails
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 n/a for maher | $10,000 |
| Feb 14, 2017 | Completed final sign-off May 2018 | 434 Lombard St | soft story retrofit of gr fl including prefabricated special moment frames and plywood shear walls. a portion of the building is constructed on brick foundations which will be replaced. soft story retrofit per sfbc ch.34b 2012 iebc app a-4.Details
soft story retrofit of gr fl including prefabricated special moment frames and plywood shear walls. a portion of the building is constructed on brick foundations which will be replaced. soft story retrofit per sfbc ch.34b 2012 iebc app a-4. | $100,000 |
| Feb 3, 2017 | Completed final sign-off May 2017 | 455 Warren Dr | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 | $80,000 |
| Dec 29, 2016 | Completed final sign-off Sep 2020 | 840 Shotwell St | seismic work for mandatory soft story retrofit. ref to pa 2016-1229-6189 for adu. $70,000 of total construction cost is for the adu and should not be passed on to the tenants.Details
seismic work for mandatory soft story retrofit. ref to pa 2016-1229-6189 for adu. $70,000 of total construction cost is for the adu and should not be passed on to the tenants. | $50,000 |
| Dec 22, 2016 | Completed final sign-off Nov 2017 | 1275 California St | mandatory soft story retrofit per sf ord per sfbc chapter 34b 2012 iebc maher naDetails
mandatory soft story retrofit per sf ord per sfbc chapter 34b 2012 iebc maher na | $40,000 |
| Dec 1, 2016 | Completed final sign-off Dec 2018 | 3015 Clement St | compliance w/ mandatory soft story retrofit program, 2012 iebc appendix a-4Details
compliance w/ mandatory soft story retrofit program, 2012 iebc appendix a-4 | $60,000 |
| Oct 5, 2016 | Completed final sign-off Mar 2017 | 77 07th Av | mandatory soft story retrofit per sf ordinance per sfbc chapter 34b 2012 iebc appendix a-4.Details
mandatory soft story retrofit per sf ordinance per sfbc chapter 34b 2012 iebc appendix a-4. | $30,000 |
| Sep 14, 2016 | Completed final sign-off Jun 2018 | 2629 Folsom St | soft story per other rational design. install 3 (n) moment frames on parking, level of buildingDetails
soft story per other rational design. install 3 (n) moment frames on parking, level of building | $75,000 |
| Sep 13, 2016 | Completed final sign-off Jul 2017 | 2325 Washington St | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. soft story retrofit of ground floor, plywood shear wall, metal hardware, steel moment frames, foundation improvements.Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. soft story retrofit of ground floor, plywood shear wall, metal hardware, steel moment frames, foundation improvements. | $100,000 |
| Jul 29, 2016 | Completed final sign-off Feb 2017 | 2267 Filbert St | proposed soft story mitigation, strengthen walls at garage/storage level including hardy frame panel, plywood sheati9ng, anchor bolts, hold downs and shear clips. 2012 iebc appendix a-4.Details
proposed soft story mitigation, strengthen walls at garage/storage level including hardy frame panel, plywood sheati9ng, anchor bolts, hold downs and shear clips. 2012 iebc appendix a-4. | $37,000 |
| Jul 25, 2016 | Completed final sign-off Sep 2016 | 2459 Polk St | soft story retrofit to comply with sfbc ch 34bDetails
soft story retrofit to comply with sfbc ch 34b | $106,000 |
| Jul 25, 2016 | Completed final sign-off Sep 2016 | 2459 Polk St | ada work in the drycleaners. new accessible door,stripingDetails
ada work in the drycleaners. new accessible door,striping | $3,000 |
| Jun 16, 2016 | Completed final sign-off Dec 2016 | 1580 Lombard St | compliance w/ mandatory seismic retrofit program 2012 iebc appx a-4 & 2013 sfbc sec 34bDetails
compliance w/ mandatory seismic retrofit program 2012 iebc appx a-4 & 2013 sfbc sec 34b | $30,000 |
| Jun 2, 2016 | Completed final sign-off Sep 2016 | 620 Guerrero St | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 | $40,000 |
| Jun 1, 2016 | Completed final sign-off Jun 2017 | 1521 Chestnut St | compliance with mandatory soft story retrofit program, 2012 iebc appendix a-4Details
compliance with mandatory soft story retrofit program, 2012 iebc appendix a-4 | $80,000 |
| Apr 28, 2016 | Completed final sign-off Aug 2016 | 595 03rd Av | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4, per sfbc chapter 34b; commercial space to remain vacant per ab-017.Details
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4, per sfbc chapter 34b; commercial space to remain vacant per ab-017. | $40,000 |
| Apr 26, 2016 | Completed final sign-off Apr 2016 | 439 Arguello Bl | revision to pa #201406300078 for cfc to state scope - "soft story retrofit per sfbc chapter 34b engineering criteria is per other rational design asce 7-10 standard."Details
revision to pa #201406300078 for cfc to state scope - "soft story retrofit per sfbc chapter 34b engineering criteria is per other rational design asce 7-10 standard." | |
| Mar 21, 2016 | Completed final sign-off Jul 2016 | 1525 Chestnut St | provide door from foyer to garage. maher naDetails
provide door from foyer to garage. maher na | $900 |
| Mar 3, 2016 | Completed final sign-off Jul 2016 | 1525 Chestnut St | soft story retrofit and new door from foyer to garage. per 2012 iebc appendix a-4. n/a for maherDetails
soft story retrofit and new door from foyer to garage. per 2012 iebc appendix a-4. n/a for maher | $50,000 |
| Mar 3, 2016 | Completed final sign-off Mar 2017 | 380 26th Av | soft story retrofit per sfbc chapter 34b: other rational design.Details
soft story retrofit per sfbc chapter 34b: other rational design. | $120,000 |
| Jan 15, 2016 | Completed final sign-off Apr 2016 | 3894 17th St | soft story retrofit per sfbc chapter 34b engineering criteria: 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria: 2012 iebc appendix a-4 | $40,000 |
| Jan 14, 2016 | Completed final sign-off Oct 2017 | 3365 Cesar Chavez St | mandator seismic retrofit for wood frame building per 2013 sfbc chapter 34 b. method used 2012 int existing building code chap 4aDetails
mandator seismic retrofit for wood frame building per 2013 sfbc chapter 34 b. method used 2012 int existing building code chap 4a | $85,000 |
| Oct 9, 2015 | Completed final sign-off Feb 2016 | 1351 Noe St | soft storey retrofit: mandatory per sf ordinace chapter 34b 2012 iebc. maher naDetails
soft storey retrofit: mandatory per sf ordinace chapter 34b 2012 iebc. maher na | $50,000 |
| Sep 24, 2015 | Completed final sign-off Feb 2019 | 1450 La Playa | mandatory soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4.Details
mandatory soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. | $80,000 |
| Jul 15, 2015 | Completed final sign-off Feb 2016 | 444 Lombard St | mandatory soft story retrofit per sfbc 34b. engineering criteria used 2012 iebc appendix a-4.Details
mandatory soft story retrofit per sfbc 34b. engineering criteria used 2012 iebc appendix a-4. | $100,000 |
| Jun 18, 2015 | Completed final sign-off May 2016 | 700 Lombard St | madatory soft story retrofit per s.f. ordinance per sfbc chapter 34b per 2012 iebc appendix a-4Details
madatory soft story retrofit per s.f. ordinance per sfbc chapter 34b per 2012 iebc appendix a-4 | $60,000 |
| Jun 17, 2015 | Completed final sign-off Dec 2015 | 966 Pine St | mandatory soft story retrofit per san francisco ordinance per sfbc chapter 34b per 2012 iebc.Details
mandatory soft story retrofit per san francisco ordinance per sfbc chapter 34b per 2012 iebc. | $30,000 |
| Apr 22, 2015 | Completed final sign-off Oct 2015 | 1010 Fell St | mandatory soft story retrofit per sfbc chapter 34b per 2012 iebc appendix a-4 of iebc. n/a maher ordinanceDetails
mandatory soft story retrofit per sfbc chapter 34b per 2012 iebc appendix a-4 of iebc. n/a maher ordinance | $30,000 |
| Jan 21, 2015 | Completed final sign-off Oct 2015 | 557 26th Av | soft story retrofit epr sfbc chapter 34b. 2012 iebc appendix a-4. n/a maher ordinanceDetails
soft story retrofit epr sfbc chapter 34b. 2012 iebc appendix a-4. n/a maher ordinance | $27,000 |
| Nov 14, 2014 | Completed final sign-off Nov 2014 | 3006 Gough St | revision appl. 2014.0611.8153. remove one moment frame and enlarge one moment frame per plan shown. maher n/a.Details
revision appl. 2014.0611.8153. remove one moment frame and enlarge one moment frame per plan shown. maher n/a. | |
| Oct 20, 2014 | Completed final sign-off Apr 2015 | 3330 Broderick St | seismic retrofit on 1st floor only per sfbc chapter 34b, 2012 iebc appendix a-4; maher n/aDetails
seismic retrofit on 1st floor only per sfbc chapter 34b, 2012 iebc appendix a-4; maher n/a | $25,000 |
| Sep 17, 2014 | Completed final sign-off Oct 2022 | 2275 Sutter St | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4 | $45,000 |
| Sep 11, 2014 | Completed final sign-off Nov 2014 | 3033 Franklin St | revision to drawing #201406118154 to move one shear wall on garage level in hallwayDetails
revision to drawing #201406118154 to move one shear wall on garage level in hallway | |
| Sep 3, 2014 | Completed final sign-off Jan 2018 | 1015 Masonic Av | soft story retrofit with new shear walls per sfbc chapter 4d. 2016 cebc appendix a-4.Details
soft story retrofit with new shear walls per sfbc chapter 4d. 2016 cebc appendix a-4. | $40,000 |
| Aug 13, 2014 | Completed final sign-off Oct 2014 | 1324 Broadway | soft story retrofit to comply with sfbc chapter 34b using fema p807.Details
soft story retrofit to comply with sfbc chapter 34b using fema p807. | $70,000 |
| Aug 1, 2014 | Completed final sign-off Jun 2015 | 1070 Church St | soft sotry retrofit. install (n) shearwalls. soft story, chapter 34b, iebc a4.Details
soft sotry retrofit. install (n) shearwalls. soft story, chapter 34b, iebc a4. | $20,000 |
| Jul 29, 2014 | Completed final sign-off Oct 2014 | 3151 Franklin St | comply with sfbc chap 34 b. structural calculations based fema p-807. soft story retrofitDetails
comply with sfbc chap 34 b. structural calculations based fema p-807. soft story retrofit | $60,000 |
| Jul 10, 2014 | Completed final sign-off Sep 2022 | 669 Grand View Av | soft story retrofit to comply with chp 34p calculations based on iebc chp 34b apendix a-4Details
soft story retrofit to comply with chp 34p calculations based on iebc chp 34b apendix a-4 | $80,000 |