Block 3704, lot 240
945 Market St
- City’s use
- Commercial Retail
- Built
- 2017
- Stories
- 6
- Units
- 7
- Building
- 368,488 sq ft
- Lot
- 46,062 sq ft
- Zoning
- C3R
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
96 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 5, 2025 | In progress issued Aug 2025 | 945 Market St | Siemens Industry, Inc. | 4/f: fire only work for the event center on floor 4 done under 202504073865; additions are 9 smoke detectors, 1 heat detector, 2 modules, 9 speaker/strobes, and 6 strobes.Details
4/f: fire only work for the event center on floor 4 done under 202504073865; additions are 9 smoke detectors, 1 heat detector, 2 modules, 9 speaker/strobes, and 6 strobes. | $20,780 |
| Jul 22, 2025 | Completed final sign-off Aug 2026 | 945 Market St | Davis Sign Co Inc | new double sided electrical blade sign facing street 6 inch deep for "parking" for sign a. 36 in x 418 in .Details
new double sided electrical blade sign facing street 6 inch deep for "parking" for sign a. 36 in x 418 in . | $44,000 |
| Jul 16, 2025 | Completed final sign-off Aug 2025 | 945 Market St | Anderson, Rowe & Buckley, Inc. | existing fire sprinklers system t.i.: 3 added upright sprinklers. 8 added pendent sprinkler. ref pa#202504073865Details
existing fire sprinklers system t.i.: 3 added upright sprinklers. 8 added pendent sprinkler. ref pa#202504073865 | $7,000 |
| Apr 7, 2025 | Completed final sign-off Oct 2025 | 945 Market St | Skyline Construction | 4/f: first time tenant improvement of event space with dedicated restrooms provided from teh adjacent corridor. existing structural framing provides code compliant support per (e) 2022 cbc 502a.4 for a-2 occupancy. no change to foundation and no structural scope under this permit.Details
4/f: first time tenant improvement of event space with dedicated restrooms provided from teh adjacent corridor. existing structural framing provides code compliant support per (e) 2022 cbc 502a.4 for a-2 occupancy. no change to foundation and no structural scope under this permit. | $1,260,000 |
| Oct 24, 2024 | Completed final sign-off Oct 2024 | 945 Market St | Siemens Industry, Inc. | fire only work to obtain another as built permit for the "ikea" remodels. this set of plans corrects heat and smoke detector locations on both the basement and floor 2 ref pa 202309287564Details
fire only work to obtain another as built permit for the "ikea" remodels. this set of plans corrects heat and smoke detector locations on both the basement and floor 2 ref pa 202309287564 | |
| Sep 5, 2024 | Completed final sign-off Oct 2024 | 945 Market St | Siemens Industry, Inc. | removed 10 per cbc 1009.8 and relocate 5 at common passenger elevator lobby. fire only work to relocate 5 existing 2 way comm call stations on 5 levels. no reference app associatedvDetails
removed 10 per cbc 1009.8 and relocate 5 at common passenger elevator lobby. fire only work to relocate 5 existing 2 way comm call stations on 5 levels. no reference app associatedv | $5,610 |
| Aug 27, 2024 | Completed final sign-off Sep 2024 | 945 Market St | Siemens Industry, Inc. | 5th fl - fire only work to obtain an "as built" permit for the "industrious" remodel. actual installation added 19 audible/visual devices, 4 smoke detectors and 3 modules ref pa 202307212665Details
5th fl - fire only work to obtain an "as built" permit for the "industrious" remodel. actual installation added 19 audible/visual devices, 4 smoke detectors and 3 modules ref pa 202307212665 | $22,943 |
| Jul 23, 2024 | Completed final sign-off Oct 2024 | 945 Market St | Siemens Industry, Inc. | 1st fl - fire alarm "as built" submission for permit; drawings reflect an updated/corrected sequence of operation. initial fire alarm ref pa 202312132482Details
1st fl - fire alarm "as built" submission for permit; drawings reflect an updated/corrected sequence of operation. initial fire alarm ref pa 202312132482 | |
| Jul 18, 2024 | Completed final sign-off Sep 2024 | 945 Market St | Siemens Industry, Inc. | 1/f: fire only work to obtain an as-built permit. drawings reflect the final sequence of operation only, no new devices. ref initial fire alarm permit 202212057698Details
1/f: fire only work to obtain an as-built permit. drawings reflect the final sequence of operation only, no new devices. ref initial fire alarm permit 202212057698 | |
| Jul 5, 2024 | Expired or cancelled cancelled Oct 2024 | 945 Market St | Siemens Industry, Inc. | fire alarm "as builts" submission for permit; the only revision is an updated sequence of operation matrix with corrections initial fire alarm permit ref 202312132482Details
fire alarm "as builts" submission for permit; the only revision is an updated sequence of operation matrix with corrections initial fire alarm permit ref 202312132482 | |
| Mar 19, 2024 | Completed final sign-off Dec 2024 | 945 Market St | Siemens Industry, Inc. | 1st fl - fire only work to obtain a 3rd as built permit for sequence of operation revisions on the "ikea" remodels per sffd plan check ref pa 202112204753Details
1st fl - fire only work to obtain a 3rd as built permit for sequence of operation revisions on the "ikea" remodels per sffd plan check ref pa 202112204753 | |
| Mar 18, 2024 | Completed final sign-off Feb 2025 | 945 Market St | Skyline Construction | rev to pa# 2022-1006-3846 revisions include updated existing soffit and soffit detailsDetails
rev to pa# 2022-1006-3846 revisions include updated existing soffit and soffit details | |
| Mar 12, 2024 | Completed final sign-off Feb 2025 | 945 Market St | Skyline Construction | rev to pa# 2021-1220-4753, 202206106079,202308245149,20220610682 addition of truncated dome 1 strips to parking levels b2 and b3. switch of emergency power from passenger elevator 4 to passenger elevator 3Details
rev to pa# 2021-1220-4753, 202206106079,202308245149,20220610682 addition of truncated dome 1 strips to parking levels b2 and b3. switch of emergency power from passenger elevator 4 to passenger elevator 3 | $48,000 |
| Mar 4, 2024 | Completed final sign-off Feb 2025 | 945 Market St | Skyline Construction | rev to pa# 2022-0415-2340 architectural added a screen aroung floor opening at second level, mechanical: removal of fsd's on 5th level. electrical: relocated electrical equipment on second level and added exhaust fan at electrical equipment platform sencond level plumbing added fl drain and hoseDetails
rev to pa# 2022-0415-2340 architectural added a screen aroung floor opening at second level, mechanical: removal of fsd's on 5th level. electrical: relocated electrical equipment on second level and added exhaust fan at electrical equipment platform sencond level plumbing added fl drain and hose | |
| Feb 27, 2024 | Completed final sign-off Sep 2024 | 945 Market St | Insign Electric | install illuminated "city" sign c located at 2nd story mounted to floor w/concrete anchors next to (e) "ikea" sign facing front of street windowDetails
install illuminated "city" sign c located at 2nd story mounted to floor w/concrete anchors next to (e) "ikea" sign facing front of street window | |
| Feb 14, 2024 | In progress issued Mar 2024 | 945 Market St | install electric, single faced, door/window sign "sal uh all" inside bldg facing st.Details
install electric, single faced, door/window sign "sal uh all" inside bldg facing st. | $11,961 | |
| Feb 13, 2024 | Completed final sign-off Feb 2024 | 945 Market St | Golden Gate Fire Protection Inc | ref 202210063846 ti and 202309227208 as built - add (4) pendent, sprinklers on the 1st and 2nd floor. add (9) pendant sprinklers on the 2nd floor for hood soffitsDetails
ref 202210063846 ti and 202309227208 as built - add (4) pendent, sprinklers on the 1st and 2nd floor. add (9) pendant sprinklers on the 2nd floor for hood soffits | $1,000 |
| Feb 9, 2024 | Completed final sign-off Feb 2025 | 945 Market St | Willow Glen Electric Inc, A S F Electric Inc | installing 3 electric vehicle charging stations. includes replacing one existing and installing 2 new.Details
installing 3 electric vehicle charging stations. includes replacing one existing and installing 2 new. | $72,088 |
| Feb 6, 2024 | Completed final sign-off Feb 2025 | 945 Market St | Skyline Construction | revision to 202204152340. add a gyp bd ceiling above the food service areas at soft serve and bakery ground level and at cooking schoolDetails
revision to 202204152340. add a gyp bd ceiling above the food service areas at soft serve and bakery ground level and at cooking school | |
| Jan 30, 2024 | Completed final sign-off Sep 2024 | 945 Market St | Siemens Industry, Inc. | fire only work to replace 6 smoke detectors in janitor closets on the basement level and floors 1-5 with heat detectors. no reference permitDetails
fire only work to replace 6 smoke detectors in janitor closets on the basement level and floors 1-5 with heat detectors. no reference permit | $4,320 |
| Jan 26, 2024 | Completed final sign-off Feb 2024 | 945 Market St | Edison Fire Extinguisher Company Inc | installation of new hood and duct fire suppression system. ref 202204152340Details
installation of new hood and duct fire suppression system. ref 202204152340 | $9,750 |
| Jan 11, 2024 | Completed final sign-off Feb 2025 | 945 Market St | Skyline Construction | renew permit# 201805017929 for final.Details
renew permit# 201805017929 for final. | |
| Jan 4, 2024 | Completed final sign-off Sep 2024 | 945 Market St | Integrated Sign Installations Inc | install (4) non-illuminated banners onto (e) supprts non-electric projecting double facedDetails
install (4) non-illuminated banners onto (e) supprts non-electric projecting double faced | $12,000 |
| Jan 4, 2024 | Completed final sign-off Oct 2024 | 945 Market St | Integrated Sign Installations Inc | install (1) illuminated electric single faced wall signDetails
install (1) illuminated electric single faced wall sign | $4,500 |
| Jan 4, 2024 | Completed final sign-off Sep 2024 | 945 Market St | Integrated Sign Installations Inc | install (1) single face non electric vinyl wall signDetails
install (1) single face non electric vinyl wall sign | $1,000 |
| Dec 19, 2023 | Completed final sign-off Apr 2025 | 945 Market St | Martin Sign Co Inc. | fabricate and install 7 evac map signs, floor 1 and 2Details
fabricate and install 7 evac map signs, floor 1 and 2 | $1,250 |
| Dec 13, 2023 | Completed final sign-off Oct 2024 | 945 Market St | Siemens Industry, Inc. | fire alarm work for sallihall: additions of 4 strobe power supplies, 1 annunciator, 50 smoke detectors, 26 heat detectors, 19 duct detectors, 34 modules, 85 speaker/strobes and 7 strobes. ref t.i. pa 202204152340.Details
fire alarm work for sallihall: additions of 4 strobe power supplies, 1 annunciator, 50 smoke detectors, 26 heat detectors, 19 duct detectors, 34 modules, 85 speaker/strobes and 7 strobes. ref t.i. pa 202204152340. | $238,300 |
| Dec 11, 2023 | Completed final sign-off Jan 2024 | 945 Market St | Golden Gate Fire Protection Inc | as-built to permit # 202309076042. add (5) pendent sprinklers on the 3rd floor. add (1) pendent on the 1st floor. t.i. ref# 202112204753Details
as-built to permit # 202309076042. add (5) pendent sprinklers on the 3rd floor. add (1) pendent on the 1st floor. t.i. ref# 202112204753 | $1,000 |
| Dec 1, 2023 | In progress issued Dec 2023 | 945 Market St | Everon Llc | install of cellular sole path communicator, to (e) approved fire alarm system in (e) commercial retail spaceDetails
install of cellular sole path communicator, to (e) approved fire alarm system in (e) commercial retail space | $4,638 |
| Nov 28, 2023 | Expired or cancelled withdrawn Feb 2024 | 945 Market St | Edison Fire Extinguisher Company Inc | installation of duct fire supression system inside the hood.Details
installation of duct fire supression system inside the hood. | $9,750 |
| Oct 17, 2023 | In progress filed Oct 2023, not yet issued | 945 Market St | Gentec Services Inc | installation of two level 2 evcs and one level 3 evcs along with a new 40a, 208v circuit & relocation of existing 100a, 480v circuit.Details
installation of two level 2 evcs and one level 3 evcs along with a new 40a, 208v circuit & relocation of existing 100a, 480v circuit. | $72,088 |
| Oct 12, 2023 | In progress issued Nov 2023 | 945 Market St | Skyline Construction | rev to pa# 2022-0610-6079 revised d.a. checklist to document auto assist exterior doorDetails
rev to pa# 2022-0610-6079 revised d.a. checklist to document auto assist exterior door | |
| Oct 11, 2023 | Completed final sign-off Feb 2025 | 945 Market St | Skyline Construction | revision to 202204152340. revised d.a checklist to document auto assist exterior door and include exterior mechanical louvers at stevenson street exterior elevation.Details
revision to 202204152340. revised d.a checklist to document auto assist exterior door and include exterior mechanical louvers at stevenson street exterior elevation. | |
| Sep 28, 2023 | Completed final sign-off Dec 2024 | 945 Market St | Siemens Industry, Inc. | 1,2 & 4th floors - fire only work to obtain a second as built permit for the "ikiea" remodels; the revisions reflect changes done to match the final installation. ref pa 202112204753Details
1,2 & 4th floors - fire only work to obtain a second as built permit for the "ikiea" remodels; the revisions reflect changes done to match the final installation. ref pa 202112204753 | |
| Sep 26, 2023 | Completed final sign-off Feb 2025 | 945 Market St | Skyline Construction | revision 202210063846 to document approved assembly loads for cafe lounge #5000 & training #5110 on 5th floor.Details
revision 202210063846 to document approved assembly loads for cafe lounge #5000 & training #5110 on 5th floor. | |
| Sep 22, 2023 | Completed final sign-off Feb 2024 | 945 Market St | Golden Gate Fire Protection Inc | add 71 pendent sprinkler and 62 uprights on the 1st fl .add 5 dry pendent sprinkler. add 117 pendent sprinklers and 38 uprights on 2nd fl. hydralic calcs included. ref 202204152340Details
add 71 pendent sprinkler and 62 uprights on the 1st fl .add 5 dry pendent sprinkler. add 117 pendent sprinklers and 38 uprights on 2nd fl. hydralic calcs included. ref 202204152340 | $191,100 |
| Sep 18, 2023 | Completed final sign-off Jan 2024 | 945 Market St | Golden Gate Fire Protection Inc | basement: remove 1 upright and 1 pendent sprinkler over the main electrical feed to the building. no underground.Details
basement: remove 1 upright and 1 pendent sprinkler over the main electrical feed to the building. no underground. | $5,000 |
| Sep 11, 2023 | Completed final sign-off Dec 2023 | 945 Market St | Golden Gate Fire Protection Inc | relocate 230 pendent sprinklers and 249 uprights on the 5th fl. 202210063846, 202307212665Details
relocate 230 pendent sprinklers and 249 uprights on the 5th fl. 202210063846, 202307212665 | $300,000 |
| Sep 7, 2023 | Completed final sign-off Jan 2024 | 945 Market St | Golden Gate Fire Protection Inc | relocate 6 pendent sprinklers, add 4 uprights and relocate 1 upright. relocate 3 pendent sprinklers on the 2nd fl. relocate 3 pendent sprinklers on the 4th fl. relocate 3 pendent sprinklers on the 5th fl. ti ref 202112204753.Details
relocate 6 pendent sprinklers, add 4 uprights and relocate 1 upright. relocate 3 pendent sprinklers on the 2nd fl. relocate 3 pendent sprinklers on the 4th fl. relocate 3 pendent sprinklers on the 5th fl. ti ref 202112204753. | $11,875 |
| Aug 24, 2023 | Completed final sign-off Feb 2025 | 945 Market St | Skyline Construction | updating passenger elevator#4 to be in code compliance as an accessible means of egress elevator and minor modifications to ikea space.Details
updating passenger elevator#4 to be in code compliance as an accessible means of egress elevator and minor modifications to ikea space. | $250,000 |
| Jul 21, 2023 | Completed final sign-off Sep 2024 | 945 Market St | Siemens Industry, Inc. | 5/f industrious remodel. additions are a remote fire pane, 4 strobe power supplies, 3 modules, 8 speakers and 195 speaker/strobes. ref pa 202210063846.Details
5/f industrious remodel. additions are a remote fire pane, 4 strobe power supplies, 3 modules, 8 speakers and 195 speaker/strobes. ref pa 202210063846. | $224,335 |
| Jul 14, 2023 | Never finaled issued Jul 2023, no final | 945 Market St | Siemens Industry, Inc. | as-bult fire alarm plans for basement level and floors 1, 2 and 4. ref pa 202112204753. rev are added 22 smoke detectors, 2 heat detectors, 5 duct detectors and 11 less modules.Details
as-bult fire alarm plans for basement level and floors 1, 2 and 4. ref pa 202112204753. rev are added 22 smoke detectors, 2 heat detectors, 5 duct detectors and 11 less modules. | $24,075 |
| Jun 29, 2023 | Completed final sign-off Aug 2023 | 945 Market St | Skyline Construction | rev to pa202206106079 to document approved assembly loads missed by sffd.Details
rev to pa202206106079 to document approved assembly loads missed by sffd. | |
| Jun 1, 2023 | Completed final sign-off Sep 2024 | 945 Market St | Insign Electric | 1-illuminated, single faced interior door/window sign "ikea". visible from street.Details
1-illuminated, single faced interior door/window sign "ikea". visible from street. | $5,000 |
| May 30, 2023 | Completed final sign-off Jan 2024 | 945 Market St | Siemens Industry, Inc. | fire only work for the atrium remodel levels 1-5, additions are 3 smoke detectors, 3 duct detectors, 6 modules, 3 speaker strobes, as well as the relocation of 14 smoke detectors and 6 speaker strobes. ref 202112204753Details
fire only work for the atrium remodel levels 1-5, additions are 3 smoke detectors, 3 duct detectors, 6 modules, 3 speaker strobes, as well as the relocation of 14 smoke detectors and 6 speaker strobes. ref 202112204753 | $16,680 |
| May 9, 2023 | Completed final sign-off Oct 2023 | 945 Market St | Integrated Sign Installations Inc | 4-non electric projecting double-faced sign "ikea"Details
4-non electric projecting double-faced sign "ikea" | $8,000 |
| May 4, 2023 | Completed final sign-off Jul 2023 | 945 Market St | Skyline Construction | construction of a temporary ramp in the loading dock of the building. ref#: 202206106079Details
construction of a temporary ramp in the loading dock of the building. ref#: 202206106079 | $35,000 |
| Apr 19, 2023 | Never finaled issued Apr 2023, no final | 945 Market St | Martin Sign Co Inc. | fabrication and installation of 30 evacuation maps for levels b,1,2,4.Details
fabrication and installation of 30 evacuation maps for levels b,1,2,4. | $7,605 |
| Mar 21, 2023 | Completed final sign-off Sep 2024 | 945 Market St | Insign Electric | interior signs: install (4) electric double-faced signs hanging 6' from ceiling on multiple floors: "ikea" (b/m=1, g/f=1, 2/f=2). 3.5 x 1.5 4" thick 95lbs.Details
interior signs: install (4) electric double-faced signs hanging 6' from ceiling on multiple floors: "ikea" (b/m=1, g/f=1, 2/f=2). 3.5 x 1.5 4" thick 95lbs. | $20,000 |
| Mar 21, 2023 | Completed final sign-off Sep 2024 | 945 Market St | Insign Electric | 2/f interior sign standing: install one electric single faced sign mounted on the floor with concrete anchors: "ikea" 14'6" x 9'7" 6" thick 400lbs.Details
2/f interior sign standing: install one electric single faced sign mounted on the floor with concrete anchors: "ikea" 14'6" x 9'7" 6" thick 400lbs. | $10,000 |
| Dec 5, 2022 | Completed final sign-off Oct 2024 | 945 Market St | Siemens Industry, Inc. | add a remote panel and devices for the ikea remodels on the basement level and floors 1,2,4 and the roof. ref pa 202112204753.Details
add a remote panel and devices for the ikea remodels on the basement level and floors 1,2,4 and the roof. ref pa 202112204753. | $330,000 |
| Oct 18, 2022 | Completed final sign-off Sep 2024 | 945 Market St | Superior Installation Services | installation of 8' pallet racks into an already existing building for storage.Details
installation of 8' pallet racks into an already existing building for storage. | $60,000 |
| Oct 11, 2022 | Completed final sign-off Feb 2025 | 945 Market St | Skyline Construction | administrative review of amended smoke control report. no work under this permit.Details
administrative review of amended smoke control report. no work under this permit. | |
| Oct 6, 2022 | Completed final sign-off Feb 2025 | 945 Market St | Skyline Construction | first generation tenant improvement. new interior partitions, finishes and fixtures. new electrical and lighting systems. new mechanical systems and controls. new toilet plumbing and fixtures. new storefront and millwork. no structural work.Details
first generation tenant improvement. new interior partitions, finishes and fixtures. new electrical and lighting systems. new mechanical systems and controls. new toilet plumbing and fixtures. new storefront and millwork. no structural work. | $12,235,000 |
| Sep 26, 2022 | Completed final sign-off Aug 2023 | 945 Market St | Pioneer Fire Inc. | relocate sprinklers to accommodate new build out. ref pa 2022-0202-7170Details
relocate sprinklers to accommodate new build out. ref pa 2022-0202-7170 | $46,000 |
| Jun 10, 2022 | Completed final sign-off Feb 2025 | 945 Market St | Skyline Construction | 2021/1220/revision to pa# 202112204753 & pa# 202202027170. scope of work includes revised egress path, revision to mep sheets & to add food service, please see memorandum attached to form 3 for details. ** maher: n/a **Details
2021/1220/revision to pa# 202112204753 & pa# 202202027170. scope of work includes revised egress path, revision to mep sheets & to add food service, please see memorandum attached to form 3 for details. ** maher: n/a ** | $775,996 |
| Jun 10, 2022 | Completed final sign-off Feb 2025 | 945 Market St | Skyline Construction | exterior scope of work: new windows on level 4 along stevenson. interior scope of work: new structural pedestrian bridge at level 2; non-structual partions; door updates; lighting upgrades; architectural finish refresh; accessibility upgrades; signage updates.Details
exterior scope of work: new windows on level 4 along stevenson. interior scope of work: new structural pedestrian bridge at level 2; non-structual partions; door updates; lighting upgrades; architectural finish refresh; accessibility upgrades; signage updates. | $10,600,000 |
| Apr 15, 2022 | Completed final sign-off Feb 2025 | 945 Market St | Skyline Construction | interior fit out to existing space on levels one (l1) and two (l2) including a dining hall (a-2) assembly associated with commericial kitchen and other support areas and cooking school on l2 (b-business). structural, mep and food service included.Details
interior fit out to existing space on levels one (l1) and two (l2) including a dining hall (a-2) assembly associated with commericial kitchen and other support areas and cooking school on l2 (b-business). structural, mep and food service included. | $1,200,000 |
| Mar 9, 2022 | Completed final sign-off Feb 2025 | 945 Market St | Skyline Construction | complete eval.& detailed design of the strengthening required for gravity & lateral framing members for levels b1,level 1 & level 2 for an increased live load of 100 psf. developing necessary member & connection strengthening to achieve the desired load. bldg currently unoccupied.Details
complete eval.& detailed design of the strengthening required for gravity & lateral framing members for levels b1,level 1 & level 2 for an increased live load of 100 psf. developing necessary member & connection strengthening to achieve the desired load. bldg currently unoccupied. | $485,000 |
| Mar 1, 2022 | Expired or cancelled withdrawn Sep 2023 | 945 Market St | Skyline Construction | remodel fire sprinkler system as necessary for core and shell alterations to existing retail space. no change of occupancy.Details
remodel fire sprinkler system as necessary for core and shell alterations to existing retail space. no change of occupancy. | $350,000 |
| Mar 1, 2022 | Expired or cancelled withdrawn Sep 2023 | 945 Market St | Skyline Construction | provide an extension of the existing siemens firefinder xls building, fire alarm system throughout the ikea tenant space as a node on the system in accordance with all nfpa standards and all loca adopted codes as indicated in the plans and specifications.Details
provide an extension of the existing siemens firefinder xls building, fire alarm system throughout the ikea tenant space as a node on the system in accordance with all nfpa standards and all loca adopted codes as indicated in the plans and specifications. | $425,000 |
| Feb 2, 2022 | Completed final sign-off Feb 2025 | 945 Market St | Skyline Construction | deferred mep for bpa #202112204753; revised arch & structural from bpa #202112204753. to update mechanical equipment background.Details
deferred mep for bpa #202112204753; revised arch & structural from bpa #202112204753. to update mechanical equipment background. | $5,500,000 |
| Dec 20, 2021 | Completed final sign-off Feb 2025 | 945 Market St | Skyline Construction | core and shell alteration to (e) retail space inclduing service lifts, stairs, restrooms, entry door @ exterior/ramp, interior wall/interior store front/interior doors & limited interior walls/overhead doors where structural framing is req'd. no change of occupancy.Details
core and shell alteration to (e) retail space inclduing service lifts, stairs, restrooms, entry door @ exterior/ramp, interior wall/interior store front/interior doors & limited interior walls/overhead doors where structural framing is req'd. no change of occupancy. | $1,100,000 |
| May 1, 2018 | Expired or cancelled expired Feb 2025 | 945 Market St | administrative permit to memorialize planning commission motions 20136 & 20137 authorizing 47,522 sqft of office use to be flexibly configured at the 4th & 5th floor under future y/i. permit is being issued to finalize plannning approval and enable payment of impact fees. no construction under thisDetails
administrative permit to memorialize planning commission motions 20136 & 20137 authorizing 47,522 sqft of office use to be flexibly configured at the 4th & 5th floor under future y/i. permit is being issued to finalize plannning approval and enable payment of impact fees. no construction under this | ||
| Mar 14, 2017 | Expired or cancelled cancelled Jan 2026 | 945 Market St | Martin Sign Co Inc. | non-structural interior graphic sign. n/a for maherDetails
non-structural interior graphic sign. n/a for maher | $2,500 |
| Feb 8, 2017 | Completed final sign-off Mar 2017 | 945 Market St | Siemens Industry, Inc. | as built per the request of the sffd plan check dept. as noted on the approved permit plans for the project. added parts difference is 29 modules. ref 201011084497 (s7) maher naDetails
as built per the request of the sffd plan check dept. as noted on the approved permit plans for the project. added parts difference is 29 modules. ref 201011084497 (s7) maher na | $5,800 |
| Jan 31, 2017 | Completed final sign-off Mar 2017 | 945 Market St | Plant Construction Co, Lp | revision to 201011084497 s3/r1. revised smoke control report. installation of operable glass covers for ventilation and smoke control on 1st flr and 14 louvers on 6th flr penthouse. maher naDetails
revision to 201011084497 s3/r1. revised smoke control report. installation of operable glass covers for ventilation and smoke control on 1st flr and 14 louvers on 6th flr penthouse. maher na | $1,000 |
| Jan 3, 2017 | Completed final sign-off Mar 2017 | 945 Market St | Plant Construction Co, Lp | ref pa#201011084497 s8: as-built for rooftop generator & fuel oil. to provide additional information /specifications. maher n/a.Details
ref pa#201011084497 s8: as-built for rooftop generator & fuel oil. to provide additional information /specifications. maher n/a. | |
| Dec 20, 2016 | Never finaled issued Dec 2016, no final | 945 Market St | street spaceDetails
street space | ||
| Nov 16, 2016 | Never finaled issued Nov 2016, no final | 945 Market St | street space permitDetails
street space permit | ||
| Sep 22, 2016 | Completed final sign-off Mar 2017 | 945 Market St | Thomas Swan Sign Co Inc | b1,b2,b3,1,2,3,4,5 floors: 58 evac plan maps maher naDetails
b1,b2,b3,1,2,3,4,5 floors: 58 evac plan maps maher na | $23,200 |
| Sep 21, 2016 | Never finaled issued Sep 2016, no final | 945 Market St | street spaceDetails
street space | ||
| Jun 29, 2016 | Never finaled issued Jul 2016, no final | 945 Market St | Thomas Swan Sign Co Inc | 2 non electric, non illuminated printed signs. ref #201606291149. n/a ordinance #155-13Details
2 non electric, non illuminated printed signs. ref #201606291149. n/a ordinance #155-13 | $5,000 |
| Jun 29, 2016 | Completed final sign-off May 2018 | 945 Market St | Thomas Swan Sign Co Inc | installation of 8 vertical sign bands for future retail spaces, direct illumiination. n/a ordinance #155-13Details
installation of 8 vertical sign bands for future retail spaces, direct illumiination. n/a ordinance #155-13 | $40,000 |
| Jun 15, 2016 | Never finaled issued Jun 2016, no final | 945 Market St | Thomas Swan Sign Co Inc | to erect non-electrical direction wall signs. n/a for maherDetails
to erect non-electrical direction wall signs. n/a for maher | $5,000 |
| Jun 15, 2016 | Never finaled issued Jun 2016, no final | 945 Market St | Thomas Swan Sign Co Inc | to erect 1 electric projecting sign. n/a for maherDetails
to erect 1 electric projecting sign. n/a for maher | $2,000 |
| Jun 15, 2016 | Never finaled issued Jun 2016, no final | 945 Market St | Thomas Swan Sign Co Inc | to erect 1 electric wall signs. n/a for maherDetails
to erect 1 electric wall signs. n/a for maher | $10,000 |
| Jun 15, 2016 | Never finaled issued Jun 2016, no final | 945 Market St | Thomas Swan Sign Co Inc | to erect 3 electric wall signs. n/a for maherDetails
to erect 3 electric wall signs. n/a for maher | $10,000 |
| Jun 8, 2016 | Completed final sign-off Dec 2016 | 945 Market St | Swinerton Builders | installation of beam clamps to support future art work. new bldg.pa# 201011084497. n/a ordinance #155-13Details
installation of beam clamps to support future art work. new bldg.pa# 201011084497. n/a ordinance #155-13 | $2,000 |
| May 20, 2016 | Completed final sign-off Jan 2017 | 945 Market St | Plant Construction Co, Lp | revision to ref pa 2010 1108 4497 s3: stevenson st facade eliminate the areas of refuge per cbc 1007.3 & 1007.4. change wall railing between passenger elevator & service elevator & other various cordination related modifications. maher naDetails
revision to ref pa 2010 1108 4497 s3: stevenson st facade eliminate the areas of refuge per cbc 1007.3 & 1007.4. change wall railing between passenger elevator & service elevator & other various cordination related modifications. maher na | |
| May 16, 2016 | Completed final sign-off Jan 2017 | 945 Market St | Swinerton Builders, Plant Construction Co, Lp | ground fl: revision to pa#2010-1108-4497 to make fire pump room door 60-minute fire rated. n/a ordinance #155-13Details
ground fl: revision to pa#2010-1108-4497 to make fire pump room door 60-minute fire rated. n/a ordinance #155-13 | |
| May 12, 2016 | Completed final sign-off Jan 2017 | 945 Market St | Allied Fire Protection, Plant Construction Co, Lp | structural details for fire pump room bracing & fire pump load calculations for slab pa 2016-0309-1636Details
structural details for fire pump room bracing & fire pump load calculations for slab pa 2016-0309-1636 | $2,200 |
| Apr 14, 2016 | Never finaled issued Apr 2016, no final | 945 Market St | streetspaceDetails
streetspace | ||
| Mar 9, 2016 | Completed final sign-off Mar 2017 | 945 Market St | Swinerton Builders, Plant Construction Co, Lp | revision to mech & ele services at the fire pump room. ref pa 2010 1108 4497 s3Details
revision to mech & ele services at the fire pump room. ref pa 2010 1108 4497 s3 | |
| Oct 30, 2015 | Expired or cancelled cancelled Dec 2016 | 945 Market St | Plant Construction Co, Lp | deferred permit application for cable net wall system. ref #201011084497 (s) n/a for maherDetails
deferred permit application for cable net wall system. ref #201011084497 (s) n/a for maher | |
| Oct 15, 2015 | Never finaled issued Oct 2015, no final | 945 Market St | street spaceDetails
street space | ||
| Aug 12, 2015 | Expired or cancelled withdrawn Oct 2016 | 945 Market St | Plant Construction Co, Lp | revision to 2010 1108 4497 s3; to document modification made to stevenson street facade, the (e) pg&e vault on stevenson accomodation, build out of service elevator vestibules, updated finishes, and various related detail modifications. mahaer naDetails
revision to 2010 1108 4497 s3; to document modification made to stevenson street facade, the (e) pg&e vault on stevenson accomodation, build out of service elevator vestibules, updated finishes, and various related detail modifications. mahaer na | |
| Jul 22, 2015 | Completed final sign-off Mar 2017 | 945 Market St | Plant Construction Co, Lp | revision to mechanical permit . p/a#201011084497 s-3. addition of smoke control information to plans. code references. fire fighthers smoke control panel diagram, sequence of operation, fan & damper matrix.Details
revision to mechanical permit . p/a#201011084497 s-3. addition of smoke control information to plans. code references. fire fighthers smoke control panel diagram, sequence of operation, fan & damper matrix. | $100 |
| Apr 23, 2015 | Completed final sign-off Dec 2016 | 945 Market St | Swinerton Builders, Plant Construction Co, Lp | revision to pa#201011084497 s2 to modify super structure design due to infield conditions. design evalution changes include modification to brace line, slabs for fuel tanks and mechanical equipment, elevator & escalator openings. n/a ordinance #155-13Details
revision to pa#201011084497 s2 to modify super structure design due to infield conditions. design evalution changes include modification to brace line, slabs for fuel tanks and mechanical equipment, elevator & escalator openings. n/a ordinance #155-13 | |
| Apr 17, 2015 | Never finaled issued Apr 2015, no final | 945 Market St | street space permitDetails
street space permit | ||
| Mar 19, 2015 | Completed final sign-off Dec 2016 | 945 Market St | Plant Construction Co, Lp | foundation to be constructed to support tower crane; revise previously approved bldg foundation permit to include tower crane support. maher ?Details
foundation to be constructed to support tower crane; revise previously approved bldg foundation permit to include tower crane support. maher ? | $100,000 |
| Nov 18, 2014 | Never finaled issued Jan 2015, no final | 945 Market St | Swinerton Builders | revision to pa 201011084497-s3 to include approved smoke control report only; maher n/aDetails
revision to pa 201011084497-s3 to include approved smoke control report only; maher n/a | |
| Oct 17, 2014 | Never finaled issued Oct 2014, no final | 945 Market St | street spaceDetails
street space | ||
| Mar 4, 2013 | Never finaled issued Mar 2013, no final | 945 Market St | street space renewal for m344227 for 939-961 market stDetails
street space renewal for m344227 for 939-961 market st | ||
| Feb 14, 2013 | Completed final sign-off Nov 2016 | 945 Market St | Swinerton Builders, Plant Construction Co, Lp | temporary lateral support of excavation for new construction by means of soldier beams, soil cement-mix, lagging, tie backs and internal bracing. site permit for 945 market-pa#2010-11-08-4497s.Details
temporary lateral support of excavation for new construction by means of soldier beams, soil cement-mix, lagging, tie backs and internal bracing. site permit for 945 market-pa#2010-11-08-4497s. | $45,000 |
| Feb 5, 2013 | Completed final sign-off Dec 2016 | 945 Market St | change address from 935 market street to 945 market street. refer to site permit application #2010-1108-4497/s.Details
change address from 935 market street to 945 market street. refer to site permit application #2010-1108-4497/s. |