Justin Elliott
- Listed as
- authorized agent-others, engineer
- Firm
- Vlmk Engineering & Design
- Based in
- Portland
- On San Francisco permits
- Dec 2013 to Aug 2026
9 permits since 2000 (engineer on 7 permits, authorized agent-others on 2 permits): 7 completed, 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 20, 2026 | In progress issued Sep 2026 | 355 Bay Shore Bl | Merchco Services Inc | remodel of (e) retail grocery market. scope includes new and relocation of (e) retail shelving, display fixtures, and refrigeration equipment.Details
remodel of (e) retail grocery market. scope includes new and relocation of (e) retail shelving, display fixtures, and refrigeration equipment. | $200,000 |
| Jun 22, 2026 | In progress filed Jun 2026, not yet issued | 2630 Bay Shore Bl | remodel (e) retail grocery market. scope includes installation of new and relocation of (e)retail shelving display fixtures and refrigeration equipment.Details
remodel (e) retail grocery market. scope includes installation of new and relocation of (e)retail shelving display fixtures and refrigeration equipment. | $94,000 | |
| Jan 14, 2026 | Completed final sign-off Sep 2026 | 350 Bay St | Tilton Pacific Const Inc. | revision to pa#202505126240. convert electric heat to gas heat. updated grab & go specfications. shifted meat, fish bunkers, and berry bin bse. suite 113 store # 610 for storefront frontwall location per field condition. updated sanitation certification per latest specs added conrete house keeping.Details
revision to pa#202505126240. convert electric heat to gas heat. updated grab & go specfications. shifted meat, fish bunkers, and berry bin bse. suite 113 store # 610 for storefront frontwall location per field condition. updated sanitation certification per latest specs added conrete house keeping. | |
| May 27, 2025 | Completed final sign-off Sep 2026 | 350 Bay St | Tilton Pacific Const Inc. | interior alteration of (e) building for a new grocery store, no change of use, prior use of building was a grocery store. no exterior work proposed under this permit.Details
interior alteration of (e) building for a new grocery store, no change of use, prior use of building was a grocery store. no exterior work proposed under this permit. | $950,000 |
| Feb 24, 2022 | Completed final sign-off Jan 2023 | 3801 03rd St | Kdc Construction | change of use. t.i. to institute retail general grocery use (formula retail): replace main entrance doors, metal stud framing interior finishes, toilet rm fixtures and finishes, office and break room, coolers and freezers, remodel stock room, lighting equipment and mech equipment & product shelvingDetails
change of use. t.i. to institute retail general grocery use (formula retail): replace main entrance doors, metal stud framing interior finishes, toilet rm fixtures and finishes, office and break room, coolers and freezers, remodel stock room, lighting equipment and mech equipment & product shelving | $850,000 |
| Feb 18, 2021 | Completed final sign-off Apr 2021 | 355 Bay Shore Bl | Tilton Pacific Const Inc. | revision to pa# 2019-1223-0345; modification to walk in cooler and refrideration, switching entrance door to surface mounted auto slider and minor fixture layout changesDetails
revision to pa# 2019-1223-0345; modification to walk in cooler and refrideration, switching entrance door to surface mounted auto slider and minor fixture layout changes | $25,000 |
| Jun 16, 2016 | Completed final sign-off Mar 2017 | 1245 South Van Ness Av | Tilton Pacific Const Inc. | t-i for new grocery story within existing building that previously house a grocery store. construction to includes new offices, refrigeration to hvac equipment to new store fixtures.Details
t-i for new grocery story within existing building that previously house a grocery store. construction to includes new offices, refrigeration to hvac equipment to new store fixtures. | $850,000 |
| Apr 21, 2015 | Completed final sign-off Jul 2017 | 350 Mission St | Hathaway Dinwiddie Co. | 10th flr: full floor ti with non baring partitions, card readers in elevator lobbies. fire alarm & sprinklers under seperate permitDetails
10th flr: full floor ti with non baring partitions, card readers in elevator lobbies. fire alarm & sprinklers under seperate permit | $2,860,746 |
| Dec 12, 2013 | Completed final sign-off Aug 2014 | 50 Fremont St | Hathaway Dinwiddie Co. | 9th full floor interior tenant improvement for single tenant. new ceiling, non-load bearing partitions. new mep. sprinklers & fire alarm on separate permits.Details
9th full floor interior tenant improvement for single tenant. new ceiling, non-load bearing partitions. new mep. sprinklers & fire alarm on separate permits. | $2,617,762 |