Permit 201303071715
650 Townsend St
the existing pre-action system-zone 3 is to remain in place w/ the make up piping removed. a flow switch is to ge installed and the existing pre-action piping is to be filled making it wet. the riser will remain attached to the standpipe w/ new water flow swithch and tamper sprinkler pa#201302220743
- Outcome
- Completed (city status: complete, Apr 26, 2013)
- Filed
- Mar 7, 2013
- Permit issued
- Mar 8, 2013
- Final sign-off
- Apr 26, 2013
- Declared cost
- $12,000
- Building use
- office
- Neighborhood
- South of Market
- Contractor
- Orr Protection Systems Inc (license 952133)
- Property
- All permits at this address (block 3783, lot 009)