Back to kitchen remodel contractors
Lordan Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2011 to Oct 2024
- Last 24 months
- 1 permit filed
108 permits since 2000: 96 completed, 8 never finaled, 4 expired or cancelled.
Of the 8 never-finaled permits, 8 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 1 completed, 1 expired or cancelled. Typically 210 days from filing to permit and 811 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 7, 2021 | Expired or cancelled cancelled Jul 2021 | 325 Wayland St | remodel 1 kitchen and 2 bathrooms in-kind @ 2nd level.no structural workDetails
remodel 1 kitchen and 2 bathrooms in-kind @ 2nd level.no structural work | $70,000 |
| Apr 2, 2021 | Completed final sign-off Jul 2024 | 4416 20th St | 1. ground floor a.construct 795 sf. accessory dwelling unit at ground floor adu to consist of 1 - bedroom, 1 - bathroom, 1 - kitchen and a living room. remodel 2 and 3rd floors.Details
1. ground floor a.construct 795 sf. accessory dwelling unit at ground floor adu to consist of 1 - bedroom, 1 - bathroom, 1 - kitchen and a living room. remodel 2 and 3rd floors. | $30,000 |