Caroline Fenlon-Harding
- License
- E19550
- Electrical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up E19550 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Wsp
- On San Francisco permits
- Nov 2017 to Jun 2022
8 permits since 2000 (engineer on 8 permits): 7 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Level 10 Construction Lp (5), Skyline Construction (2), Fisher Development Inc
- Architects
- Douglas Zucker (4), Anne Torney, Barry Bourbon, Jeffrey D. Heller
- Engineers
- Jeffrey Sacks (5), Jason Krolicki (2), Todd M. See (2), Blake Dilsworth, Laurie K. Johnston
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 2
- Commercial 6
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 10, 2022 | Completed final sign-off Feb 2025 | 945 Market St | Skyline Construction | exterior scope of work: new windows on level 4 along stevenson. interior scope of work: new structural pedestrian bridge at level 2; non-structual partions; door updates; lighting upgrades; architectural finish refresh; accessibility upgrades; signage updates.Details
exterior scope of work: new windows on level 4 along stevenson. interior scope of work: new structural pedestrian bridge at level 2; non-structual partions; door updates; lighting upgrades; architectural finish refresh; accessibility upgrades; signage updates. | $10,600,000 |
| Jun 9, 2021 | Completed final sign-off Dec 2021 | 199 Fremont St | Skyline Construction | demo of existing catering kitchen and gallery/seating area. proposal includes a large catering kitchen w/ additional back of house spaces, severy stations, seating and janitor closet. improvements incl non bearing partitions, ceilings and finsihes. food to be cooked off site and served out of electrDetails
demo of existing catering kitchen and gallery/seating area. proposal includes a large catering kitchen w/ additional back of house spaces, severy stations, seating and janitor closet. improvements incl non bearing partitions, ceilings and finsihes. food to be cooked off site and served out of electr | $3,000,000 |
| Jan 28, 2021 | Never finaled issued Mar 2022, no final | 1554 Market St | Fisher Development Inc | revision to issused pa# 201311222657-s3 (mep) to capture: - electrical impacts of mechanical ve items. - pg & e incoming electrical service coordination. ** maher: n/a **Details
revision to issused pa# 201311222657-s3 (mep) to capture: - electrical impacts of mechanical ve items. - pg & e incoming electrical service coordination. ** maher: n/a ** | |
| Nov 7, 2017 | Completed final sign-off May 2021 | 181 Fremont St | Level 10 Construction Lp | 27/f- construction of new structural partitions, ceilings, light fixtures, millwork & finishes, construction of pantry. n/a ordinance #155-13Details
27/f- construction of new structural partitions, ceilings, light fixtures, millwork & finishes, construction of pantry. n/a ordinance #155-13 | $1,800,000 |
| Nov 7, 2017 | Completed final sign-off May 2021 | 181 Fremont St | Level 10 Construction Lp | 28/f- construction of new structural partitions, ceilings, light fixtures, millwork & finishes. n/a ordinance #155-13Details
28/f- construction of new structural partitions, ceilings, light fixtures, millwork & finishes. n/a ordinance #155-13 | $1,540,000 |
| Nov 7, 2017 | Completed final sign-off May 2021 | 181 Fremont St | Level 10 Construction Lp | 26th floor - construction of non-structural partitions, ceiling,light fixtures, finishes. n/a maher ordinanceDetails
26th floor - construction of non-structural partitions, ceiling,light fixtures, finishes. n/a maher ordinance | $1,600,000 |
| Nov 7, 2017 | Completed final sign-off May 2021 | 181 Fremont St | Level 10 Construction Lp | 25th floor - construction of non-structural partitions, ceiling,light fixtures, finishes. construction of new convinence stairs from 25th to 26th floor. construction of new ktichen & servery. n/a maher ordinanceDetails
25th floor - construction of non-structural partitions, ceiling,light fixtures, finishes. construction of new convinence stairs from 25th to 26th floor. construction of new ktichen & servery. n/a maher ordinance | $2,100,000 |
| Nov 6, 2017 | Completed final sign-off Feb 2019 | 181 Fremont St | Level 10 Construction Lp | high-rise elevators modified to stop @ levels 13 & 25. the relocation of the women's restrm @ lvl 13. (e) transfer flr mid-rise/highrise elevator lobby 2 level 25, modified to create a transfer flr mid-rise/high-rise elevator lobby. new transfer flr mid-rise/high-rise elevator lobby created @ 13 lvlDetails
high-rise elevators modified to stop @ levels 13 & 25. the relocation of the women's restrm @ lvl 13. (e) transfer flr mid-rise/highrise elevator lobby 2 level 25, modified to create a transfer flr mid-rise/high-rise elevator lobby. new transfer flr mid-rise/high-rise elevator lobby created @ 13 lvl | $110,000 |