Jacob Nguyen
- License
- 63094
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- authorized agent-others, engineer, pmt consultant/expediter
- Firm
- Bkf Engineers
- Based in
- San Jose
- On San Francisco permits
- Apr 2005 to Nov 2026
16 permits since 2000 (pmt consultant/expediter on 10 permits, authorized agent-others on 3 permits, engineer on 3 permits): 10 completed, 1 in progress, 2 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Fisher Development Inc (2), Plant Construction Co, Lp (2), Build Group Inc., Cahill Contractors Inc, Cahill Guzman Construction Group Jv, Herreroboldt Partners, Level 10 Construction Lp, Novo Construction Inc, Principal Builders Inc., Skanska Usa Building Inc, Truebeck Construction
- Architects
- Barry Bourbon, Benedict Tranel, Robert Carli Jr., Steve Rajniger, Susan Mccomb
- Engineers
- Barry Bourbon, Blake Dilsworth, Brendan Kolts, David Clifton Mar, Jason Krolicki, John Sinclair Leys, Nancy Escano, Tim Mathison, Wayne Gaw
- Designers
- J Lee Stickles
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 3
- Commercial 9
- Other or unknown 4
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 18, 2026 | In progress filed Nov 2026, not yet issued | 356 West Clarendon Rd | Cahill Guzman Construction Group Jv | to erect 6 stores, no basement, type iii-a / i-a, 159 units senior residential housing.Details
to erect 6 stores, no basement, type iii-a / i-a, 159 units senior residential housing. | $70,000,000 |
| Nov 8, 2021 | Completed final sign-off Mar 2024 | 48 Stockton St | Plant Construction Co, Lp | change of use retail to office (37,402 sf). new office entrance and service entry. new elevators, elevator lobbies, and basement level bicycle commuter facility. replacement of existing mep systems, screening and new roof system. selective interior demolition to accomodate new use.Details
change of use retail to office (37,402 sf). new office entrance and service entry. new elevators, elevator lobbies, and basement level bicycle commuter facility. replacement of existing mep systems, screening and new roof system. selective interior demolition to accomodate new use. | $15,750,000 |
| Sep 11, 2014 | Completed final sign-off Sep 2021 | 1095 Market St | Skanska Usa Building Inc, Plant Construction Co, Lp | change of occupancy from office to hotel. new 203 hotel rooms. new roof deck. add new story within (e) structure. new stairs & elevator. ** maher: compliance with ordinance no# 155-13 not required **Details
change of occupancy from office to hotel. new 203 hotel rooms. new roof deck. add new story within (e) structure. new stairs & elevator. ** maher: compliance with ordinance no# 155-13 not required ** | $9,650,000 |
| Sep 5, 2014 | Completed final sign-off Oct 2014 | 901 Market St | Fisher Development Inc | non structural interior selective demo of ti improvements of lower levels. scope restricted removing suspended ceiling and furring around columns. ara of work to remain unoccupied. separate permits for fire protection sprinkler system & arch, structural, mep for landlord work. n/a ordinance #155-13Details
non structural interior selective demo of ti improvements of lower levels. scope restricted removing suspended ceiling and furring around columns. ara of work to remain unoccupied. separate permits for fire protection sprinkler system & arch, structural, mep for landlord work. n/a ordinance #155-13 | $10,000 |
| Jul 31, 2014 | Completed final sign-off Mar 2016 | 350 Friedell St | Cahill Contractors Inc | excavation and shoring permit for site pa# 201312275134sDetails
excavation and shoring permit for site pa# 201312275134s | $100,000 |
| May 23, 2014 | Completed final sign-off Mar 2017 | 901 Market St | Fisher Development Inc | basement, 1st floor - structural & architectural upgrades a basement & 1st floor. installation of an elevator & pair of escalators between basement & 1st floor. area to remain unoccupied during work. n/a maher ordinanceDetails
basement, 1st floor - structural & architectural upgrades a basement & 1st floor. installation of an elevator & pair of escalators between basement & 1st floor. area to remain unoccupied during work. n/a maher ordinance | $900,000 |
| May 23, 2014 | Completed final sign-off May 2018 | 181 Fremont St | Level 10 Construction Lp | revision to pa# 2013/05/01/8994 s-1. revise drill shaft with calculations. ** maher: compliance with ordinance no# 155-13 not required **Details
revision to pa# 2013/05/01/8994 s-1. revise drill shaft with calculations. ** maher: compliance with ordinance no# 155-13 not required ** | |
| May 16, 2014 | Expired or cancelled cancelled Jan 2026 | 500 Terry A. Francois Bl | communication stairs between floors 3 and 4th structural only. handrail /guardrail. interior finishes and related millwork.Details
communication stairs between floors 3 and 4th structural only. handrail /guardrail. interior finishes and related millwork. | $275,000 | |
| May 14, 2014 | Expired or cancelled withdrawn Oct 2015 | 1455 Market St | Principal Builders Inc. | revision to pa#201311273003 addition of 1 card reader on double doors east of men's shower to south side of office area.Details
revision to pa#201311273003 addition of 1 card reader on double doors east of men's shower to south side of office area. | $2,000 |
| May 2, 2014 | Completed final sign-off Oct 2014 | 505 Howard St | Novo Construction Inc | mechanical only, full floor tenant improvement. architecture pa#201404244115. n/a ordinance #155-13Details
mechanical only, full floor tenant improvement. architecture pa#201404244115. n/a ordinance #155-13 | $550,000 |
| Apr 29, 2014 | Never finaled issued May 2014, no final | 218 Buchanan St | Build Group Inc. | installation of underground for sprinkler system and new hydrantDetails
installation of underground for sprinkler system and new hydrant | $80,000 |
| Apr 11, 2014 | Completed final sign-off Oct 2014 | 126 Folsom St | existing office and storage facility. new partitions, restroom upgrade. electrical on a separate permitDetails
existing office and storage facility. new partitions, restroom upgrade. electrical on a separate permit | $125,000 | |
| Mar 24, 2014 | Completed final sign-off Jan 2015 | 499 Illinois St | Truebeck Construction | (1st & 2nd floors) ti on levels 1 & 2, new lobby stairs, cafe, dining area, kitchen, training and fitness center and building common areas new restroom on level 2Details
(1st & 2nd floors) ti on levels 1 & 2, new lobby stairs, cafe, dining area, kitchen, training and fitness center and building common areas new restroom on level 2 | $7,500,000 |
| Mar 10, 2014 | Never finaled issued Mar 2014, no final | 1101 Van Ness Av | Herreroboldt Partners | revision to approved permit 2012-0702-3942. remove underground tanks on geary blvd from original scope of work. tie backs shall not extend beyond city street right of way.Details
revision to approved permit 2012-0702-3942. remove underground tanks on geary blvd from original scope of work. tie backs shall not extend beyond city street right of way. | |
| Feb 12, 2007 | Expired or cancelled expired Apr 2009 | 1500 Owens St | drive 12 indicators test piles for soil structural testing. reference pa# 200611298694s.Details
drive 12 indicators test piles for soil structural testing. reference pa# 200611298694s. | $25,000 | |
| Apr 18, 2005 | Completed final sign-off Oct 2007 | 325 Berry St | to erect 7 stories 110 dwelling residential units.Details
to erect 7 stories 110 dwelling residential units. | $23,750,000 |