Jason Krolicki
- License
- S5997
- Structural engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up S5997 at the Board for Professional Engineers
- Listed as
- architect, engineer
- Firm
- Arup North America Ltd.
- Based in
- San Francisco
- On San Francisco permits
- May 2014 to Nov 2017
4 permits since 2000 (engineer on 3 permits, architect on 1 permit): 4 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Level 10 Construction Lp (3)
- Architects
- Douglas Zucker (2)
- Engineers
- Caroline Fenlon-Harding (2), Jeffrey Sacks (2)
- Pmt consultant/expediters
- Jacob Nguyen
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 2
- Other or unknown 2
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 7, 2017 | Completed final sign-off May 2021 | 181 Fremont St | Level 10 Construction Lp | 25th floor - construction of non-structural partitions, ceiling,light fixtures, finishes. construction of new convinence stairs from 25th to 26th floor. construction of new ktichen & servery. n/a maher ordinanceDetails
25th floor - construction of non-structural partitions, ceiling,light fixtures, finishes. construction of new convinence stairs from 25th to 26th floor. construction of new ktichen & servery. n/a maher ordinance | $2,100,000 |
| Nov 7, 2017 | Completed final sign-off May 2021 | 181 Fremont St | Level 10 Construction Lp | 26th floor - construction of non-structural partitions, ceiling,light fixtures, finishes. n/a maher ordinanceDetails
26th floor - construction of non-structural partitions, ceiling,light fixtures, finishes. n/a maher ordinance | $1,600,000 |
| Feb 24, 2016 | Completed final sign-off May 2022 | 100 Channel | indicator piles for future new hotel building construction. test piles per geotech recommendationDetails
indicator piles for future new hotel building construction. test piles per geotech recommendation | $75,000 | |
| May 23, 2014 | Completed final sign-off May 2018 | 181 Fremont St | Level 10 Construction Lp | revision to pa# 2013/05/01/8994 s-1. revise drill shaft with calculations. ** maher: compliance with ordinance no# 155-13 not required **Details
revision to pa# 2013/05/01/8994 s-1. revise drill shaft with calculations. ** maher: compliance with ordinance no# 155-13 not required ** |