Fugnai Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2017 to Jul 2025
- Last 24 months
- 2 permits filed
12 permits since 2000: 10 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 0 days from filing to permit and 7 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 23, 2021 | Completed final sign-off Jul 2021 | 299 Peru Av | repair (replace hand rails on rear exterior stairs) left handrail on edinburg side was loose, repair/ replace as needed. complied w/ his#26217879-novDetails
repair (replace hand rails on rear exterior stairs) left handrail on edinburg side was loose, repair/ replace as needed. complied w/ his#26217879-nov | $100 |