Block 3733, lot 008
250 04th St
- City’s use
- Commercial Hotel
- Built
- 2019
- Stories
- 12
- Units
- 194
- Building
- 111,128 sq ft
- Lot
- 10,400 sq ft
- Zoning
- C3S
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
40 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 30, 2023 | Expired or cancelled cancelled May 2024 | 250 04th St | Discount Signs & Neon Inc | install (3) non-illuminated wall plaques 2'x 3'4"Details
install (3) non-illuminated wall plaques 2'x 3'4" | $1,500 |
| Jan 30, 2023 | Never finaled issued Jan 2023, no final | 250 04th St | Discount Signs & Neon Inc | install (1) illuminated wall sign into (e) metal canopyDetails
install (1) illuminated wall sign into (e) metal canopy | $5,500 |
| Dec 30, 2021 | Completed final sign-off May 2024 | 250 04th St | fire alarm as-built drawings for pa 201306280802 closure. administrative / documentation; additional work in field is not anticipated.Details
fire alarm as-built drawings for pa 201306280802 closure. administrative / documentation; additional work in field is not anticipated. | ||
| May 28, 2021 | Completed final sign-off Mar 2022 | 250 04th St | errcs upgrade - revision to pa #2013-0628-0802-s11 1. reprogram frequencies per ccsf dt 2. replace rooftop yagi antenna with a panel antenna 3. re-test errcs per ab #2.04 2019 4. coordinate inspections w/ccsf dt & sffdDetails
errcs upgrade - revision to pa #2013-0628-0802-s11 1. reprogram frequencies per ccsf dt 2. replace rooftop yagi antenna with a panel antenna 3. re-test errcs per ab #2.04 2019 4. coordinate inspections w/ccsf dt & sffd | ||
| Feb 13, 2019 | Expired or cancelled cancelled Jul 2023 | 250 04th St | Sabah International Incorporated | as built fire alarm ref pa 2013-0628-0802Details
as built fire alarm ref pa 2013-0628-0802 | $10,000 |
| Jan 16, 2019 | Never finaled issued Jan 2019, no final | 250 04th St | revision to previously approved pa #201708286124. designated 12th fl passageway as part of kitchen ceiling height from 7'6" to 7'0", revised sheets cs-5- egress plan and revised occupant load on level 12. maher n/a.Details
revision to previously approved pa #201708286124. designated 12th fl passageway as part of kitchen ceiling height from 7'6" to 7'0", revised sheets cs-5- egress plan and revised occupant load on level 12. maher n/a. | ||
| Jan 11, 2019 | Never finaled issued Jan 2019, no final | 250 04th St | street spaceDetails
street space | ||
| Dec 12, 2018 | Completed final sign-off Jan 2019 | 250 04th St | Aaa Restaurant Fire Control/Dba Aaa Fire | furnish & install 2 ansul r-102 fire supression system in the main kitchen on the ground floor. furnish & install one ansul r-102 fire suppression systme in the kitchen areas on the 2nd floor and 1 ansul r-102 fire suppression system in the kitchen area on the 6th floor. ref app#201708286124Details
furnish & install 2 ansul r-102 fire supression system in the main kitchen on the ground floor. furnish & install one ansul r-102 fire suppression systme in the kitchen areas on the 2nd floor and 1 ansul r-102 fire suppression system in the kitchen area on the 6th floor. ref app#201708286124 | $12,000 |
| Nov 19, 2018 | Completed final sign-off Jun 2019 | 250 04th St | revision to 201306280802 s12 elevator landing two-way communications systemDetails
revision to 201306280802 s12 elevator landing two-way communications system | ||
| Oct 30, 2018 | Never finaled issued Nov 2018, no final | 250 04th St | revision to pa #201611042066. revised smoke control report as requested by sffd plan check to be shown on mechanical sheets.Details
revision to pa #201611042066. revised smoke control report as requested by sffd plan check to be shown on mechanical sheets. | ||
| Oct 1, 2018 | Never finaled issued Oct 2018, no final | 250 04th St | street spaceDetails
street space | ||
| Aug 17, 2018 | Never finaled issued Aug 2018, no final | 250 04th St | street spaceDetails
street space | ||
| Jul 10, 2018 | Expired or cancelled cancelled Aug 2023 | 250 04th St | Sabah International Incorporated | modify existing fire alarm system to provide additional coverage for the 12th fl. ti, add (1) ceiling speaker/strobe, (3) ceiling strobe, (3) weather proof speaker/strobe, (1) single input module.Details
modify existing fire alarm system to provide additional coverage for the 12th fl. ti, add (1) ceiling speaker/strobe, (3) ceiling strobe, (3) weather proof speaker/strobe, (1) single input module. | $7,000 |
| Jun 12, 2018 | Never finaled issued Jun 2018, no final | 250 04th St | street spaceDetails
street space | ||
| May 25, 2018 | Completed final sign-off Jun 2019 | 250 04th St | Arrow Sign Company | install 1 electric single faced sign on (e) steel canopy "virgin hotels"Details
install 1 electric single faced sign on (e) steel canopy "virgin hotels" | $4,500 |
| May 25, 2018 | Completed final sign-off Jun 2019 | 250 04th St | Arrow Sign Company | install 1 electric single faced wall sign "the commons club"Details
install 1 electric single faced wall sign "the commons club" | $4,000 |
| May 25, 2018 | Completed final sign-off Jun 2019 | 250 04th St | Arrow Sign Company | install 1 electric single faced sign on (e) steel canopy "virgin hotels"Details
install 1 electric single faced sign on (e) steel canopy "virgin hotels" | $5,000 |
| May 25, 2018 | Completed final sign-off Jun 2019 | 250 04th St | Arrow Sign Company | install 1 electrc projectin double faced blade sign "virgin hotel"Details
install 1 electrc projectin double faced blade sign "virgin hotel" | $4,500 |
| Jan 5, 2018 | Never finaled issued Jan 2018, no final | 250 04th St | revision to previously approved pa #201708286124. designated 12th fl passageway as part of kitchen. ceiling height from 7'-6" to 7'-0".Details
revision to previously approved pa #201708286124. designated 12th fl passageway as part of kitchen. ceiling height from 7'-6" to 7'-0". | ||
| Oct 31, 2017 | Never finaled issued Oct 2017, no final | 250 04th St | Fuel Oil System | no additional work will be performed based on inspectors' comments. new changes in details of drawings have been encorporated. ref pa# 201306280802 (s-9).Details
no additional work will be performed based on inspectors' comments. new changes in details of drawings have been encorporated. ref pa# 201306280802 (s-9). | |
| Aug 28, 2017 | Never finaled issued Aug 2017, no final | 250 04th St | interior improvements for lower level, lobby level, mezzanine and 12th floor: interior lighting and associated title 24 to be submitted to sfdbi under separate permit. ref. p.a. #201306280802s4Details
interior improvements for lower level, lobby level, mezzanine and 12th floor: interior lighting and associated title 24 to be submitted to sfdbi under separate permit. ref. p.a. #201306280802s4 | $25,000 | |
| Nov 4, 2016 | Never finaled issued Dec 2016, no final | 250 04th St | revision to ref 2013 0628 0802 s3: revise archsheets to re-label elevators & lobbies as fire service access elevators & basement and 1st floor as lower level & lobby respectively. revise roof plan to show catwalk, as well as mechanical sheets to show control report and panels as reqd by sffdDetails
revision to ref 2013 0628 0802 s3: revise archsheets to re-label elevators & lobbies as fire service access elevators & basement and 1st floor as lower level & lobby respectively. revise roof plan to show catwalk, as well as mechanical sheets to show control report and panels as reqd by sffd | ||
| Oct 13, 2016 | Completed final sign-off Mar 2019 | 250 04th St | Pribuss Engineering Inc | fire sprinkler t.i. for interior improvements arch ref pa# #201306280802 s4 - adds 243 heads. previously appproved sprinkler plans for core building approved under 201306280802 s5.Details
fire sprinkler t.i. for interior improvements arch ref pa# #201306280802 s4 - adds 243 heads. previously appproved sprinkler plans for core building approved under 201306280802 s5. | $125,709 |
| Sep 23, 2016 | Never finaled issued Oct 2016, no final | 250 04th St | revision to app#201306280802 s-2. window washing catwalk addition to penthouse steel framing plans.Details
revision to app#201306280802 s-2. window washing catwalk addition to penthouse steel framing plans. | $10,000 | |
| Mar 14, 2016 | Never finaled issued May 2016, no final | 250 04th St | The Whiting-Turner Contracting Company | revision to pa# 2013/06/28/0802-s2. provid erevision to superstructure thats been issued.Details
revision to pa# 2013/06/28/0802-s2. provid erevision to superstructure thats been issued. | $5,000 |
| Feb 16, 2016 | Never finaled issued Mar 2016, no final | 250 04th St | The Whiting-Turner Contracting Company | tower crane erection operating submittal for 201306280802 and 201510301352Details
tower crane erection operating submittal for 201306280802 and 201510301352 | $96,000 |
| Oct 30, 2015 | Never finaled issued Jan 2016, no final | 250 04th St | The Whiting-Turner Contracting Company | revision to 2013-06-28-0802-s1. providing revision to foundation, site permit, underground utilities.Details
revision to 2013-06-28-0802-s1. providing revision to foundation, site permit, underground utilities. | $5,000 |
| Sep 1, 2015 | Never finaled issued Sep 2015, no final | 250 04th St | revision to pa 2014-0312-0536 cantilevered soldier shoring will utilize basement will be used for temporary shoringDetails
revision to pa 2014-0312-0536 cantilevered soldier shoring will utilize basement will be used for temporary shoring | ||
| Mar 12, 2014 | Never finaled issued Jul 2014, no final | 250 04th St | cantilever soldier pile shoring wall where (e) basement wall will be used for temporary shoring. a waler system will be installed between piles.Details
cantilever soldier pile shoring wall where (e) basement wall will be used for temporary shoring. a waler system will be installed between piles. | $40,000 | |
| Dec 20, 2013 | Never finaled issued Apr 2014, no final | 250 04th St | to demolish 2 stories, office building.Details
to demolish 2 stories, office building. | $26,500 | |
| Jun 28, 2013 | Never finaled issued Sep 2014, no final | 250 04th St | The Whiting-Turner Contracting Company, Sabah International Incorporated, Fuel Oil System, Austin Building & Design, Inc. | to erect 12 stories, 1 basement, 208 units hotel, commercial & restaurant building.Details
to erect 12 stories, 1 basement, 208 units hotel, commercial & restaurant building. | $17,500,000 |
| Sep 29, 2003 | Completed final sign-off Jan 2004 | 250 04th St | Bay Alarm Company | monitoring system installDetails
monitoring system install | $3,400 |
| Aug 22, 2001 | Expired or cancelled expired Aug 2002 | 250 04th St | street spaceDetails
street space | ||
| Aug 22, 2001 | Completed final sign-off Sep 2001 | 250 04th St | California Roof Management | reroofingDetails
reroofing | $60,000 |
| Jun 6, 2001 | Completed final sign-off Dec 2001 | 250 04th St | remove & replace exterior windows, no increase or change to openings sizeDetails
remove & replace exterior windows, no increase or change to openings size | $12,000 | |
| May 14, 2001 | Completed final sign-off Dec 2001 | 250 04th St | oti-1 2nd floor el meDetails
oti-1 2nd floor el me | $82,000 | |
| May 7, 2001 | Expired or cancelled expired Sep 2001 | 250 04th St | sidewalk repairDetails
sidewalk repair | ||
| Jun 16, 2000 | Completed final sign-off Aug 2000 | 250 04th St | rev. o pa#200004187526r-2Details
rev. o pa#200004187526r-2 | ||
| Apr 18, 2000 | Completed final sign-off Aug 2000 | 250 04th St | loading dock modification with 2000/03/03/3375. demo same concrete,new concrete sections & mechanicaDetails
loading dock modification with 2000/03/03/3375. demo same concrete,new concrete sections & mechanica | $30,000 | |
| Mar 3, 2000 | Completed final sign-off Aug 2000 | 250 04th St | g/f renovation convert (e) museum spaces to office useDetails
g/f renovation convert (e) museum spaces to office use | $450,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Arrow Sign Company (4), The Whiting-Turner Contracting Company (4), Sabah International Incorporated (3), Discount Signs & Neon Inc (2), Fuel Oil System (2), Aaa Restaurant Fire Control/Dba Aaa Fire, Austin Building & Design, Inc., Bay Alarm Company, California Roof Management, Pribuss Engineering Inc
- Architects
- James Hielbronner (6), Shawn Alexander (2)
- Engineers
- Jeffrey Brink (2), Roger Heeringa (2), Dorel Anghel, John Edward Neshek, Varinder Singh
- Authorized agent-otherss
- Lewis James Burrows
Find contractors for work like this