Fugnai Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2017 to Jul 2025
- Last 24 months
- 2 permits filed
12 permits since 2000: 10 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 28, 2025 | Completed final sign-off Dec 2025 | 1215 Pacific Av | unit 302: remodel 1 bathroom and 1 kitchen change kitchen cabinets. new flooring (laminate), new electrical in kind and plumbing.Details
unit 302: remodel 1 bathroom and 1 kitchen change kitchen cabinets. new flooring (laminate), new electrical in kind and plumbing. | $25,000 |
| Jun 4, 2025 | Completed final sign-off Jul 2025 | 1951 46th Av | replace 2 windows in kind. street visible. same size and location. windows to be either fiberglass or viynleDetails
replace 2 windows in kind. street visible. same size and location. windows to be either fiberglass or viynle | $2,000 |
| Nov 1, 2023 | Completed final sign-off Aug 2024 | 1215 Pacific Av | all in-kind for all units. apt# 201: remodel kitchen & bathroom, ceiling recess lights, plumb, elec, 1-window, 1-patio glass door. apt# 301: remodel kitchen & bathroom, ceiling recess lights, plumb, elec, i-window, 1-patio glass door. apt# 202: remodel kitchen only. replace rear exterior stucco wallDetails
all in-kind for all units. apt# 201: remodel kitchen & bathroom, ceiling recess lights, plumb, elec, 1-window, 1-patio glass door. apt# 301: remodel kitchen & bathroom, ceiling recess lights, plumb, elec, i-window, 1-patio glass door. apt# 202: remodel kitchen only. replace rear exterior stucco wall | $25,000 |
| Apr 14, 2023 | Completed final sign-off Apr 2024 | 1215 Pacific Av | repair six existing balconies in the rear of building in kindDetails
repair six existing balconies in the rear of building in kind | $50,000 |
| Jul 23, 2021 | Completed final sign-off Jul 2021 | 299 Peru Av | repair (replace hand rails on rear exterior stairs) left handrail on edinburg side was loose, repair/ replace as needed. complied w/ his#26217879-novDetails
repair (replace hand rails on rear exterior stairs) left handrail on edinburg side was loose, repair/ replace as needed. complied w/ his#26217879-nov | $100 |
| Aug 6, 2019 | Never finaled issued Aug 2019, no final | 97 Canyon Dr | replace 6 existing windows in front of the house and put new stucco on same wall; aluminum bronze, same operation, same style. 250 sqf apprx, aluminum bronzeDetails
replace 6 existing windows in front of the house and put new stucco on same wall; aluminum bronze, same operation, same style. 250 sqf apprx, aluminum bronze | $8,400 |
| Oct 31, 2018 | Completed final sign-off Sep 2020 | 875 30th Av | to remodel 2 kitchens & living/dining space at 2nd fl.Details
to remodel 2 kitchens & living/dining space at 2nd fl. | $68,000 |
| Oct 5, 2018 | Completed final sign-off Sep 2020 | 875 30th Av | street 4 window replacement - aluminum clad with wood. front of building. max. 32Details
street 4 window replacement - aluminum clad with wood. front of building. max. 32 | $2,307 |
| Aug 16, 2017 | Completed final sign-off Oct 2017 | 1 Daniel Burnham Ct | unit 716: replace kitchen cabinetsDetails
unit 716: replace kitchen cabinets | $3,000 |
| Aug 3, 2017 | Never finaled issued Jan 2018, no final | 1634 30th Av | work on 2/f: reconfigure existing kitchen & bathroom, replace existing wall with beam.Details
work on 2/f: reconfigure existing kitchen & bathroom, replace existing wall with beam. | $35,000 |
| Apr 12, 2017 | Completed final sign-off Jul 2018 | 1 Beachmont Dr | add two bathrooms in bedroomDetails
add two bathrooms in bedroom | $10,000 |
| Mar 10, 2017 | Completed final sign-off Oct 2017 | 2230 43rd Av | interior remodel: add one family room, one bath & one bedroom @ ground floor.Details
interior remodel: add one family room, one bath & one bedroom @ ground floor. | $40,000 |