Lisa Tse
- Listed as
- engineer
- Firm
- Integrand Structural Engineer
- Based in
- Fremont
- On San Francisco permits
- Nov 2011 to Jul 2026
50 permits since 2000 (engineer on 50 permits): 27 completed, 7 in progress, 11 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 10, 2026 | In progress issued Jul 2026 | 1304 Valencia St | Pacific Edge Construction Inc | structural revision to pa#2022-0420-2645 s1: a replacement of the (e) site condition at the rear garage to include a structural foundationDetails
structural revision to pa#2022-0420-2645 s1: a replacement of the (e) site condition at the rear garage to include a structural foundation | $5,000 |
| Oct 31, 2025 | In progress filed Oct 2025, not yet issued | 2126 18th St | a 610 s.f. vertical, 94 s.f.front & 80 s.f. rear addition. 134 sq. ft. of (e) garage to convert to habitable space. 392 s.f. studio adu proposed on g/f per gov. sec. 65852.2. interior remodel to kitchen and (3) baths at main residence. extensive facade alterations proposed.Details
a 610 s.f. vertical, 94 s.f.front & 80 s.f. rear addition. 134 sq. ft. of (e) garage to convert to habitable space. 392 s.f. studio adu proposed on g/f per gov. sec. 65852.2. interior remodel to kitchen and (3) baths at main residence. extensive facade alterations proposed. | $1,200,000 | |
| Sep 16, 2025 | Completed final sign-off Feb 2026 | 30 Surrey St | Perez Construction Llc. | revision to pa 202405293134 to add new casement wood window on level 1 living room facing to street where the facade is set backDetails
revision to pa 202405293134 to add new casement wood window on level 1 living room facing to street where the facade is set back | $6,000 |
| Jan 16, 2025 | In progress issued Aug 2025 | 2339 37th Av | Hammerhouse Construction | 3rd story horiz 116sf addition to (e) to include a closet, not visible to the street. demo (e) 2nd story roof deck, infill (e) 46sf center atrium. interior remodel of (e) 2nd story and kitchen.Details
3rd story horiz 116sf addition to (e) to include a closet, not visible to the street. demo (e) 2nd story roof deck, infill (e) 46sf center atrium. interior remodel of (e) 2nd story and kitchen. | $154,000 |
| Dec 30, 2024 | In progress issued Feb 2026 | 45 Mccoppin St | to comply w/nov# 202309140, document existing and unpermitted conditions; provide a rated fire wall and window sprinkler protection/ replacement to provide compliant roof exiting; provide rated parapets and roof fire protection features; construct interior framed walls and ceilings to atmoshpericallDetails
to comply w/nov# 202309140, document existing and unpermitted conditions; provide a rated fire wall and window sprinkler protection/ replacement to provide compliant roof exiting; provide rated parapets and roof fire protection features; construct interior framed walls and ceilings to atmoshpericall | $24,000 | |
| Oct 21, 2024 | In progress issued Mar 2025 | 707 Douglass St | Pristine Builders Group | foundation replacement; new interior stair; remodel 2 bathrooms; new platform at grade; convert laundry to shop. no exterior alterationsDetails
foundation replacement; new interior stair; remodel 2 bathrooms; new platform at grade; convert laundry to shop. no exterior alterations | $387,000 |
| Jun 13, 2024 | Completed final sign-off Sep 2024 | 3490 18th St | Counterforce Inc. | to comply with nov: 202421803. repair built up wood framed colum damaged by car impact in-kind. no change to exterior is proposed.Details
to comply with nov: 202421803. repair built up wood framed colum damaged by car impact in-kind. no change to exterior is proposed. | $22,000 |
| Sep 28, 2023 | Completed final sign-off Feb 2024 | 346 San Benito Wy | Division Sf Inc Dba: Hawke Bldg Company | revision to pa 2019-1120-7717 remove & replace finishes in kind in living room due to cracks; replace wood fire palce w/gas insert in existing location; submit as builts per structural commentsDetails
revision to pa 2019-1120-7717 remove & replace finishes in kind in living room due to cracks; replace wood fire palce w/gas insert in existing location; submit as builts per structural comments | $2,500 |
| Jun 22, 2023 | Never finaled filed Jun 2023, never issued | 178 Ney St | rear two story addition/renovation of kitchen,powder room,bathroom,deck.addition of 35 sq ft of conditioned space.Details
rear two story addition/renovation of kitchen,powder room,bathroom,deck.addition of 35 sq ft of conditioned space. | $100,000 | |
| Mar 9, 2023 | Never finaled issued May 2023, no final | 205 Chenery St | infill addition under 10'-0. remodel (e) bedroom @ level 1 and bathroom. existing garage area to remainDetails
infill addition under 10'-0. remodel (e) bedroom @ level 1 and bathroom. existing garage area to remain | $150,000 | |
| Dec 30, 2022 | Never finaled filed Dec 2022, never issued | 278 Ripley St | Beam Construction Enterprises Inc | to erect an adu structure. 1-unit, 1 story, type vb.Details
to erect an adu structure. 1-unit, 1 story, type vb. | $500,000 |
| Dec 16, 2022 | Completed final sign-off May 2024 | 4300 17th St | remove interior load bearing wall.Details
remove interior load bearing wall. | $5,000 | |
| Oct 27, 2022 | Completed final sign-off Jan 2025 | 1853 Jones St | Wilkinson Preservation Fine Home Mainten | install new residential elevator at existing secondary stairwell. elevator to serve 3 floors only: garage, second, third floors. all work within existing building envelope.Details
install new residential elevator at existing secondary stairwell. elevator to serve 3 floors only: garage, second, third floors. all work within existing building envelope. | $75,000 |
| Sep 29, 2022 | Completed final sign-off Dec 2024 | 473 Elizabeth St | unit 5 - kitchen remodel; remodel existing bathroom; new full bathroom and new master bedroomDetails
unit 5 - kitchen remodel; remodel existing bathroom; new full bathroom and new master bedroom | $50,000 | |
| May 19, 2022 | Completed final sign-off Apr 2023 | 245 Chester Av | Super Home Builders Inc. | revision to pa# 202110291440. structural replacement of rotten members per plans. replace and repair siding in kind as required at rear facade.Details
revision to pa# 202110291440. structural replacement of rotten members per plans. replace and repair siding in kind as required at rear facade. | $1,000 |
| May 19, 2022 | Never finaled issued May 2022, no final | 51 Justin Dr | Pio Mcgarr Inc | revision to pa# 202203119845. structural revision to add foundation support and replace post per drawings and calcs.Details
revision to pa# 202203119845. structural revision to add foundation support and replace post per drawings and calcs. | $1,000 |
| Apr 20, 2022 | In progress issued Jan 2024 | 1304 Valencia St | Pacific Edge Construction Inc | remodel existing ground level and second level. add a rear addition. demolish existing attic level storage and attic. create a new residential unit atop the existing second level.Details
remodel existing ground level and second level. add a rear addition. demolish existing attic level storage and attic. create a new residential unit atop the existing second level. | $600,000 |
| Mar 10, 2022 | In progress issued Apr 2025 | 2171 39th Av | Canseco Construction Corp | two story addition @ rear yard (18'x20ft+720 sqft (n) primary bedroom & bath, gym, living space, (n) exterior deck (115 sqft). remodel (e) kitchen @ 2nd level, 2 (n) skylights.Details
two story addition @ rear yard (18'x20ft+720 sqft (n) primary bedroom & bath, gym, living space, (n) exterior deck (115 sqft). remodel (e) kitchen @ 2nd level, 2 (n) skylights. | $150,000 |
| Mar 1, 2022 | Completed final sign-off Sep 2022 | 1412 Golden Gate Av | Beyond The Horizon Construction | revision to 202111233036. relocation of structural work.Details
revision to 202111233036. relocation of structural work. | |
| Feb 17, 2022 | Completed final sign-off Nov 2025 | 1751 Fulton St | Sft Construction Corp, Covenant Construction & Design Inc, Jtm Developments | convert an (e) vacant commercial bldg to a gymnasium. the scope of work includes facade renovation, new interior partitions, new flooring, new bathrooms, and new skylights. there is no expansion in bldg envelope.Details
convert an (e) vacant commercial bldg to a gymnasium. the scope of work includes facade renovation, new interior partitions, new flooring, new bathrooms, and new skylights. there is no expansion in bldg envelope. | $250,000 |
| Oct 29, 2021 | Completed final sign-off Apr 2023 | 245 Chester Av | Super Home Builders Inc. | interior renovation. reconfigure stair, relocate partitions. remodel bathroom & kitchen. new finishes & fixtures.Details
interior renovation. reconfigure stair, relocate partitions. remodel bathroom & kitchen. new finishes & fixtures. | $150,000 |
| Sep 24, 2021 | Completed final sign-off Feb 2024 | 346 San Benito Wy | Division Sf Inc Dba: Hawke Bldg Company | revision to pa 201911207717. replace a portion of the (e) garage space in the basement with habitable space, skylight added to foyer, reconfiguration of bathroom and kitchen layouts, and replace guardrail at entry.Details
revision to pa 201911207717. replace a portion of the (e) garage space in the basement with habitable space, skylight added to foyer, reconfiguration of bathroom and kitchen layouts, and replace guardrail at entry. | |
| Jul 1, 2021 | Completed final sign-off Feb 2023 | 1670 Funston Av | Cw Cheng Construction Co | kitchen remodel with wall removal. bathroom addition. no change to exterior building envelope.Details
kitchen remodel with wall removal. bathroom addition. no change to exterior building envelope. | $20,000 |
| Mar 24, 2021 | Completed final sign-off Feb 2024 | 98 Sotelo Av | S P Builder | revision to app#201912190018: the approved deck design is now supported with a retaining wall and spread footings instead of piers. no change to size or location of deck. revision is purely structural.Details
revision to app#201912190018: the approved deck design is now supported with a retaining wall and spread footings instead of piers. no change to size or location of deck. revision is purely structural. | $6,000 |
| Mar 17, 2021 | Completed final sign-off Feb 2024 | 1375 24th Av | Sturdy Home Builders | revision to pa#201811307126. alter site. the new includes interior renovations and horizontal expansion into the rear yard in the existing ground floor.Details
revision to pa#201811307126. alter site. the new includes interior renovations and horizontal expansion into the rear yard in the existing ground floor. | $350,000 |
| Mar 16, 2021 | Never finaled issued Oct 2021, no final | 846 Capp St | Matthew P Leffers | convert basement for (2) (n) residential units. interior non-structural wall demolition & re-layout. (n) partitions, add bathrooms, paint, lower (e) floor & (n) floor finish. nfpa 13 sprinkler system in basement level.Details
convert basement for (2) (n) residential units. interior non-structural wall demolition & re-layout. (n) partitions, add bathrooms, paint, lower (e) floor & (n) floor finish. nfpa 13 sprinkler system in basement level. | $80,000 |
| Aug 31, 2020 | Completed final sign-off Mar 2025 | 862 42nd Av | Arris Build Group, Inc., Sgdm Llc | new 55 sf horizontal addition @ 1st floor rear building.rebuild 325 sqft @ 1st floor rear-interior remodel 875 sqft @ 1st floor rear, rebuild deck 200 sqft @ 2nd floor rear- add new deck @ 2nd floor rear.add adu on first floor. per ordincance 162-62Details
new 55 sf horizontal addition @ 1st floor rear building.rebuild 325 sqft @ 1st floor rear-interior remodel 875 sqft @ 1st floor rear, rebuild deck 200 sqft @ 2nd floor rear- add new deck @ 2nd floor rear.add adu on first floor. per ordincance 162-62 | $150,000 |
| Aug 25, 2020 | Never finaled issued Sep 2021, no final | 1664 Alabama St | Ronan O'dea Inc Dba O'dea Ronan Inc | rear yard addition and interior renovation of existing 3 story single family residence. project will expand the envelope, incorporating an additional 220 sf of conditioned space. the project will not increase the existing height of the building. building non-sprinklered per fs-03.Details
rear yard addition and interior renovation of existing 3 story single family residence. project will expand the envelope, incorporating an additional 220 sf of conditioned space. the project will not increase the existing height of the building. building non-sprinklered per fs-03. | $450,000 |
| Mar 11, 2020 | Expired or cancelled withdrawn Apr 2021 | 346 San Benito Wy | replace existing foundation from 1920's. no mechanical, no electrical, no plumbing.Details
replace existing foundation from 1920's. no mechanical, no electrical, no plumbing. | $25,000 | |
| Jan 28, 2020 | Never finaled issued Feb 2021, no final | 619 Marina Bl | Avonmore Construction Inc | revision to pa #201906214105, move post and beam locaiton.Details
revision to pa #201906214105, move post and beam locaiton. | $1,000 |
| Dec 19, 2019 | Completed final sign-off Feb 2024 | 98 Sotelo Av | S P Builder | remodel basement, remodel bathroom on 3rd fl. include bathroom, bedroom & wet bar, move laundry to 2nd fl. new deck at rear yard above grade, add 2 new patio doors and new windows, replace window sashes in kind w wood frame windowsDetails
remodel basement, remodel bathroom on 3rd fl. include bathroom, bedroom & wet bar, move laundry to 2nd fl. new deck at rear yard above grade, add 2 new patio doors and new windows, replace window sashes in kind w wood frame windows | $50,000 |
| Feb 6, 2018 | Completed final sign-off Aug 2020 | 1118 De Haro St | Podesta Construction Inc | replace (e) 2 story deck at rear with new 2 stroy deck in same locationDetails
replace (e) 2 story deck at rear with new 2 stroy deck in same location | $60,000 |
| Nov 15, 2017 | Completed final sign-off Apr 2019 | 787 Faxon Av | V And Company, Incorporated | interior remodel including relocation of interior stair. construct 1 new family room, wet bar, 1 bedroom, 1 bathroom & laundry on ground floor. new bathroom & remodel kitchen & bath on 2nd floor. all winthin existing bldg envelope.Details
interior remodel including relocation of interior stair. construct 1 new family room, wet bar, 1 bedroom, 1 bathroom & laundry on ground floor. new bathroom & remodel kitchen & bath on 2nd floor. all winthin existing bldg envelope. | $400,000 |
| Oct 13, 2017 | Completed final sign-off Sep 2018 | 1627 15th Av | Realty Builders Inc | g/f: convert (e) 416sf storage space to bedroom & bathroom with entertainment area.Details
g/f: convert (e) 416sf storage space to bedroom & bathroom with entertainment area. | $40,000 |
| Aug 16, 2017 | Expired or cancelled expired Nov 2021 | 101 Upper Tr | Picone Renovations | rev. to pa#201706068526, 1/f- new bathroom & replace washer/dryer. 2/f- ceiling to remain 8'4", revise framing @ ceiling & canopy, raise 2/f bathroom ceiling, repair dry rot at front wall.Details
rev. to pa#201706068526, 1/f- new bathroom & replace washer/dryer. 2/f- ceiling to remain 8'4", revise framing @ ceiling & canopy, raise 2/f bathroom ceiling, repair dry rot at front wall. | $10,000 |
| Aug 3, 2017 | Never finaled issued Jan 2018, no final | 1634 30th Av | Fugnai Construction | work on 2/f: reconfigure existing kitchen & bathroom, replace existing wall with beam.Details
work on 2/f: reconfigure existing kitchen & bathroom, replace existing wall with beam. | $35,000 |
| Aug 1, 2017 | Expired or cancelled withdrawn Feb 2018 | 1247 Harrison St | Gregory Loughran Construction | revision to pa #201701096737. partial demo of (e) mezzanine, rebuild part of mezzanine - no new sq ft. demo (e) stair - build (n) stair. remodel electrical fixtures and switches. new guardrail at mezzanine. ** maher: n/a **Details
revision to pa #201701096737. partial demo of (e) mezzanine, rebuild part of mezzanine - no new sq ft. demo (e) stair - build (n) stair. remodel electrical fixtures and switches. new guardrail at mezzanine. ** maher: n/a ** | |
| Jul 25, 2017 | Completed final sign-off Jul 2018 | 1530 11th Av | Mizen Construction Inc | 67 sf addition @ corner of 1st flr & sitting room on 2nd flr to nort east corner of house.Details
67 sf addition @ corner of 1st flr & sitting room on 2nd flr to nort east corner of house. | $5,000 |
| Jun 15, 2017 | Completed final sign-off Dec 2018 | 2312 Castro St | Superb Builders Inc **See Notes** | revision to pa #201512285973/s1 - revise structural work: change joist (size & space @ rear deck); add tie to strong frame @ master bath roof.Details
revision to pa #201512285973/s1 - revise structural work: change joist (size & space @ rear deck); add tie to strong frame @ master bath roof. | |
| Jun 14, 2017 | Never finaled issued Jun 2017, no final | 5 Downey St | Mcmahon Construction | remodel (e) kitchen, new hardwood floors throughout. new paint throughout, new double marvin doors at exterior of kitchen, change window at kitchen, new finishesDetails
remodel (e) kitchen, new hardwood floors throughout. new paint throughout, new double marvin doors at exterior of kitchen, change window at kitchen, new finishes | $80,000 |
| Jun 6, 2017 | Expired or cancelled expired Nov 2021 | 101 Upper Tr | Picone Renovations | enclose foyer, replace front door, renovate kitchen & 2 baths, infill lightwell, add lot line window, remove walls, move laundry. extend deck and add deck stair.Details
enclose foyer, replace front door, renovate kitchen & 2 baths, infill lightwell, add lot line window, remove walls, move laundry. extend deck and add deck stair. | $80,000 |
| Jun 5, 2017 | Completed final sign-off Apr 2018 | 850 Dolores St | Caruso Construction Inc. | infill lightwell, replace rear door, add powder room, legalize g/f living space, add skylights, add bedroom, renovate bathrooms.Details
infill lightwell, replace rear door, add powder room, legalize g/f living space, add skylights, add bedroom, renovate bathrooms. | $60,000 |
| Oct 27, 2016 | Expired or cancelled cancelled Jan 2026 | 1434 15th St | provide (n) stair to (e) mezzanine and (n) room in (e) warehouse. n/a maher ordinanceDetails
provide (n) stair to (e) mezzanine and (n) room in (e) warehouse. n/a maher ordinance | $25,000 | |
| Oct 6, 2016 | Completed final sign-off Aug 2018 | 109 Quintara St | Spectrum Development Co. | new 400 sq ft roof deck & exterior wood stair on the south elevation.Details
new 400 sq ft roof deck & exterior wood stair on the south elevation. | $25,000 |
| Jul 7, 2016 | Never finaled issued Jul 2016, no final | 1031 Jones St | Mcmahon Construction | interior renovation of master bathroom, cosmetic upgrades to (e) wood burning fireplaces, electrical upgrade throughout, new lighting in select areas and 8 sq ft addition to bathroom on north side of propertyDetails
interior renovation of master bathroom, cosmetic upgrades to (e) wood burning fireplaces, electrical upgrade throughout, new lighting in select areas and 8 sq ft addition to bathroom on north side of property | $90,000 |
| Jun 14, 2016 | Completed final sign-off Sep 2017 | 532 45th Av | Fulcrum Point Construction | 2nd floor : renovate kitchen, add half bath, add deck to back of house with new windows & doors conncected to living space. 3rd floor: new master bathroom.Details
2nd floor : renovate kitchen, add half bath, add deck to back of house with new windows & doors conncected to living space. 3rd floor: new master bathroom. | $130,000 |
| Feb 1, 2016 | Completed final sign-off Jan 2021 | 489 30th St | Doran Construction & Design | renovation & addition to (e) single family home by vertical & horizontal addition to create a two family home with two parking spaces. new exteiror materials, windows & doors for entire home, new landscaping of front yard seismic upgrad to bldg.Details
renovation & addition to (e) single family home by vertical & horizontal addition to create a two family home with two parking spaces. new exteiror materials, windows & doors for entire home, new landscaping of front yard seismic upgrad to bldg. | $975,000 |
| Feb 20, 2014 | Never finaled issued Feb 2014, no final | 168 Andover St | Spectrum Development Co. | revision to appl #2014.02.06.7967Details
revision to appl #2014.02.06.7967 | $20,000 |
| Feb 6, 2012 | Completed final sign-off Oct 2012 | 257 29th St | Pinnacle D B Inc. | interior remodel lower & uppre level, demo (e) int. walls, update bath & kitchen finishes lower & uper levels. relocate interior stairs, elet. & plumbing work. lower level 2-bedrooms, 1-bath, upper level (n) bath, library/den.Details
interior remodel lower & uppre level, demo (e) int. walls, update bath & kitchen finishes lower & uper levels. relocate interior stairs, elet. & plumbing work. lower level 2-bedrooms, 1-bath, upper level (n) bath, library/den. | $105,000 |
| Nov 14, 2011 | Completed final sign-off Jul 2012 | 333 Kearny St | Apc Construction | 5th floor t.i.- office/recording studio - add new interior walls as required none to be intricately structured to the bldg. conduct electrical work as required for new plan. mechanical, elec, plbg, sprinkler and fire alarm revisions under separate applications as required for new plan.Details
5th floor t.i.- office/recording studio - add new interior walls as required none to be intricately structured to the bldg. conduct electrical work as required for new plan. mechanical, elec, plbg, sprinkler and fire alarm revisions under separate applications as required for new plan. | $10,000 |