Block 2630, lot 043
8 Woodland Ave
- City’s use
- Single Family Residential
- Built
- 1908
- Stories
- 2
- Units
- 1
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 1,611 sq ft
- Lot
- 1,084 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 13, 2026 | In progress issued Jul 2026 | 8 Woodland Av | Bailey General Contracting Co Inc | water damage repairs, repair shettrock in living room, dining room, bedroom. no construction to be done. all work interior.Details
water damage repairs, repair shettrock in living room, dining room, bedroom. no construction to be done. all work interior. | $15,000 |
| Feb 28, 2026 | In progress filed Feb 2026, not yet issued | 8 Woodland Av | adding a stair and a small deck in the rear yard. enclosing part of the 1st floor patio and 2nd floor deck. remodeling the part of the 1st floor and 2nd floor. adding 2 more stories above the existing structure.Details
adding a stair and a small deck in the rear yard. enclosing part of the 1st floor patio and 2nd floor deck. remodeling the part of the 1st floor and 2nd floor. adding 2 more stories above the existing structure. | $500,000 | |
| Aug 4, 2016 | Completed final sign-off Aug 2016 | 8 Woodland Av | Axis Construction | remove & replace damaged plywood, approx. 700sf replace in kind, not visible from the streetDetails
remove & replace damaged plywood, approx. 700sf replace in kind, not visible from the street | $5,000 |
| Jun 23, 2016 | Completed final sign-off Aug 2016 | 8 Woodland Av | Axis Construction | r/r bathroom tiels, install new water barrier. all tile like for like, no alterations.Details
r/r bathroom tiels, install new water barrier. all tile like for like, no alterations. | $25,000 |
| Jul 17, 2014 | Completed final sign-off Aug 2014 | 8 Woodland Av | 1) add wood deck on 2nd floor at rear.Details
1) add wood deck on 2nd floor at rear. | $10,000 | |
| May 15, 2014 | Never finaled issued May 2014, no final | 8 Woodland Av | street space permitDetails
street space permit | ||
| Dec 12, 2013 | Never finaled issued Dec 2013, no final | 8 Woodland Av | street spaceDetails
street space | ||
| Sep 19, 2013 | Completed final sign-off Aug 2014 | 8 Woodland Av | kitchen remodel and powder room on 2nd fl. add 2 study one great rm + 1 office and 2 baths on 1st fl. replace wood siding at front (south side) in kindDetails
kitchen remodel and powder room on 2nd fl. add 2 study one great rm + 1 office and 2 baths on 1st fl. replace wood siding at front (south side) in kind | $65,000 | |
| Aug 27, 2013 | Expired or cancelled cancelled Jan 2026 | 8 Woodland Av | kitchen remodel and add powder room on 2nd fl per plan. add 3 bedrooms, 2 baths on 1st fl per plan. replace wood siding at front in kind south side at front only. add stair to connect 1st fl and 2nd flDetails
kitchen remodel and add powder room on 2nd fl per plan. add 3 bedrooms, 2 baths on 1st fl per plan. replace wood siding at front in kind south side at front only. add stair to connect 1st fl and 2nd fl | $58,000 | |
| Jun 14, 2005 | Completed final sign-off Sep 2005 | 8 Woodland Av | Tom Lee Roofing Inc. | reroofingDetails
reroofing | $7,300 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Axis Construction (2), Bailey General Contracting Co Inc, Tom Lee Roofing Inc.
- Architects
- Edward Morris
- Authorized agent-otherss
- Justin Mikecz
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.