Arris Build Group, Inc.
- Based in
- San Francisco
- On San Francisco permits
- Sep 2018 to Aug 2026
- Last 24 months
- 16 permits filed
34 permits since 2000: 16 completed, 9 in progress, 2 never finaled, 7 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
3 deck permits: 2 completed, 1 in progress. Typically 78 days from filing to permit and 750 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 24, 2026 | In progress issued Mar 2026 | 523 Roosevelt Wy | new waterproofing on underside of (e) decks and balconies area. no structural alteration. less than 50%Details
new waterproofing on underside of (e) decks and balconies area. no structural alteration. less than 50% | $18,000 |
| Jan 23, 2025 | Completed final sign-off Nov 2025 | 867 Oak St | to comply w/ #202432474 item #3: repair fire damaged deck, railing, building structure (siding, framing, etc.) replace damaged doors and windows with similar/alike of existing. replace damaged flooring and light fixture at 3/f & 4/f in kind.Details
to comply w/ #202432474 item #3: repair fire damaged deck, railing, building structure (siding, framing, etc.) replace damaged doors and windows with similar/alike of existing. replace damaged flooring and light fixture at 3/f & 4/f in kind. | $100,000 |
| Aug 31, 2020 | Completed final sign-off Mar 2025 | 862 42nd Av | new 55 sf horizontal addition @ 1st floor rear building.rebuild 325 sqft @ 1st floor rear-interior remodel 875 sqft @ 1st floor rear, rebuild deck 200 sqft @ 2nd floor rear- add new deck @ 2nd floor rear.add adu on first floor. per ordincance 162-62Details
new 55 sf horizontal addition @ 1st floor rear building.rebuild 325 sqft @ 1st floor rear-interior remodel 875 sqft @ 1st floor rear, rebuild deck 200 sqft @ 2nd floor rear- add new deck @ 2nd floor rear.add adu on first floor. per ordincance 162-62 | $150,000 |