70 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 13, 2017 | Completed final sign-off Dec 2017 | 218 Buchanan St | Securecom Inc | as built revision to pa# 201209059006 and 201612296143. add 2 way ecs supervision by bldg fa system, add another modules and revise sequence of operation matrix.Details
as built revision to pa# 201209059006 and 201612296143. add 2 way ecs supervision by bldg fa system, add another modules and revise sequence of operation matrix. | $5,000 |
| May 19, 2017 | Completed final sign-off Jan 2018 | 218 Buchanan St | Build Group Inc. | as built errcs permit for revised bda and antenna locations. ref 201209059006 s(9) & 201610170424.Details
as built errcs permit for revised bda and antenna locations. ref 201209059006 s(9) & 201610170424. | |
| May 4, 2017 | Completed final sign-off Jan 2018 | 218 Buchanan St | Build Group Inc. | to obtain final inspection for work approved under pa#201307172033 and 201406128258.Details
to obtain final inspection for work approved under pa#201307172033 and 201406128258. | |
| Apr 14, 2017 | Never finaled issued Apr 2017, no final | 229 Haight St | street spaceDetails
street space | ||
| Apr 10, 2017 | Completed final sign-off Apr 2017 | 215 Haight St | The Fine European Construction/Uwb Dober | revision to pa#201606210495 for occupancy re-calculation onlyDetails
revision to pa#201606210495 for occupancy re-calculation only | |
| Apr 4, 2017 | Never finaled issued Apr 2017, no final | 215 Haight St | street spaceDetails
street space | ||
| Mar 3, 2017 | Never finaled issued Apr 2017, no final | 229 Haight St | pour concrete foundation for bunny statue installation. install and anchor 10'x4'-10"Details
pour concrete foundation for bunny statue installation. install and anchor 10'x4'-10" | $3,500 | |
| Feb 24, 2017 | Completed final sign-off Mar 2017 | 215 Haight St | Securecom Inc | floors 1 & 2 - add 6 horn strobes to existing fire alarm system on all floorsDetails
floors 1 & 2 - add 6 horn strobes to existing fire alarm system on all floors | $13,900 |
| Dec 29, 2016 | Completed final sign-off Jan 2018 | 218 Buchanan St | revision to 201209059006 s8 for 2 way elevator landing communication system in 3 blds 2c, 2d, 2e (2 seperate systems)Details
revision to 201209059006 s8 for 2 way elevator landing communication system in 3 blds 2c, 2d, 2e (2 seperate systems) | $10,000 | |
| Oct 17, 2016 | Completed final sign-off Jan 2018 | 218 Buchanan St | Build Group Inc. | as built errcs for revised bda locations. ref app#201209059006 s9Details
as built errcs for revised bda locations. ref app#201209059006 s9 | |
| Sep 7, 2016 | Never finaled issued Sep 2016, no final | 218 Buchanan St | street space permitDetails
street space permit | ||
| Sep 2, 2016 | Completed final sign-off May 2017 | 218 Buchanan St | Build Group Inc. | ref pa 201209059006 s5, provide added functions to (e) addressable fire alarm system to accommodate errcs.Details
ref pa 201209059006 s5, provide added functions to (e) addressable fire alarm system to accommodate errcs. | |
| Aug 18, 2016 | Never finaled issued Jan 2017, no final | 215 Haight St | Pj Murphy & Associates Inc Dba Gnu Group | erect four single faced, non-electric, wall signsDetails
erect four single faced, non-electric, wall signs | $100 |
| Aug 18, 2016 | Never finaled issued Jan 2017, no final | 100 Waller St | Pj Murphy & Associates Inc Dba Gnu Group, Build Group Inc. | erect one single faced non-electric wall signsDetails
erect one single faced non-electric wall signs | $1,365 |
| Aug 18, 2016 | Never finaled issued Jan 2017, no final | 100 Waller St | Pj Murphy & Associates Inc Dba Gnu Group, Build Group Inc. | erect single faced non-electric wall signs.Details
erect single faced non-electric wall signs. | $182 |
| Aug 18, 2016 | Never finaled issued Jan 2017, no final | 100 Waller St | Pj Murphy & Associates Inc Dba Gnu Group, Build Group Inc. | erect a single faced non-electric wall signDetails
erect a single faced non-electric wall sign | $100 |
| Aug 18, 2016 | Never finaled issued Jan 2017, no final | 215 Haight St | Pj Murphy & Associates Inc Dba Gnu Group | erect a single faced, non-electric, wall signDetails
erect a single faced, non-electric, wall sign | $100 |
| Aug 18, 2016 | Never finaled issued Jan 2017, no final | 155 Laguna St | Pj Murphy & Associates Inc Dba Gnu Group, Build Group Inc. | erect one single faced non-electric wall signsDetails
erect one single faced non-electric wall signs | $159 |
| Aug 18, 2016 | Never finaled issued Jan 2017, no final | 215 Haight St | Pj Murphy & Associates Inc Dba Gnu Group | erect a single faced, non-electric, wall signDetails
erect a single faced, non-electric, wall sign | $102 |
| Aug 18, 2016 | Never finaled issued Jan 2017, no final | 215 Haight St | Pj Murphy & Associates Inc Dba Gnu Group | erect a single faced, non-electric, wall signDetails
erect a single faced, non-electric, wall sign | $182 |
| Aug 18, 2016 | Never finaled issued Jan 2017, no final | 155 Laguna St | Pj Murphy & Associates Inc Dba Gnu Group, Build Group Inc. | erect two single faced non-electric wall signsDetails
erect two single faced non-electric wall signs | $284 |
| Aug 18, 2016 | Expired or cancelled cancelled Mar 2017 | 155 Laguna St | Build Group Inc. | erect one single faced non-electric wall signsDetails
erect one single faced non-electric wall signs | $600 |
| Aug 18, 2016 | Never finaled issued Jan 2017, no final | 155 Laguna St | Pj Murphy & Associates Inc Dba Gnu Group, Build Group Inc. | erect two single faced non-electric wall signsDetails
erect two single faced non-electric wall signs | $182 |
| Aug 18, 2016 | Never finaled issued Jan 2017, no final | 100 Waller St | Pj Murphy & Associates Inc Dba Gnu Group, Build Group Inc. | erect two single faced non-electric wall signsDetails
erect two single faced non-electric wall signs | $546 |
| Aug 18, 2016 | Never finaled issued Jan 2017, no final | 155 Laguna St | Pj Murphy & Associates Inc Dba Gnu Group, Build Group Inc. | erect one single faced non-electric wall signsDetails
erect one single faced non-electric wall signs | $364 |
| Aug 18, 2016 | Never finaled issued Jan 2017, no final | 155 Laguna St | Pj Murphy & Associates Inc Dba Gnu Group, Build Group Inc. | erect four single faced non-electric wall signsDetails
erect four single faced non-electric wall signs | $100 |
| Jun 21, 2016 | Completed final sign-off Apr 2017 | 215 Haight St | The Fine European Construction/Uwb Dober | build non structure interior partitions, framing, drywall, doors.Details
build non structure interior partitions, framing, drywall, doors. | $120,000 |
| Mar 30, 2016 | Completed final sign-off Jun 2016 | 229 Haight St | Build Group Inc. | to obtain final inspection for work approved under pa # 201408295077 & 201307172029. all work is completeDetails
to obtain final inspection for work approved under pa # 201408295077 & 201307172029. all work is complete | |
| Feb 25, 2016 | Never finaled issued Feb 2016, no final | 218 Buchanan St | street spaceDetails
street space | ||
| Feb 2, 2016 | Completed final sign-off Jan 2018 | 218 Buchanan St | Build Group Inc. | documentation only permit for revised notice of special restrictions under planning code (nsr) document #2015k180688 issued on 12/23/15Details
documentation only permit for revised notice of special restrictions under planning code (nsr) document #2015k180688 issued on 12/23/15 | |
| Jan 28, 2016 | Completed final sign-off Jan 2018 | 218 Buchanan St | Build Group Inc. | arch pa revision 2012-0905-6006s3 for idf closet location identification. upgrading battery storage rooms with 2 hour ratingDetails
arch pa revision 2012-0905-6006s3 for idf closet location identification. upgrading battery storage rooms with 2 hour rating | |
| Jan 15, 2016 | Never finaled issued Jan 2016, no final | 218 Buchanan St | Details
| ||
| Dec 29, 2015 | Completed final sign-off Jan 2018 | 218 Buchanan St | Build Group Inc. | revision to app#201209059006 s3 to add inverters as emergency power back up in buildings 2c, 2c, 2e.Details
revision to app#201209059006 s3 to add inverters as emergency power back up in buildings 2c, 2c, 2e. | $300,000 |
| Dec 17, 2015 | Never finaled issued Jan 2017, no final | 155 Laguna St | Pj Murphy & Associates Inc Dba Gnu Group | bldg 2e - erect (1) non-electric double faced stand sign.Details
bldg 2e - erect (1) non-electric double faced stand sign. | $3,840 |
| Dec 4, 2015 | Completed final sign-off Jun 2016 | 100 Waller St | Pj Murphy & Associates Inc Dba Gnu Group | common area- evacuation signage fabrication and installation 12 signsDetails
common area- evacuation signage fabrication and installation 12 signs | $750 |
| Dec 4, 2015 | Completed final sign-off Apr 2017 | 215 Haight St | Pj Murphy & Associates Inc Dba Gnu Group | evacuation signage fabrication/installation. 7 signsDetails
evacuation signage fabrication/installation. 7 signs | $1,100 |
| Dec 4, 2015 | Completed final sign-off Jun 2016 | 155 Laguna St | Pj Murphy & Associates Inc Dba Gnu Group | common area- evacuation signage fabrication and installation 22 signsDetails
common area- evacuation signage fabrication and installation 22 signs | $750 |
| Dec 1, 2015 | Completed final sign-off Jun 2016 | 229 Haight St | Pj Murphy & Associates Inc Dba Gnu Group | evacuation signage fabrication/installation 10 signsDetails
evacuation signage fabrication/installation 10 signs | $2,200 |
| Oct 1, 2015 | Completed final sign-off May 2017 | 218 Buchanan St | Build Group Inc. | revision to pa 201209059006 for fire alarm hoistway smoke detector & corresponding detailsDetails
revision to pa 201209059006 for fire alarm hoistway smoke detector & corresponding details | |
| Sep 10, 2015 | Completed final sign-off Jun 2016 | 229 Haight St | Build Group Inc. | two way elevator landing communication systemDetails
two way elevator landing communication system | $5,000 |
| Sep 8, 2015 | Never finaled issued Sep 2015, no final | 218 Buchanan St | street space permitDetails
street space permit | ||
| Sep 4, 2015 | Never finaled filed Sep 2015, never issued | 218 Buchanan St | street spaceDetails
street space | ||
| Jun 30, 2015 | Completed final sign-off Sep 2015 | 218 Buchanan St | Build Group Inc. | revision to app#201404294488: a new 8" backflow preventer will be installed on an un-site private hydrant line. 2 fire department connections will be site mounted rather than bldg mounted. ref app#201209059006.Details
revision to app#201404294488: a new 8" backflow preventer will be installed on an un-site private hydrant line. 2 fire department connections will be site mounted rather than bldg mounted. ref app#201209059006. | $13,000 |
| Mar 25, 2015 | Completed final sign-off Jun 2016 | 229 Haight St | Build Group Inc. | installation of furred walls to preserve and protect (e) hollow caly tile wall w/historic mural. revision to pa# 2013 0830 5692Details
installation of furred walls to preserve and protect (e) hollow caly tile wall w/historic mural. revision to pa# 2013 0830 5692 | $5,000 |
| Feb 18, 2015 | Never finaled issued Feb 2015, no final | 218 Buchanan St | street space permit (renewal of permit # 1338694)Details
street space permit (renewal of permit # 1338694) | ||
| Oct 14, 2014 | Never finaled issued Oct 2014, no final | 218 Buchanan St | street space permit (renewal of permit # 1300618)Details
street space permit (renewal of permit # 1300618) | ||
| Sep 19, 2014 | Completed final sign-off Jun 2016 | 229 Haight St | Build Group Inc. | final below market rate unit location and notice of special resetrictions recordation. for record purposes only. no work.Details
final below market rate unit location and notice of special resetrictions recordation. for record purposes only. no work. | |
| Aug 29, 2014 | Expired or cancelled expired Jun 2016 | 229 Haight St | Build Group Inc. | revision to pa 201308305692; for california bldg code historical exception. revised green points rating, removal of t-24 & revised room classification.Details
revision to pa 201308305692; for california bldg code historical exception. revised green points rating, removal of t-24 & revised room classification. | |
| Jul 22, 2014 | Never finaled issued Jul 2014, no final | 218 Buchanan St | Build Group Inc. | revision to appl #2013.0717.2033 for fire review & approval only to cut & cap utitity lines at property line (missed route from previous permit).Details
revision to appl #2013.0717.2033 for fire review & approval only to cut & cap utitity lines at property line (missed route from previous permit). | |
| Jul 10, 2014 | Never finaled issued Dec 2014, no final | 218 Buchanan St | Build Group Inc. | revision appl. #2012.0905.9006s1. provide additional foundation details per plan.Details
revision appl. #2012.0905.9006s1. provide additional foundation details per plan. | |
| Jun 12, 2014 | Expired or cancelled expired Jan 2018 | 218 Buchanan St | Build Group Inc. | erect a tower crane to be used for the construction of residential multi-unit buildings and provide foundation for tower crane.Details
erect a tower crane to be used for the construction of residential multi-unit buildings and provide foundation for tower crane. | $100,000 |
| May 20, 2014 | Never finaled issued May 2014, no final | 100 Waller St | add address to block 0857, lot 001 as; 100 waller streetDetails
add address to block 0857, lot 001 as; 100 waller street | ||
| May 20, 2014 | Never finaled issued May 2014, no final | 201 Haight St | add address to block 0857, lot 001 as; 201, 203, 205, 215 haight streetDetails
add address to block 0857, lot 001 as; 201, 203, 205, 215 haight street | ||
| Apr 29, 2014 | Never finaled issued May 2014, no final | 218 Buchanan St | Build Group Inc. | installation of underground for sprinkler system and new hydrantDetails
installation of underground for sprinkler system and new hydrant | $80,000 |
| Mar 7, 2014 | Completed final sign-off Mar 2016 | 229 Haight St | Build Group Inc. | fire sprinkler work associated with building remodel under pa#201308305692.Details
fire sprinkler work associated with building remodel under pa#201308305692. | $650,000 |
| Mar 7, 2014 | Completed final sign-off Mar 2016 | 229 Haight St | Build Group Inc. | fire alarm work associated with building remodel under pa#201308305692.Details
fire alarm work associated with building remodel under pa#201308305692. | $650,000 |
| Mar 7, 2014 | Completed final sign-off Jun 2016 | 229 Haight St | Build Group Inc. | mep work associated with building remodel under pa#201308305692.Details
mep work associated with building remodel under pa#201308305692. | $2,000,000 |
| Feb 13, 2014 | Never finaled issued Feb 2014, no final | 218 Buchanan St | street s[aceDetails
street s[ace | ||
| Feb 11, 2014 | Never finaled filed Feb 2014, never issued | 218 Buchanan St | street space permit (renewal of permit # 13107633Details
street space permit (renewal of permit # 13107633 | ||
| Dec 20, 2013 | Never finaled issued Dec 2013, no final | 218 Buchanan St | street spaceDetails
street space | ||
| Sep 19, 2013 | Never finaled issued Sep 2013, no final | 218 Buchanan St | clarification to site permit pa#201209059006 s - construction type is iiia over ia, not just iaDetails
clarification to site permit pa#201209059006 s - construction type is iiia over ia, not just ia | ||
| Aug 30, 2013 | Completed final sign-off Jun 2016 | 229 Haight St | Build Group Inc. | change of occupancy. from b to r-2 and a-3. exterior demo window & door openings. interior structural demo & voluntary seismic upgrades of roof and wall stiffening at new 3Details
change of occupancy. from b to r-2 and a-3. exterior demo window & door openings. interior structural demo & voluntary seismic upgrades of roof and wall stiffening at new 3 | $3,500,000 |
| Aug 13, 2013 | Never finaled issued Aug 2013, no final | 218 Buchanan St | street spaceDetails
street space | ||
| Jul 17, 2013 | Expired or cancelled expired Jun 2016 | 229 Haight St | Build Group Inc. | interior non-structural demolition at basement level, 1/f & 2/f. all work to comply with ab-017. maintain exiting per chapter 10, sfbc '2010.Details
interior non-structural demolition at basement level, 1/f & 2/f. all work to comply with ab-017. maintain exiting per chapter 10, sfbc '2010. | $100,000 |
| Jul 17, 2013 | Expired or cancelled expired Jan 2018 | 218 Buchanan St | Build Group Inc. | site cleaning, work to include removal of concrete walks, asphalt pavement, brick/pavers, concrete lip/gutters, landscaping, walls and curbs.Details
site cleaning, work to include removal of concrete walks, asphalt pavement, brick/pavers, concrete lip/gutters, landscaping, walls and curbs. | $70,000 |
| May 2, 2013 | Completed final sign-off Jun 2016 | 229 Haight St | repair & replace existing exterior windows. add new windows as indicated on drawings.Details
repair & replace existing exterior windows. add new windows as indicated on drawings. | $125,000 | |
| May 1, 2013 | Never finaled issued May 2013, no final | 229 Haight St | created address at block 0857, lot 001 as; 229 haight st.Details
created address at block 0857, lot 001 as; 229 haight st. | ||
| Feb 15, 2013 | Never finaled issued Jul 2013, no final | 218 Buchanan St | Build Group Inc. | to demolish 1 story gymnasium building.Details
to demolish 1 story gymnasium building. | $20,000 |
| Sep 5, 2012 | Completed final sign-off Jan 2018 | 218 Buchanan St | Build Group Inc. | bldg 2 - erect 6 story, 2 basement, 191 dwelling units with parking building.Details
bldg 2 - erect 6 story, 2 basement, 191 dwelling units with parking building. | $22,700,000 |
| Jan 14, 2011 | Never finaled issued Jan 2011, no final | 218 Buchanan St | street space permitDetails
street space permit |