Back to bathroom remodel contractors
M-Projects
- Based in
- San Francisco
- On San Francisco permits
- Feb 2008 to Dec 2021
- Last 24 months
- 0 permits filed
35 permits since 2000: 31 completed, 4 never finaled.
Of the 4 never-finaled permits, 3 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 30 days from filing to permit and 273 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 22, 2021 | Completed final sign-off Feb 2022 | 7 Seymour St | revision to permit #201702229909 to document as built conditions including kitchen sink, peninsula, fridge, dishwasher. in basement. master bedroom closet door inside bathroom hallway in second floor.Details
revision to permit #201702229909 to document as built conditions including kitchen sink, peninsula, fridge, dishwasher. in basement. master bedroom closet door inside bathroom hallway in second floor. | |
| Feb 8, 2016 | Completed final sign-off Jul 2018 | 2193 Fillmore St | t.i. to extg 2nd floor office. appox 2900 sq ft. demo extg office walls, reframe with new post and beam, construct new office partitions, replace extg bathroom with new. replace extg lighting.Details
t.i. to extg 2nd floor office. appox 2900 sq ft. demo extg office walls, reframe with new post and beam, construct new office partitions, replace extg bathroom with new. replace extg lighting. | $95,000 |
| Aug 21, 2013 | Completed final sign-off Nov 2013 | 486 Ellis St | interior remodel of 486-488 ellis st for art gallery use m to a occup. work to include: (2) ada bathrooms, minor partition walls, new lighitng, bldg is fully sprinklered. full seismic upgrade done under ref pa# 200811076130. all ada to space under pa# 201306179736. sep hvac, sprinkler, life safetyDetails
interior remodel of 486-488 ellis st for art gallery use m to a occup. work to include: (2) ada bathrooms, minor partition walls, new lighitng, bldg is fully sprinklered. full seismic upgrade done under ref pa# 200811076130. all ada to space under pa# 201306179736. sep hvac, sprinkler, life safety | $120,000 |
| Mar 16, 2009 | Completed final sign-off Dec 2009 | 3051 Clay St | convert closet to full bathroom, add a door.Details
convert closet to full bathroom, add a door. | $10,000 |
| Feb 4, 2008 | Completed final sign-off Nov 2009 | 1155 Vallejo St | new third floor vertical addition for 2 bedrooms, 2 bathrooms to (e) 2-story building; 1st floor: new bedroom, bath, stair and laundry; 2nd floor: fill (e) deck for new bedroom and remove part of kitchen for a new deck; 2 bath & mew roof decks on 2nd and 3rd floors.Details
new third floor vertical addition for 2 bedrooms, 2 bathrooms to (e) 2-story building; 1st floor: new bedroom, bath, stair and laundry; 2nd floor: fill (e) deck for new bedroom and remove part of kitchen for a new deck; 2 bath & mew roof decks on 2nd and 3rd floors. | $185,000 |