Frank Coda
- Listed as
- architect
- Firm
- Greenberg Farrow
- Based in
- Somerville
- On San Francisco permits
- Apr 2022 to Aug 2026
6 permits since 2000 (architect on 6 permits): 3 completed, 3 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 20, 2026 | In progress issued Sep 2026 | 355 Bay Shore Bl | Merchco Services Inc | remodel of (e) retail grocery market. scope includes new and relocation of (e) retail shelving, display fixtures, and refrigeration equipment.Details
remodel of (e) retail grocery market. scope includes new and relocation of (e) retail shelving, display fixtures, and refrigeration equipment. | $200,000 |
| Jun 22, 2026 | In progress filed Jun 2026, not yet issued | 2630 Bay Shore Bl | remodel (e) retail grocery market. scope includes installation of new and relocation of (e)retail shelving display fixtures and refrigeration equipment.Details
remodel (e) retail grocery market. scope includes installation of new and relocation of (e)retail shelving display fixtures and refrigeration equipment. | $94,000 | |
| Mar 4, 2024 | Completed final sign-off Feb 2025 | 945 Market St | Skyline Construction | rev to pa# 2022-0415-2340 architectural added a screen aroung floor opening at second level, mechanical: removal of fsd's on 5th level. electrical: relocated electrical equipment on second level and added exhaust fan at electrical equipment platform sencond level plumbing added fl drain and hoseDetails
rev to pa# 2022-0415-2340 architectural added a screen aroung floor opening at second level, mechanical: removal of fsd's on 5th level. electrical: relocated electrical equipment on second level and added exhaust fan at electrical equipment platform sencond level plumbing added fl drain and hose | |
| Feb 14, 2024 | In progress issued Mar 2024 | 945 Market St | install electric, single faced, door/window sign "sal uh all" inside bldg facing st.Details
install electric, single faced, door/window sign "sal uh all" inside bldg facing st. | $11,961 | |
| Oct 11, 2023 | Completed final sign-off Feb 2025 | 945 Market St | Skyline Construction | revision to 202204152340. revised d.a checklist to document auto assist exterior door and include exterior mechanical louvers at stevenson street exterior elevation.Details
revision to 202204152340. revised d.a checklist to document auto assist exterior door and include exterior mechanical louvers at stevenson street exterior elevation. | |
| Apr 15, 2022 | Completed final sign-off Feb 2025 | 945 Market St | Skyline Construction | interior fit out to existing space on levels one (l1) and two (l2) including a dining hall (a-2) assembly associated with commericial kitchen and other support areas and cooking school on l2 (b-business). structural, mep and food service included.Details
interior fit out to existing space on levels one (l1) and two (l2) including a dining hall (a-2) assembly associated with commericial kitchen and other support areas and cooking school on l2 (b-business). structural, mep and food service included. | $1,200,000 |