Back to bathroom remodel contractors
Lordan Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2011 to Oct 2024
- Last 24 months
- 1 permit filed
108 permits since 2000: 96 completed, 8 never finaled, 4 expired or cancelled.
Of the 8 never-finaled permits, 8 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 2 completed, 1 never finaled, 1 expired or cancelled. Typically 520 days from filing to permit and 615 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 7, 2021 | Expired or cancelled cancelled Jul 2021 | 325 Wayland St | remodel 1 kitchen and 2 bathrooms in-kind @ 2nd level.no structural workDetails
remodel 1 kitchen and 2 bathrooms in-kind @ 2nd level.no structural work | $70,000 |
| Apr 2, 2021 | Completed final sign-off Jul 2024 | 4416 20th St | 1. ground floor a.construct 795 sf. accessory dwelling unit at ground floor adu to consist of 1 - bedroom, 1 - bathroom, 1 - kitchen and a living room. remodel 2 and 3rd floors.Details
1. ground floor a.construct 795 sf. accessory dwelling unit at ground floor adu to consist of 1 - bedroom, 1 - bathroom, 1 - kitchen and a living room. remodel 2 and 3rd floors. | $30,000 |
| Jul 17, 2019 | Completed final sign-off Jun 2022 | 1557 Noe St | per legalization ordinance# 43-14, unit legalize for 1 bedroom & 1 bathroom on ground floor. provide lateral force resistance per 2016 sfbc 407 change of occupancy from r-3 to r-2.Details
per legalization ordinance# 43-14, unit legalize for 1 bedroom & 1 bathroom on ground floor. provide lateral force resistance per 2016 sfbc 407 change of occupancy from r-3 to r-2. | $20,000 |
| Mar 29, 2018 | Never finaled issued Mar 2021, no final | 3421 20th St | two (n) adu units per ord# 162-17, each w/ 1 bedrm, 1 bath on 1st flr.Details
two (n) adu units per ord# 162-17, each w/ 1 bedrm, 1 bath on 1st flr. | $80,000 |