Roger Heeringa
- Listed as
- authorized agent-others, engineer
- Firm
- Dci & Sde Engineers
- Based in
- San Francisco
- On San Francisco permits
- Jul 2005 to May 2014
4 permits since 2000 (engineer on 3 permits, authorized agent-others on 1 permit): 1 completed, 3 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 9, 2014 | Never finaled issued May 2015, no final | 33 Powell St | Reno Contracting Inc. | exterior minor alteration to (e) powell hotel work on powell street elevation includes: new entrance, new 10 windows, removing fire escape ladder exterior work on cyril magnin st elevation includes new entrance, replacement of 5 windows in kind, removing decorative towers, fire escape ladderDetails
exterior minor alteration to (e) powell hotel work on powell street elevation includes: new entrance, new 10 windows, removing fire escape ladder exterior work on cyril magnin st elevation includes new entrance, replacement of 5 windows in kind, removing decorative towers, fire escape ladder | $270,000 |
| Mar 12, 2014 | Never finaled issued Jul 2014, no final | 250 04th St | cantilever soldier pile shoring wall where (e) basement wall will be used for temporary shoring. a waler system will be installed between piles.Details
cantilever soldier pile shoring wall where (e) basement wall will be used for temporary shoring. a waler system will be installed between piles. | $40,000 | |
| Dec 20, 2013 | Never finaled issued Apr 2014, no final | 250 04th St | to demolish 2 stories, office building.Details
to demolish 2 stories, office building. | $26,500 | |
| Jul 15, 2005 | Completed final sign-off Jun 2007 | 1001 Potrero Av | city job-disability access site work consist of accessible parking,elevator/path of travel upgrades.Details
city job-disability access site work consist of accessible parking,elevator/path of travel upgrades. |