Greenfield Construction Llc
- Based in
- Los Angeles
- On San Francisco permits
- Jan 2017 to Sep 2022
- Last 24 months
- 0 permits filed
12 permits since 2000: 12 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 29, 2022 | Completed final sign-off Dec 2022 | 49 Gold Mine Dr | revision to pa #202107305461. construct concrete walkway per structural plan. construct retaining wall. construct 6" concrete curb.Details
revision to pa #202107305461. construct concrete walkway per structural plan. construct retaining wall. construct 6" concrete curb. | |
| Jul 25, 2022 | Completed final sign-off Dec 2022 | 49 Gold Mine Dr | structural revision 202107305461 ti and accessibility upgrades. omit proposed conc font due to e con grade beam adequacy to support new structural post and holddown.Details
structural revision 202107305461 ti and accessibility upgrades. omit proposed conc font due to e con grade beam adequacy to support new structural post and holddown. | |
| Sep 20, 2021 | Completed final sign-off Aug 2022 | 5301 Diamond Heights Bl | window and patio door replacement for 54 dwelling units with windows same size and location. max. u-factor = 0.30. no rough opening changes. some front facing.Details
window and patio door replacement for 54 dwelling units with windows same size and location. max. u-factor = 0.30. no rough opening changes. some front facing. | $167,000 |
| Sep 20, 2021 | Completed final sign-off Aug 2022 | 49 Gold Mine Dr | window and patio door replacement for 34 dwelling units with windows same size and location. max. u-factor = 0.30. no rough opening changes. some front facing.Details
window and patio door replacement for 34 dwelling units with windows same size and location. max. u-factor = 0.30. no rough opening changes. some front facing. | $167,000 |
| Sep 20, 2021 | Completed final sign-off Dec 2022 | 1760 Diamond St | window and patio door replacement for 16 dwelling units with windows same size and location. max. u-factor = 0.30. no rough opening changes. some front facing.Details
window and patio door replacement for 16 dwelling units with windows same size and location. max. u-factor = 0.30. no rough opening changes. some front facing. | $167,000 |
| Jul 30, 2021 | Completed final sign-off Dec 2022 | 49 Gold Mine Dr | accessibility improvements to site walkways, ramps, steps. alterations to interior spaces, including relocateion of non bearing partitions. removal and replacement of exterior windows and doors. cosmetic renvation includes finishes, fixtures, cabients, appliances, paint throughout. (included mep)Details
accessibility improvements to site walkways, ramps, steps. alterations to interior spaces, including relocateion of non bearing partitions. removal and replacement of exterior windows and doors. cosmetic renvation includes finishes, fixtures, cabients, appliances, paint throughout. (included mep) | $400,000 |
| Sep 6, 2019 | Completed final sign-off Sep 2019 | 1 Gold Mine Dr | encapsulating the steel columns and beams, per soft story compliance ref 201701046531 with shiplap siding. also bpa #201701046523 and #201908290214Details
encapsulating the steel columns and beams, per soft story compliance ref 201701046531 with shiplap siding. also bpa #201701046523 and #201908290214 | $12,000 |
| Aug 29, 2019 | Completed final sign-off Sep 2019 | 1760 Diamond St | revision to 201701046530 to match (e) conditions that differ from permitted designDetails
revision to 201701046530 to match (e) conditions that differ from permitted design | |
| Oct 3, 2018 | Completed final sign-off Nov 2018 | 49 Gold Mine Dr | addition of 2 layer 5/8in type x sheetrock to the interior of garage exterior wall to create a one-hour construction for ecterior walls less than 10feet of proposed new property line.Details
addition of 2 layer 5/8in type x sheetrock to the interior of garage exterior wall to create a one-hour construction for ecterior walls less than 10feet of proposed new property line. | $2,000 |
| Jan 4, 2017 | Completed final sign-off Sep 2019 | 1 Gold Mine Dr | soft story retrofit per sfbc chapter 4d engineering criteria: 2016 iebc appenix a-4Details
soft story retrofit per sfbc chapter 4d engineering criteria: 2016 iebc appenix a-4 | $150,000 |
| Jan 4, 2017 | Completed final sign-off Sep 2019 | 5301 Diamond Heights Bl | soft story retrofit per sfbc chapter 34b engineering criteria: 2016 iebc appenix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria: 2016 iebc appenix a-4 | $150,000 |
| Jan 4, 2017 | Completed final sign-off Sep 2019 | 1760 Diamond St | soft story retrofit per sfbc chapter 4d engineering criteria: 2016 iebc appenix a-4Details
soft story retrofit per sfbc chapter 4d engineering criteria: 2016 iebc appenix a-4 | $150,000 |