Reno Contracting Inc.
- Based in
- San Diego
- On San Francisco permits
- May 2014 to Aug 2015
- Last 24 months
- 0 permits filed
17 permits since 2000: 17 never finaled.
Of the 17 never-finaled permits, 17 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 25, 2015 | Never finaled issued Sep 2015, no final | 33 Powell St | install fire evacuation sisgns within building. fire only permit. n/a for maher.Details
install fire evacuation sisgns within building. fire only permit. n/a for maher. | $1,500 |
| Jun 29, 2015 | Never finaled issued Aug 2015, no final | 33 Powell St | new electrical vault at basement level providing new electrical transformer with the proper opening and new manholes at the sidewalk level and new paving to match existing as required. no changes to exterior envelope.Details
new electrical vault at basement level providing new electrical transformer with the proper opening and new manholes at the sidewalk level and new paving to match existing as required. no changes to exterior envelope. | $50,000 |
| Jun 15, 2015 | Never finaled issued Jun 2015, no final | 33 Powell St | revision to app#201410017815. add another five blocking detail for hotels fire rated wall. n/a for the maher.Details
revision to app#201410017815. add another five blocking detail for hotels fire rated wall. n/a for the maher. | |
| Jun 9, 2015 | Never finaled issued Jun 2015, no final | 33 Powell St | basement & 1st fl: revision to voluntary seismic pa#201407282323 and 201410017815. revision to column and beam detail shown on sheets s2.1,s2.2,s3.1,s3.2,s2.2a,s2.3a and s4.2. n/a ordinance #155-13Details
basement & 1st fl: revision to voluntary seismic pa#201407282323 and 201410017815. revision to column and beam detail shown on sheets s2.1,s2.2,s3.1,s3.2,s2.2a,s2.3a and s4.2. n/a ordinance #155-13 | |
| Jun 5, 2015 | Never finaled issued Jun 2015, no final | 33 Powell St | revision to appl #2014.1001.7815 - add a fire blocking detail for hotels fire rated walls. n/a maher ordinanceDetails
revision to appl #2014.1001.7815 - add a fire blocking detail for hotels fire rated walls. n/a maher ordinance | |
| Mar 11, 2015 | Never finaled issued Jan 2016, no final | 33 Powell St | erect a double faced projecting non-electric sign.(maher ordinance - extended ordinance no.155-13 n/a)Details
erect a double faced projecting non-electric sign.(maher ordinance - extended ordinance no.155-13 n/a) | $7,000 |
| Mar 11, 2015 | Never finaled issued Jan 2016, no final | 28 Cyril Magnin St | erect a double faced projecting non-electric sign. (maher ordinance -extended - ordinance 155-13 n/a)Details
erect a double faced projecting non-electric sign. (maher ordinance -extended - ordinance 155-13 n/a) | $7,000 |
| Feb 27, 2015 | Never finaled issued Jul 2015, no final | 28 Cyril Magnin St | to erect single faced non eletrical sign. n/a for maher.Details
to erect single faced non eletrical sign. n/a for maher. | $200 |
| Feb 27, 2015 | Never finaled issued Jul 2015, no final | 28 Cyril Magnin St | to erect single faced non electric sign n/a for maher.Details
to erect single faced non electric sign n/a for maher. | $600 |
| Feb 23, 2015 | Never finaled issued Jul 2015, no final | 33 Powell St | non structural sign. n/a for maher ordinance.Details
non structural sign. n/a for maher ordinance. | $200 |
| Feb 23, 2015 | Never finaled issued Jul 2015, no final | 33 Powell St | non structural sign. n/a for maher ordinance.Details
non structural sign. n/a for maher ordinance. | $300 |
| Feb 23, 2015 | Never finaled issued Jul 2015, no final | 33 Powell St | non structural sign. n/a for maher ordinance.Details
non structural sign. n/a for maher ordinance. | $600 |
| Jan 27, 2015 | Never finaled issued Feb 2015, no final | 33 Powell St | revision to 201407282323. increase length of shear wall. on mezzanine, add wood ledger to new concrete shear wall additional 15/32 apa rated floor sheathing on 3rd, 4th , 5th ,6th fl maher not reqDetails
revision to 201407282323. increase length of shear wall. on mezzanine, add wood ledger to new concrete shear wall additional 15/32 apa rated floor sheathing on 3rd, 4th , 5th ,6th fl maher not req | |
| Dec 4, 2014 | Never finaled issued Dec 2014, no final | 33 Powell St | demolition of hotel interior non-structural walls and ceiling. only basement, 2nd-6th floor. first flr and mezzanine to remain. sprinkler and exits to remain. no change in number of units. all ti & accessibility work under pa#201410017815. building remain vacant until ti work completed. per ab-017.Details
demolition of hotel interior non-structural walls and ceiling. only basement, 2nd-6th floor. first flr and mezzanine to remain. sprinkler and exits to remain. no change in number of units. all ti & accessibility work under pa#201410017815. building remain vacant until ti work completed. per ab-017. | $125,000 |
| Oct 1, 2014 | Never finaled issued May 2015, no final | 33 Powell St | upgrade throughout. remodel basement, ground floor lobby & mezzanine. remodel hotel rooms & increase from 138 to 155 hotel guest rooms. no changes to exterior & building footprint. life safety under separate permit.** maher: compliance with ordinance no# 155-13 not required **Details
upgrade throughout. remodel basement, ground floor lobby & mezzanine. remodel hotel rooms & increase from 138 to 155 hotel guest rooms. no changes to exterior & building footprint. life safety under separate permit.** maher: compliance with ordinance no# 155-13 not required ** | $7,000,000 |
| Jul 28, 2014 | Never finaled issued Dec 2014, no final | 33 Powell St | voluntary seismic upgrade from basement to underside of 2nd floor. plus plywood sheathing at floors 2-6. (n) public bathrooms in basement. ** maher: compliance with ordinance no# 155-13 not required **Details
voluntary seismic upgrade from basement to underside of 2nd floor. plus plywood sheathing at floors 2-6. (n) public bathrooms in basement. ** maher: compliance with ordinance no# 155-13 not required ** | $1,200,000 |
| May 9, 2014 | Never finaled issued May 2015, no final | 33 Powell St | exterior minor alteration to (e) powell hotel work on powell street elevation includes: new entrance, new 10 windows, removing fire escape ladder exterior work on cyril magnin st elevation includes new entrance, replacement of 5 windows in kind, removing decorative towers, fire escape ladderDetails
exterior minor alteration to (e) powell hotel work on powell street elevation includes: new entrance, new 10 windows, removing fire escape ladder exterior work on cyril magnin st elevation includes new entrance, replacement of 5 windows in kind, removing decorative towers, fire escape ladder | $270,000 |