Nancy Escano
- License
- C22219
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C22219 at the Board for Professional Engineers
- Listed as
- architect, engineer
- Based in
- Sandiego
- On San Francisco permits
- Dec 2013 to Jan 2020
7 permits since 2000 (architect on 6 permits, engineer on 1 permit): 6 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Truebeck Construction (5), Turner Construction Co (2)
- Architects
- Eric Ibsen, Roderick Wyllie
- Engineers
- Bruce Anderson, Michael Neal
- Pmt consultant/expediters
- Jacob Nguyen
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 7
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 16, 2020 | Never finaled issued Aug 2020, no final | 409 Illinois St | Truebeck Construction | replace pavers and add bar which will be operated by (e) restaurant; stem pation new bar area east side of patio. slab podium landscapingDetails
replace pavers and add bar which will be operated by (e) restaurant; stem pation new bar area east side of patio. slab podium landscaping | $800,000 |
| Jun 21, 2016 | Completed final sign-off Aug 2016 | 499 Illinois St | Turner Construction Co | revision to 2016-0310-1744 reduction in scope - removal of all previously noted changes to room 2-3060 and 2-3056 and 2-3058. all rooms noted are to remain as (e). no change. maher naDetails
revision to 2016-0310-1744 reduction in scope - removal of all previously noted changes to room 2-3060 and 2-3056 and 2-3058. all rooms noted are to remain as (e). no change. maher na | |
| Mar 10, 2016 | Completed final sign-off Aug 2016 | 499 Illinois St | Turner Construction Co | minor upgrades to lab/office areas which include hvac and elec. no changes to walls or control areas. finish flooring changes for a few labs. tenant moving from 4th to 3rd floor. ** maher: n/a **Details
minor upgrades to lab/office areas which include hvac and elec. no changes to walls or control areas. finish flooring changes for a few labs. tenant moving from 4th to 3rd floor. ** maher: n/a ** | $130,000 |
| Jun 27, 2014 | Completed final sign-off Dec 2014 | 499 Illinois St | Truebeck Construction | revision to appl #2013.1220.4739: room 2-4040 divided into multiple rooms. those rooms to be 2 x res + devel & 3 x offices. minor wall + door alterations to hallways 2-4040, 2-4043, 2-4037, 2-4035, 2-4033 + accomodate egress + secuitry, mep work.Details
revision to appl #2013.1220.4739: room 2-4040 divided into multiple rooms. those rooms to be 2 x res + devel & 3 x offices. minor wall + door alterations to hallways 2-4040, 2-4043, 2-4037, 2-4035, 2-4033 + accomodate egress + secuitry, mep work. | $113,230 |
| Jun 18, 2014 | Completed final sign-off Dec 2014 | 499 Illinois St | Truebeck Construction | revision to app#201312204739. change amount of rooms on floors 3 and 4. reconfigure mep work to for new configuration. all room functions to remain same as original layout.Details
revision to app#201312204739. change amount of rooms on floors 3 and 4. reconfigure mep work to for new configuration. all room functions to remain same as original layout. | $37,618 |
| Mar 24, 2014 | Completed final sign-off Jan 2015 | 499 Illinois St | Truebeck Construction | (1st & 2nd floors) ti on levels 1 & 2, new lobby stairs, cafe, dining area, kitchen, training and fitness center and building common areas new restroom on level 2Details
(1st & 2nd floors) ti on levels 1 & 2, new lobby stairs, cafe, dining area, kitchen, training and fitness center and building common areas new restroom on level 2 | $7,500,000 |
| Dec 20, 2013 | Completed final sign-off Dec 2014 | 499 Illinois St | Truebeck Construction | tenant improvement on floors 1-4 b occupancy for laboratories. work to include (n) restrooms, partitions, ceilings, finishes & mep.Details
tenant improvement on floors 1-4 b occupancy for laboratories. work to include (n) restrooms, partitions, ceilings, finishes & mep. | $16,408,000 |