Justin Mikecz
- Listed as
- architect, authorized agent-others
- Firm
- Justin Mikecz, Ncarb
- Based in
- San Francisco
- On San Francisco permits
- May 2000 to Jun 2026
11 permits since 2000 (authorized agent-others on 6 permits, architect on 5 permits): 5 completed, 2 in progress, 3 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 2, 2026 | In progress issued Oct 2026 | 125 Santa Paula Av | Damar Construction And Remodeling Inc | revision to 202211086074: add new detail a7.51 for a glass guardrail at 3rd/f west roof deck. per clients request. current detail 5/a7.51 will remain as detail for steel guardrail (no glass) at other decks/baloncies. @ roof deckDetails
revision to 202211086074: add new detail a7.51 for a glass guardrail at 3rd/f west roof deck. per clients request. current detail 5/a7.51 will remain as detail for steel guardrail (no glass) at other decks/baloncies. @ roof deck | |
| Feb 28, 2026 | In progress filed Feb 2026, not yet issued | 8 Woodland Av | adding a stair and a small deck in the rear yard. enclosing part of the 1st floor patio and 2nd floor deck. remodeling the part of the 1st floor and 2nd floor. adding 2 more stories above the existing structure.Details
adding a stair and a small deck in the rear yard. enclosing part of the 1st floor patio and 2nd floor deck. remodeling the part of the 1st floor and 2nd floor. adding 2 more stories above the existing structure. | $500,000 | |
| Aug 15, 2025 | Completed final sign-off Jan 2026 | 125 Santa Paula Av | Damar Construction And Remodeling Inc | revision 202211086074-s1 to add tie in (n) slab with (e) footing. revise 1st floor framing to show pier footing at gl per (e) condition and show detiail call outs to (n) detail . and (e) detail and change the post at b/2.7 to land on an (e) footing instead of a (n) pier footing per (n) detail.Details
revision 202211086074-s1 to add tie in (n) slab with (e) footing. revise 1st floor framing to show pier footing at gl per (e) condition and show detiail call outs to (n) detail . and (e) detail and change the post at b/2.7 to land on an (e) footing instead of a (n) pier footing per (n) detail. | |
| Sep 29, 2021 | Never finaled issued Dec 2022, no final | 1522 11th Av | Damar Construction And Remodeling Inc | horizon'l add'n extend to (e) basement, 1st, 2nd fl. 1st fl: extend lower level partially into rear yard. vertical add'n partial 3rd fl setback from front of house at least 15' & approx 12' from rear setback line. add 3rd & 4th bedrm, (2)bathrms & inlaw suite; update & expand (e) bathrms & kitchnDetails
horizon'l add'n extend to (e) basement, 1st, 2nd fl. 1st fl: extend lower level partially into rear yard. vertical add'n partial 3rd fl setback from front of house at least 15' & approx 12' from rear setback line. add 3rd & 4th bedrm, (2)bathrms & inlaw suite; update & expand (e) bathrms & kitchn | $325,000 |
| Aug 31, 2020 | Never finaled filed Aug 2020, never issued | 3260 26th St | to erect a type 1b, 7 story, 42 residential unit building with one commertial unit and one partial basement.Details
to erect a type 1b, 7 story, 42 residential unit building with one commertial unit and one partial basement. | $9,400,000 | |
| Apr 30, 2019 | Never finaled issued May 2023, no final | 2455 Harrison St | Wickman Development And Construction | new 5-story (& penthouse) over basement, type 3 over 1 construction, with two stairwells, mixed use building with two levels of residential (5 units) over 4 levels of non-life science laboratory use.Details
new 5-story (& penthouse) over basement, type 3 over 1 construction, with two stairwells, mixed use building with two levels of residential (5 units) over 4 levels of non-life science laboratory use. | $1,500,000 |
| Oct 21, 2014 | Expired or cancelled cancelled Mar 2020 | 1410 Ocean Av | convert (e) abandoned commercial storefront to dog day care & grooming facility (approved conditional use# 20131817c) interior renovation work. upgraded electrical service. accessiblity upgrades to 1st floor. structural upgrade. no addition or changes to building (e) storefront.Details
convert (e) abandoned commercial storefront to dog day care & grooming facility (approved conditional use# 20131817c) interior renovation work. upgraded electrical service. accessiblity upgrades to 1st floor. structural upgrade. no addition or changes to building (e) storefront. | $218,251 | |
| Feb 28, 2013 | Completed final sign-off Apr 2013 | 1649 Polk St | Build Group Inc. | remove (e) storefront windows & doors & replace.Details
remove (e) storefront windows & doors & replace. | $5,000 |
| Mar 20, 2008 | Completed final sign-off Apr 2008 | 871 Turk St | Cahill Contractors Inc | renew pa# 2006/10/05/4288, pa# 2007/05/31/2607, pa# 2007/08/22/0500 & pa# 2007/09/20/3225 for final inspection only.Details
renew pa# 2006/10/05/4288, pa# 2007/05/31/2607, pa# 2007/08/22/0500 & pa# 2007/09/20/3225 for final inspection only. | |
| Mar 20, 2008 | Completed final sign-off Apr 2008 | 871 Turk St | Cahill Contractors Inc | renew pa# 2005/06/16/5225, pa# 2006/06/15/4110 & pa# 2006/07/27/7862 for final inspection only.Details
renew pa# 2005/06/16/5225, pa# 2006/06/15/4110 & pa# 2006/07/27/7862 for final inspection only. | |
| May 26, 2000 | Completed final sign-off Aug 2001 | 255 Broad St | to erect a 1 unit 1 1/2 story buildingDetails
to erect a 1 unit 1 1/2 story building | $180,000 |