Roger Heeringa
- License
- 4536
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- authorized agent-others, engineer
- Firm
- Dci & Sde Engineers
- Based in
- San Francisco
- On San Francisco permits
- Jul 2005 to May 2014
4 permits since 2000 (engineer on 3 permits, authorized agent-others on 1 permit): 1 completed, 3 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Reno Contracting Inc.
- Architects
- Cory Steven Creath, Mark Dorian, Shawn Alexander
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 3
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 9, 2014 | Never finaled issued May 2015, no final | 33 Powell St | Reno Contracting Inc. | exterior minor alteration to (e) powell hotel work on powell street elevation includes: new entrance, new 10 windows, removing fire escape ladder exterior work on cyril magnin st elevation includes new entrance, replacement of 5 windows in kind, removing decorative towers, fire escape ladderDetails
exterior minor alteration to (e) powell hotel work on powell street elevation includes: new entrance, new 10 windows, removing fire escape ladder exterior work on cyril magnin st elevation includes new entrance, replacement of 5 windows in kind, removing decorative towers, fire escape ladder | $270,000 |
| Mar 12, 2014 | Never finaled issued Jul 2014, no final | 250 04th St | cantilever soldier pile shoring wall where (e) basement wall will be used for temporary shoring. a waler system will be installed between piles.Details
cantilever soldier pile shoring wall where (e) basement wall will be used for temporary shoring. a waler system will be installed between piles. | $40,000 | |
| Dec 20, 2013 | Never finaled issued Apr 2014, no final | 250 04th St | to demolish 2 stories, office building.Details
to demolish 2 stories, office building. | $26,500 | |
| Jul 15, 2005 | Completed final sign-off Jun 2007 | 1001 Potrero Av | city job-disability access site work consist of accessible parking,elevator/path of travel upgrades.Details
city job-disability access site work consist of accessible parking,elevator/path of travel upgrades. |