Permit GraphShortlistSan Francisco building permits since 2000

Fugnai Construction

Contractor license
1002547
State license record
Based in
San Francisco
On San Francisco permits
Mar 2017 to Jul 2025
Last 24 months
2 permits filed

12 permits since 2000: 10 completed, 2 never finaled.

Of the 2 never-finaled permits, 2 are 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Stairs permits

AllStairs 1Kitchen remodel 5Bathroom remodel 5

1 stairs permit: 1 completed. Typically 0 days from filing to permit and 7 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jul 23, 2021Completed
final sign-off Jul 2021
299 Peru Avrepair (replace hand rails on rear exterior stairs) left handrail on edinburg side was loose, repair/ replace as needed. complied w/ his#26217879-nov
Details
Permit
202107234986
Status
complete
Filed
Jul 23, 2021
Permit issued
Jul 23, 2021
Final sign-off
Jul 30, 2021
Declared cost
$100
Address
299 Peru Av

repair (replace hand rails on rear exterior stairs) left handrail on edinburg side was loose, repair/ replace as needed. complied w/ his#26217879-nov

Open the permit page

$100
Fugnai Construction, contractor license 1002547 | Permit Graph