Block 3940, lot 005
499 Illinois St
- City’s use
- Commercial Misc
- Built
- 2008
- Stories
- 2
- Building
- 237,216 sq ft
- Zoning
- NA
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
16 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 20, 2025 | In progress issued Jan 2026 | 499 Illinois St | Dpr Construction A | 2nd floor: lab 251- installation of new electrical receptacles from an existing panel and strap equipment anchorage. ref #202402216284Details
2nd floor: lab 251- installation of new electrical receptacles from an existing panel and strap equipment anchorage. ref #202402216284 | $25,000 |
| Feb 10, 2025 | Completed final sign-off Feb 2025 | 499 Illinois St | R L H Fire Protection Inc | 2nd fl- revision to pa # 2024-1031-4118 ref to t.i. pa #2024-0221-6284 relocate 4 additional sprinklers in the restrooms & add 3 additional sprinklers for the eyewash stationsDetails
2nd fl- revision to pa # 2024-1031-4118 ref to t.i. pa #2024-0221-6284 relocate 4 additional sprinklers in the restrooms & add 3 additional sprinklers for the eyewash stations | $4,000 |
| Oct 31, 2024 | Completed final sign-off Feb 2025 | 499 Illinois St | R L H Fire Protection Inc | 2/f: fire sprinkler: relocate 68, add 13, delete 1 sprinklers on 2/f. ref t.i. pa 202402216284.Details
2/f: fire sprinkler: relocate 68, add 13, delete 1 sprinklers on 2/f. ref t.i. pa 202402216284. | $23,000 |
| Feb 21, 2024 | Completed final sign-off Jul 2025 | 499 Illinois St | Dpr Construction A | 2nd floor: interior t.i. includes new non-load bearing partitions, doors, ceiling and finishes. mep included.Details
2nd floor: interior t.i. includes new non-load bearing partitions, doors, ceiling and finishes. mep included. | $500,000 |
| Aug 29, 2023 | Completed final sign-off Nov 2024 | 499 Illinois St | Therma Llc | demo (1) 45 ton air cooled chiller, (2) 3hp chilled water pumps. install(2) 60 ton air cooled chillers, 3 chilled water pumps and new electrical service for 2nd chiller & reconnect extg utilities where applicableDetails
demo (1) 45 ton air cooled chiller, (2) 3hp chilled water pumps. install(2) 60 ton air cooled chillers, 3 chilled water pumps and new electrical service for 2nd chiller & reconnect extg utilities where applicable | $300,000 |
| Jun 24, 2021 | Completed final sign-off Feb 2022 | 409 Illinois St | Truebeck Construction | install new fall arrest tie down on e mech screen structure, penthouse roofs, mech equip padsDetails
install new fall arrest tie down on e mech screen structure, penthouse roofs, mech equip pads | $95,000 |
| Jun 24, 2021 | Completed final sign-off Feb 2022 | 499 Illinois St | Truebeck Construction | install new fall arrest tie down on e mech screen structure, penthouse roofs, mech equip padsDetails
install new fall arrest tie down on e mech screen structure, penthouse roofs, mech equip pads | $95,000 |
| Oct 7, 2020 | Never finaled issued Jan 2022, no final | 499 Illinois St | Truebeck Construction | replace pavers and add bar which will be operated by existing restaurant. mep to be deferred [ref 202001162130]Details
replace pavers and add bar which will be operated by existing restaurant. mep to be deferred [ref 202001162130] | $800,000 |
| Sep 30, 2020 | Expired or cancelled withdrawn Aug 2021 | 499 Illinois St | installation of (n) lab equipment incl seismic bracing. minor selective demo. electrical upgrades include (n) circuits. plumbing upgrade work include localized co2 manifold. ** maher: n/a **Details
installation of (n) lab equipment incl seismic bracing. minor selective demo. electrical upgrades include (n) circuits. plumbing upgrade work include localized co2 manifold. ** maher: n/a ** | $168,300 | |
| Jan 16, 2020 | Never finaled issued Aug 2020, no final | 409 Illinois St | Truebeck Construction | replace pavers and add bar which will be operated by (e) restaurant; stem pation new bar area east side of patio. slab podium landscapingDetails
replace pavers and add bar which will be operated by (e) restaurant; stem pation new bar area east side of patio. slab podium landscaping | $800,000 |
| Dec 17, 2019 | Expired or cancelled suspend Feb 2020 | 409 Illinois St | Truebeck Construction | demolition of existing pavers and paving support system. construction documents issued under separate permit, see landscape architect drawings.Details
demolition of existing pavers and paving support system. construction documents issued under separate permit, see landscape architect drawings. | $25,000 |
| Mar 6, 2018 | Completed final sign-off Mar 2018 | 499 Illinois St | Dome Construction Corp | rev to app# 201708074011 delete interior partition in board room and split 2 work rooms into 3 phone room, slight electrical/mechanical reworkDetails
rev to app# 201708074011 delete interior partition in board room and split 2 work rooms into 3 phone room, slight electrical/mechanical rework | $40,000 |
| Jan 2, 2018 | Never finaled issued Jan 2018, no final | 409 Illinois St | Red Hawk Fire & Security Ca Llc | 6th floor -f/a: add 2 new ceiling mount hornstrobbes. n/a maher work is only at 499 illioois st.Details
6th floor -f/a: add 2 new ceiling mount hornstrobbes. n/a maher work is only at 499 illioois st. | $2,500 |
| Jun 21, 2016 | Completed final sign-off Aug 2016 | 499 Illinois St | Turner Construction Co | revision to 2016-0310-1744 reduction in scope - removal of all previously noted changes to room 2-3060 and 2-3056 and 2-3058. all rooms noted are to remain as (e). no change. maher naDetails
revision to 2016-0310-1744 reduction in scope - removal of all previously noted changes to room 2-3060 and 2-3056 and 2-3058. all rooms noted are to remain as (e). no change. maher na | |
| Jun 9, 2016 | Completed final sign-off Oct 2016 | 409 Illinois St | Red Hawk Fire & Security Ca Llc | 1st floor - fire alarm t.i. add 2 horn strobes and 2 strobes & removal of (1) existing horn/strobe. ref #201603010834. n/a for maher.Details
1st floor - fire alarm t.i. add 2 horn strobes and 2 strobes & removal of (1) existing horn/strobe. ref #201603010834. n/a for maher. | $2,000 |
| Mar 10, 2016 | Completed final sign-off Aug 2016 | 499 Illinois St | Turner Construction Co | minor upgrades to lab/office areas which include hvac and elec. no changes to walls or control areas. finish flooring changes for a few labs. tenant moving from 4th to 3rd floor. ** maher: n/a **Details
minor upgrades to lab/office areas which include hvac and elec. no changes to walls or control areas. finish flooring changes for a few labs. tenant moving from 4th to 3rd floor. ** maher: n/a ** | $130,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Truebeck Construction (5), Dpr Construction A (2), R L H Fire Protection Inc (2), Red Hawk Fire & Security Ca Llc (2), Turner Construction Co (2), Dome Construction Corp, Therma Llc
- Architects
- Eric Ibsen (3), Nancy Escano (3), Hugh Cotter, Randall Dowler, Roderick Wyllie
- Engineers
- Ronald Hamburger (2), Bruce Anderson, Michael Neal, Randall Lamb
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.