Block 3739, lot 008
200 Main St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
19 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 24, 2025 | Completed final sign-off Nov 2025 | 250 Main St | to obtain final inspection for work approved under 202407025691. all work is completeDetails
to obtain final inspection for work approved under 202407025691. all work is complete | ||
| Feb 20, 2025 | Completed final sign-off Nov 2025 | 250 Main St | K A Construction | revision to pa# 202407025691: update one page on plans with correct walls height.Details
revision to pa# 202407025691: update one page on plans with correct walls height. | |
| Jul 2, 2024 | Expired or cancelled expired Nov 2025 | 250 Main St | K A Construction | food prep. install and plumbing for (n) hand sink, prep sink & three compartment sinks. for installed on walls behind it.Details
food prep. install and plumbing for (n) hand sink, prep sink & three compartment sinks. for installed on walls behind it. | $18,500 |
| Aug 4, 2022 | Expired or cancelled cancelled Jan 2026 | 200 Main St | change of use: transbay building office 1,2,3 to be use as art studio on the east crossing activation. current use is for office. art studio added to the use.Details
change of use: transbay building office 1,2,3 to be use as art studio on the east crossing activation. current use is for office. art studio added to the use. | $500 | |
| Apr 8, 2022 | Never finaled issued Jun 2022, no final | 250 Main St | Barker-O'donoghue Master Bldrs | create outdoor cinema in former transbay bus terminal lot. site consists of chainlink fenced perimeter with 3 storage containers. two containers to be stacked and rigged with truss to support led screen.Details
create outdoor cinema in former transbay bus terminal lot. site consists of chainlink fenced perimeter with 3 storage containers. two containers to be stacked and rigged with truss to support led screen. | $140,000 |
| Dec 20, 2019 | Never finaled filed Dec 2019, never issued | 200 Main St | erect a 16 stories 192 residential type 1a construction with two basement apartment building, maher ordinance yes.Details
erect a 16 stories 192 residential type 1a construction with two basement apartment building, maher ordinance yes. | $60,362,400 | |
| Dec 20, 2019 | Never finaled filed Dec 2019, never issued | 200 Main St | erect a 47 stories 491 residential units type 1a construction no basement apartment building, maher ordinance yes.Details
erect a 47 stories 491 residential units type 1a construction no basement apartment building, maher ordinance yes. | $195,299,100 | |
| Nov 3, 2009 | Completed final sign-off Jun 2011 | 200 Folsom St | Mc Guire And Hester | tjpa sign: greyhound. for location, see pa no. 200712211192s, sheet no. a-101.e key note (9).Details
tjpa sign: greyhound. for location, see pa no. 200712211192s, sheet no. a-101.e key note (9). | |
| Aug 4, 2009 | Completed final sign-off Jun 2011 | 200 Folsom St | Mc Guire And Hester | tjpa sign: relocated l.e.d. display signs h-1 thru h-37. (see drawings attached to pa no. 200908044093)Details
tjpa sign: relocated l.e.d. display signs h-1 thru h-37. (see drawings attached to pa no. 200908044093) | |
| Aug 4, 2009 | Completed final sign-off Jan 2011 | 200 Folsom St | Mc Guire And Hester | tjpa sign: transit information display signs i.1-5 thru i.1-9, i.2-1 thru i.2-37 and i.3-1. (see drawings attached to pa no. 200908044093)Details
tjpa sign: transit information display signs i.1-5 thru i.1-9, i.2-1 thru i.2-37 and i.3-1. (see drawings attached to pa no. 200908044093) | |
| Aug 4, 2009 | Completed final sign-off Jan 2011 | 200 Folsom St | Mc Guire And Hester | tjpa sign: canopy bus stop id sign f1 thru f79. (see drawings attached to pa no. 200908044093)Details
tjpa sign: canopy bus stop id sign f1 thru f79. (see drawings attached to pa no. 200908044093) | |
| Aug 4, 2009 | Completed final sign-off Jun 2011 | 200 Folsom St | Mc Guire And Hester | tjpa sign: street bus stop id signs g1 thru g11. (see drawings attached to pa no. 200908044093)Details
tjpa sign: street bus stop id signs g1 thru g11. (see drawings attached to pa no. 200908044093) | |
| Aug 4, 2009 | Completed final sign-off Jun 2011 | 200 Folsom St | Mc Guire And Hester | tjpa sign: portal signs b1 thru b3. (see drawings attached to pa no. 200908044093)Details
tjpa sign: portal signs b1 thru b3. (see drawings attached to pa no. 200908044093) | |
| Aug 4, 2009 | Completed final sign-off Jun 2011 | 200 Folsom St | Mc Guire And Hester | tjpa sign: primary site id sign a1 thru a3. (see attached drawings)Details
tjpa sign: primary site id sign a1 thru a3. (see attached drawings) | $297,500 |
| Aug 4, 2009 | Completed final sign-off Jan 2011 | 200 Folsom St | Mc Guire And Hester | tjpa sign: primary directional/kiosk signs d-1 thru d-13. (see drawings attached to pa no. 200908044093)Details
tjpa sign: primary directional/kiosk signs d-1 thru d-13. (see drawings attached to pa no. 200908044093) | |
| Mar 24, 2009 | Completed final sign-off Jun 2011 | 200 Folsom St | R L H Fire Protection Inc | install approx 100' of 6" ductile iron underground fire main, new meter and over head fire sprinkler system(175 heads). the outside canopy-umbrella over hangs are required to be sprinklered under separate permit.Details
install approx 100' of 6" ductile iron underground fire main, new meter and over head fire sprinkler system(175 heads). the outside canopy-umbrella over hangs are required to be sprinklered under separate permit. | $35,000 |
| Dec 21, 2007 | Completed final sign-off Jun 2011 | 200 Folsom St | grading. site improvements including site civil/mechanical, utilities, site electrical utilities; site work for modular bldg., canopies & landscaping and attendant improvements beneath east loop.Details
grading. site improvements including site civil/mechanical, utilities, site electrical utilities; site work for modular bldg., canopies & landscaping and attendant improvements beneath east loop. | $1,600,000 | |
| Dec 21, 2007 | Completed final sign-off Jun 2010 | 200 Main St | new one story security office at temporary transbay terminal.Details
new one story security office at temporary transbay terminal. | $90,000 | |
| Sep 8, 2000 | Expired or cancelled expired Jan 2001 | 250 Main St | sidewalk repairDetails
sidewalk repair |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Mc Guire And Hester (8), K A Construction (2), Barker-O'donoghue Master Bldrs, R L H Fire Protection Inc
- Architects
- Jacobs (8), Kennerly Architecture & Planni (2), Solomon Cordwell Buenz (2), Wenda Wang
- Engineers
- Jeffrey Reder, Steve Kang