Bruce Anderson
- License
- M27694
- Mechanical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up M27694 at the Board for Professional Engineers
- Listed as
- authorized agent-others, engineer
- Firm
- Exp
- Based in
- San Diego
- On San Francisco permits
- Dec 2004 to Mar 2016
2 permits since 2000 (authorized agent-others on 1 permit, engineer on 1 permit): 2 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Turner Construction Co
- Architects
- Nancy Escano
- Engineers
- Michael Neal
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 1
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 10, 2016 | Completed final sign-off Aug 2016 | 499 Illinois St | Turner Construction Co | minor upgrades to lab/office areas which include hvac and elec. no changes to walls or control areas. finish flooring changes for a few labs. tenant moving from 4th to 3rd floor. ** maher: n/a **Details
minor upgrades to lab/office areas which include hvac and elec. no changes to walls or control areas. finish flooring changes for a few labs. tenant moving from 4th to 3rd floor. ** maher: n/a ** | $130,000 |
| Dec 29, 2004 | Completed final sign-off Mar 2006 | 662 Arguello Bl | per structural plan, replace concrete foundation, install steel beam at 2nd level, steel moment framDetails
per structural plan, replace concrete foundation, install steel beam at 2nd level, steel moment fram | $50,000 |