Justin Mikecz
- License
- C33547
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect, authorized agent-others
- Firm
- Justin Mikecz, Ncarb
- Based in
- San Francisco
- On San Francisco permits
- May 2000 to Nov 2026
12 permits since 2000 (authorized agent-others on 7 permits, architect on 5 permits): 6 completed, 2 in progress, 3 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Damar Construction And Remodeling Inc (3), Cahill Contractors Inc (2), Bailey General Contracting Co Inc., Build Group Inc., Wickman Development And Construction
- Architects
- Toby Morris (6)
- Engineers
- C. Scott Learned, Chuck Voong, Jeff Brink, Johnson Keh, Michael Hom
Where they worked
- Single-family 5
- Multi-family (2-family, apartments) 5
- Commercial 1
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 5, 2026 | In progress filed Nov 2026, not yet issued | 105 Liberty St | 1) remove existing guardrail/planters, arch overhang at garge door, roof drian, deck tile & under layments at terrace above existing garage; 2) replace w/n gaurdrail, pedestal paver roof assembly & roof drains; 3)remove & replace (e) water damaged folding, wood-framed, glass door w/n folding door,Details
1) remove existing guardrail/planters, arch overhang at garge door, roof drian, deck tile & under layments at terrace above existing garage; 2) replace w/n gaurdrail, pedestal paver roof assembly & roof drains; 3)remove & replace (e) water damaged folding, wood-framed, glass door w/n folding door, | $20,000 | |
| Jun 2, 2026 | Completed final sign-off Oct 2026 | 125 Santa Paula Av | Damar Construction And Remodeling Inc | revision to 202211086074: add new detail a7.51 for a glass guardrail at 3rd/f west roof deck. per clients request. current detail 5/a7.51 will remain as detail for steel guardrail (no glass) at other decks/baloncies. @ roof deckDetails
revision to 202211086074: add new detail a7.51 for a glass guardrail at 3rd/f west roof deck. per clients request. current detail 5/a7.51 will remain as detail for steel guardrail (no glass) at other decks/baloncies. @ roof deck | |
| Feb 28, 2026 | In progress issued Nov 2026 | 8 Woodland Av | Bailey General Contracting Co Inc. | adding a stair and a small deck in the rear yard. enclosing part of the 1st floor patio and 2nd floor deck. remodeling the part of the 1st floor and 2nd floor. adding 2 more stories above the existing structure.Details
adding a stair and a small deck in the rear yard. enclosing part of the 1st floor patio and 2nd floor deck. remodeling the part of the 1st floor and 2nd floor. adding 2 more stories above the existing structure. | $500,000 |
| Aug 15, 2025 | Completed final sign-off Jan 2026 | 125 Santa Paula Av | Damar Construction And Remodeling Inc | revision 202211086074-s1 to add tie in (n) slab with (e) footing. revise 1st floor framing to show pier footing at gl per (e) condition and show detiail call outs to (n) detail . and (e) detail and change the post at b/2.7 to land on an (e) footing instead of a (n) pier footing per (n) detail.Details
revision 202211086074-s1 to add tie in (n) slab with (e) footing. revise 1st floor framing to show pier footing at gl per (e) condition and show detiail call outs to (n) detail . and (e) detail and change the post at b/2.7 to land on an (e) footing instead of a (n) pier footing per (n) detail. | |
| Sep 29, 2021 | Never finaled issued Dec 2022, no final | 1522 11th Av | Damar Construction And Remodeling Inc | horizon'l add'n extend to (e) basement, 1st, 2nd fl. 1st fl: extend lower level partially into rear yard. vertical add'n partial 3rd fl setback from front of house at least 15' & approx 12' from rear setback line. add 3rd & 4th bedrm, (2)bathrms & inlaw suite; update & expand (e) bathrms & kitchnDetails
horizon'l add'n extend to (e) basement, 1st, 2nd fl. 1st fl: extend lower level partially into rear yard. vertical add'n partial 3rd fl setback from front of house at least 15' & approx 12' from rear setback line. add 3rd & 4th bedrm, (2)bathrms & inlaw suite; update & expand (e) bathrms & kitchn | $325,000 |
| Aug 31, 2020 | Never finaled filed Aug 2020, never issued | 3260 26th St | to erect a type 1b, 7 story, 42 residential unit building with one commertial unit and one partial basement.Details
to erect a type 1b, 7 story, 42 residential unit building with one commertial unit and one partial basement. | $9,400,000 | |
| Apr 30, 2019 | Never finaled issued May 2023, no final | 2455 Harrison St | Wickman Development And Construction | new 5-story (& penthouse) over basement, type 3 over 1 construction, with two stairwells, mixed use building with two levels of residential (5 units) over 4 levels of non-life science laboratory use.Details
new 5-story (& penthouse) over basement, type 3 over 1 construction, with two stairwells, mixed use building with two levels of residential (5 units) over 4 levels of non-life science laboratory use. | $1,500,000 |
| Oct 21, 2014 | Expired or cancelled cancelled Mar 2020 | 1410 Ocean Av | convert (e) abandoned commercial storefront to dog day care & grooming facility (approved conditional use# 20131817c) interior renovation work. upgraded electrical service. accessiblity upgrades to 1st floor. structural upgrade. no addition or changes to building (e) storefront.Details
convert (e) abandoned commercial storefront to dog day care & grooming facility (approved conditional use# 20131817c) interior renovation work. upgraded electrical service. accessiblity upgrades to 1st floor. structural upgrade. no addition or changes to building (e) storefront. | $218,251 | |
| Feb 28, 2013 | Completed final sign-off Apr 2013 | 1649 Polk St | Build Group Inc. | remove (e) storefront windows & doors & replace.Details
remove (e) storefront windows & doors & replace. | $5,000 |
| Mar 20, 2008 | Completed final sign-off Apr 2008 | 871 Turk St | Cahill Contractors Inc | renew pa# 2006/10/05/4288, pa# 2007/05/31/2607, pa# 2007/08/22/0500 & pa# 2007/09/20/3225 for final inspection only.Details
renew pa# 2006/10/05/4288, pa# 2007/05/31/2607, pa# 2007/08/22/0500 & pa# 2007/09/20/3225 for final inspection only. | |
| Mar 20, 2008 | Completed final sign-off Apr 2008 | 871 Turk St | Cahill Contractors Inc | renew pa# 2005/06/16/5225, pa# 2006/06/15/4110 & pa# 2006/07/27/7862 for final inspection only.Details
renew pa# 2005/06/16/5225, pa# 2006/06/15/4110 & pa# 2006/07/27/7862 for final inspection only. | |
| May 26, 2000 | Completed final sign-off Aug 2001 | 255 Broad St | to erect a 1 unit 1 1/2 story buildingDetails
to erect a 1 unit 1 1/2 story building | $180,000 |