Arris Build Group, Inc.
- Based in
- San Francisco
- On San Francisco permits
- Sep 2018 to Aug 2026
- Last 24 months
- 16 permits filed
34 permits since 2000: 16 completed, 9 in progress, 2 never finaled, 7 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 5, 2026 | In progress issued Aug 2026 | 500 07th Av | remove lightwell covering from roof.Details
remove lightwell covering from roof. | $500 |
| Jul 24, 2026 | In progress issued Jul 2026 | 1120 Jackson St | unit#7: painting, refinish hardwood flooring, replace in-kind kitchen cabinets, flooring for kitchen and bathroom, tiles in bathroom.Details
unit#7: painting, refinish hardwood flooring, replace in-kind kitchen cabinets, flooring for kitchen and bathroom, tiles in bathroom. | $20,000 |
| Apr 21, 2026 | Completed final sign-off Apr 2026 | 1758 Larkin St | to obtain final inspection for work approved under pa#: 202012090580. all work is complete.Details
to obtain final inspection for work approved under pa#: 202012090580. all work is complete. | |
| Apr 16, 2026 | Completed final sign-off Apr 2026 | 1758 Larkin St | to obtain final inspection for work approved under pa#'s 202301311124, 202408209106, and 202406184763. all work is complete.Details
to obtain final inspection for work approved under pa#'s 202301311124, 202408209106, and 202406184763. all work is complete. | |
| Apr 2, 2026 | Completed final sign-off Apr 2026 | 622 Broadway | removal of awning 2x4 and graffitiDetails
removal of awning 2x4 and graffiti | $1,000 |
| Mar 24, 2026 | In progress issued Mar 2026 | 523 Roosevelt Wy | new waterproofing on underside of (e) decks and balconies area. no structural alteration. less than 50%Details
new waterproofing on underside of (e) decks and balconies area. no structural alteration. less than 50% | $18,000 |
| Feb 5, 2026 | Completed final sign-off Mar 2026 | 1543 Haight St | repair of deteriorated rear siding.Details
repair of deteriorated rear siding. | $18,000 |
| Jan 21, 2026 | Completed final sign-off Sep 2026 | 671 38th Av | recommencement and completion of work approved undre pa# 202409241524.Details
recommencement and completion of work approved undre pa# 202409241524. | $10,000 |
| Dec 11, 2025 | In progress issued May 2026 | 4220 Geary Bl | g/f t.i.: no ext work under this permit. plumbing and fire sprinkler to be deferred. no change to (e) areas.Details
g/f t.i.: no ext work under this permit. plumbing and fire sprinkler to be deferred. no change to (e) areas. | $500,000 |
| Sep 18, 2025 | Completed final sign-off Mar 2026 | 1324 Balboa St | at 1st fl garage, enlarge (e) garage door opening to 9'-6". new door to (e) lobby & stair from garageDetails
at 1st fl garage, enlarge (e) garage door opening to 9'-6". new door to (e) lobby & stair from garage | $13,670 |
| Jul 23, 2025 | Completed final sign-off Nov 2025 | 1614 Grove St | bathroom remodel, water closet remodel, kitchen remodel. new sinks, new cabinets, new exhaust fan, range, hood, toilet. (replace in-kind)Details
bathroom remodel, water closet remodel, kitchen remodel. new sinks, new cabinets, new exhaust fan, range, hood, toilet. (replace in-kind) | $20,000 |
| May 23, 2025 | In progress issued Sep 2025 | 2230 Mission St | foundation repair, replace due to field condition. reference building permit# 2018-0914-0336. upgrade existing restroom to fully accessible.Details
foundation repair, replace due to field condition. reference building permit# 2018-0914-0336. upgrade existing restroom to fully accessible. | $50,000 |
| Jan 23, 2025 | Completed final sign-off Nov 2025 | 867 Oak St | to comply w/ #202432474 item #3: repair fire damaged deck, railing, building structure (siding, framing, etc.) replace damaged doors and windows with similar/alike of existing. replace damaged flooring and light fixture at 3/f & 4/f in kind.Details
to comply w/ #202432474 item #3: repair fire damaged deck, railing, building structure (siding, framing, etc.) replace damaged doors and windows with similar/alike of existing. replace damaged flooring and light fixture at 3/f & 4/f in kind. | $100,000 |
| Jan 21, 2025 | Expired or cancelled expired Jun 2026 | 1758 Larkin St | revision to pa # 2021-0528-1316 revise column footing per plansDetails
revision to pa # 2021-0528-1316 revise column footing per plans | |
| Nov 7, 2024 | In progress filed Nov 2024, not yet issued | 8045 Geary Bl | install (n) steel columns under (e) steel bm's in garage where currently supported on urm brick wallsDetails
install (n) steel columns under (e) steel bm's in garage where currently supported on urm brick walls | $25,000 |
| Nov 1, 2024 | Expired or cancelled withdrawn May 2025 | 8045 Geary Bl | voluntary seismic improvements to base level for 12 unit bldgDetails
voluntary seismic improvements to base level for 12 unit bldg | $75,000 |
| Aug 20, 2024 | Expired or cancelled expired Jun 2026 | 1758 Larkin St | revision to pa# 202105281316: add ramp for extended garage use prior to future adu and revise (n) column layout.Details
revision to pa# 202105281316: add ramp for extended garage use prior to future adu and revise (n) column layout. | |
| Jun 24, 2024 | Completed final sign-off May 2025 | 1476 California St | residential - soft story retrofit per sfebc chapter 45 engineering criteria 2022 cebs appendix a-4. to comply with nov 202301466. excavate less than 5 cubic yards.Details
residential - soft story retrofit per sfebc chapter 45 engineering criteria 2022 cebs appendix a-4. to comply with nov 202301466. excavate less than 5 cubic yards. | $75,000 |
| Jun 24, 2024 | Completed final sign-off Jun 2025 | 1490 California St | commecial - soft story retrofit per sfebc chapter 45 engineering criteria 2022 cebs appendix a-4. to comply with nov 202301466. excavate less than 5 cubic yards.Details
commecial - soft story retrofit per sfebc chapter 45 engineering criteria 2022 cebs appendix a-4. to comply with nov 202301466. excavate less than 5 cubic yards. | $15,000 |
| Jun 18, 2024 | Expired or cancelled expired Jun 2026 | 1758 Larkin St | revision to 202012090580 soft story mitigation per chap 4d of 2016 sfebc per 2016 cebc appendix a4Details
revision to 202012090580 soft story mitigation per chap 4d of 2016 sfebc per 2016 cebc appendix a4 | |
| Apr 23, 2024 | In progress filed Apr 2024, not yet issued | 3981 Alemany Bl | #212: remodel kitchen and bathrooms, painting, and flooring.Details
#212: remodel kitchen and bathrooms, painting, and flooring. | $60,000 |
| Aug 11, 2023 | Completed final sign-off Jul 2024 | 413 Haight St | revision to permit 202208220962. basement: steel frame at front in lieu of concrete shearwall. retain (e) brick footings at new concrete grade beams.Details
revision to permit 202208220962. basement: steel frame at front in lieu of concrete shearwall. retain (e) brick footings at new concrete grade beams. | |
| Jan 31, 2023 | Expired or cancelled expired Jun 2026 | 1758 Larkin St | revision to pa 2020-1209-0580 (soft story retrofit per chapter 4d of 2016 sfebc, appendix a4)Details
revision to pa 2020-1209-0580 (soft story retrofit per chapter 4d of 2016 sfebc, appendix a4) | |
| Aug 22, 2022 | Completed final sign-off Jul 2024 | 401 Haight St | soft story retrofit to comply with sfbec 406d.2.5. 2016 ca existing bldg coe appendix a-4. repair one bldg entry to proivde accessible entrance. revision to pa# 201809049011 and 201809049010Details
soft story retrofit to comply with sfbec 406d.2.5. 2016 ca existing bldg coe appendix a-4. repair one bldg entry to proivde accessible entrance. revision to pa# 201809049011 and 201809049010 | |
| Aug 22, 2022 | Completed final sign-off Jul 2024 | 413 Haight St | soft story retrofit to comply with sfbec 406d.2.5. 2016 ca existing bldg coe appendix a-4. repair one bldg entry to proivde accessible entrance with vertical door bar actuator.Details
soft story retrofit to comply with sfbec 406d.2.5. 2016 ca existing bldg coe appendix a-4. repair one bldg entry to proivde accessible entrance with vertical door bar actuator. | $10,000 |
| Dec 9, 2021 | Never finaled issued Aug 2023, no final | 1794 Haight St | abe program - new threshold.Details
abe program - new threshold. | $2,000 |
| Jun 17, 2021 | Never finaled issued Aug 2023, no final | 1792 Haight St | new threshold under abe program. commercial entranceDetails
new threshold under abe program. commercial entrance | $2,500 |
| May 28, 2021 | Expired or cancelled expired Jun 2026 | 1758 Larkin St | lower slab elevation, underpinning (e) footings, new retaining wall and new steel beam for future adu (ref pa 201910245461). basement foundation work only.Details
lower slab elevation, underpinning (e) footings, new retaining wall and new steel beam for future adu (ref pa 201910245461). basement foundation work only. | $30,000 |
| Dec 9, 2020 | Expired or cancelled expired Jun 2026 | 1758 Larkin St | soft story mitigation per chapter 4d of 2016 sfebc per 2016 cebc appendix a4. remaining work for adu in phase 2 per pa # 201910245461 or future permit.Details
soft story mitigation per chapter 4d of 2016 sfebc per 2016 cebc appendix a4. remaining work for adu in phase 2 per pa # 201910245461 or future permit. | $45,000 |
| Oct 14, 2020 | Completed final sign-off Oct 2023 | 1381 Washington St | soft story per sfebc 2019 cebc chapter 4d appendix a4 (residential)Details
soft story per sfebc 2019 cebc chapter 4d appendix a4 (residential) | $95,000 |
| Oct 14, 2020 | Completed final sign-off Oct 2023 | 1381 Washington St | soft story per sfebc 2016 cebc chapter 4d appendix a4. da checklist - compliance disabled access 20% rule. (commercial)Details
soft story per sfebc 2016 cebc chapter 4d appendix a4. da checklist - compliance disabled access 20% rule. (commercial) | $10,000 |
| Aug 31, 2020 | Completed final sign-off Mar 2025 | 862 42nd Av | new 55 sf horizontal addition @ 1st floor rear building.rebuild 325 sqft @ 1st floor rear-interior remodel 875 sqft @ 1st floor rear, rebuild deck 200 sqft @ 2nd floor rear- add new deck @ 2nd floor rear.add adu on first floor. per ordincance 162-62Details
new 55 sf horizontal addition @ 1st floor rear building.rebuild 325 sqft @ 1st floor rear-interior remodel 875 sqft @ 1st floor rear, rebuild deck 200 sqft @ 2nd floor rear- add new deck @ 2nd floor rear.add adu on first floor. per ordincance 162-62 | $150,000 |
| Sep 14, 2018 | In progress issued Oct 2024 | 2230 Mission St | **commercial**. soft story retrofit per sfebc chapter 4d engineering criteria. 2016 cebc appendix a-4. installation of steel moment frames, plywood shear walls and foundation. the design is per 2016 cebc appendix a-4.Details
**commercial**. soft story retrofit per sfebc chapter 4d engineering criteria. 2016 cebc appendix a-4. installation of steel moment frames, plywood shear walls and foundation. the design is per 2016 cebc appendix a-4. | $45,000 |
| Sep 14, 2018 | In progress issued Oct 2024 | 2230 Mission St | **residential**. soft story retrofit installation of plywood shear walls & foundation per sfebc chapter 4d engineering criteria. 2016 cebc appendix a-4.Details
**residential**. soft story retrofit installation of plywood shear walls & foundation per sfebc chapter 4d engineering criteria. 2016 cebc appendix a-4. | $40,000 |