Christian Haegglund
- Listed as
- architect, engineer
- Firm
- Bar Architects
- Based in
- San Francisco
- On San Francisco permits
- Oct 2008 to Feb 2026
53 permits since 2000 (architect on 51 permits, engineer on 2 permits): 33 completed, 5 in progress, 9 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 10, 2026 | In progress filed Feb 2026, not yet issued | 538 Laurel St | mayfair building: priority mayor's ed 17-02 - erect a type 1b, 4-story over 1 basement mixed-use building with 31 residential dwelling units.Details
mayfair building: priority mayor's ed 17-02 - erect a type 1b, 4-story over 1 basement mixed-use building with 31 residential dwelling units. | $15,000,000 | |
| Feb 6, 2026 | In progress filed Feb 2026, not yet issued | 528 Laurel St | plaza building-a wing: priority mayor's ed 17-02 - erect a type 1b, 5-story, 1 bsmnt, mixed-use bldg with 62 residential units, bsmnt parking, and commercial tenant spaces. shares plans with plaza b wing under pa # 2025-1211-1587. the plaza building is a single type 1b building with 123 units total.Details
plaza building-a wing: priority mayor's ed 17-02 - erect a type 1b, 5-story, 1 bsmnt, mixed-use bldg with 62 residential units, bsmnt parking, and commercial tenant spaces. shares plans with plaza b wing under pa # 2025-1211-1587. the plaza building is a single type 1b building with 123 units total. | $26,000,000 | |
| Feb 6, 2026 | In progress filed Feb 2026, not yet issued | 519 Walnut St | plaza building-b wing: priority mayor's ed 17-02 - erect a type 1b, 5-story, 1 bsmnt, mixed-use bldg with 61 residential units, bsmnt parking, and commercial tenant spaces. shares plans with plaza a wing under pa # 2025-1212-1640. the plaza building is a single type 1b building with 123 units total.Details
plaza building-b wing: priority mayor's ed 17-02 - erect a type 1b, 5-story, 1 bsmnt, mixed-use bldg with 61 residential units, bsmnt parking, and commercial tenant spaces. shares plans with plaza a wing under pa # 2025-1212-1640. the plaza building is a single type 1b building with 123 units total. | $47,000,000 | |
| Oct 11, 2024 | Completed final sign-off Nov 2024 | 1360 43rd Av | Cahill Contractors Llc. | revision to pa 201912099099 addendum 2 for conversion of mobility and communications units to adaptableDetails
revision to pa 201912099099 addendum 2 for conversion of mobility and communications units to adaptable | |
| Aug 16, 2024 | Completed final sign-off Mar 2025 | 1360 43rd Av | Cahill Contractors Llc. | revision to 201912099009 addendum 2 for changes to parking layout and additonal signageDetails
revision to 201912099009 addendum 2 for changes to parking layout and additonal signage | |
| Jul 10, 2024 | In progress issued Jul 2024 | 1360 43rd Av | Cahill Contractors Llc. | ref 201912099009 addition of (1) building monument single sided illuminated sign for "scv -shirley chisholm village 1360" facing street with 58 channel letters. shared plans 202406114215Details
ref 201912099009 addition of (1) building monument single sided illuminated sign for "scv -shirley chisholm village 1360" facing street with 58 channel letters. shared plans 202406114215 | $8,000 |
| Jun 11, 2024 | Completed final sign-off Mar 2025 | 1360 43rd Av | Cahill Contractors Llc. | addition of one building monument sign, which is to be illuminated, and has its own self standing footing/foundation which is independant of the adjacent building structure.Details
addition of one building monument sign, which is to be illuminated, and has its own self standing footing/foundation which is independant of the adjacent building structure. | $2,000 |
| Oct 25, 2023 | In progress issued Jul 2024 | 3300 Mission St | Guzman Construction Group Inc. | priority processing: new 6-story type iiia over type 1a mixed-use bldg with 35 studio units (100% affordable housing mayor ed 13-01), residential community space, and commercial/retail space on 1st floor. preserve (e) 2-story facade along mission st and 29th st.Details
priority processing: new 6-story type iiia over type 1a mixed-use bldg with 35 studio units (100% affordable housing mayor ed 13-01), residential community space, and commercial/retail space on 1st floor. preserve (e) 2-story facade along mission st and 29th st. | $17,000,000 |
| Feb 27, 2023 | Expired or cancelled expired Mar 2026 | 1360 43rd Av | Cahill Contractors Llc. | priority 13-01: revision to pa# 201912099009/s-1 & s-2. structural reductioon to the slab thickness over stall #4. provide 18" draft stop over ev stalls. revised mechanical and electrical related to changes.Details
priority 13-01: revision to pa# 201912099009/s-1 & s-2. structural reductioon to the slab thickness over stall #4. provide 18" draft stop over ev stalls. revised mechanical and electrical related to changes. | |
| Oct 18, 2021 | Completed final sign-off Aug 2025 | 830 Eddy St | Ghilotti Bros Inc | administrative permit to record declarition of restriction under 201612285985. no work perform under this permit. declarition of restriction between 830 eddy and 203 willow/ 815-825 van ness propertiesDetails
administrative permit to record declarition of restriction under 201612285985. no work perform under this permit. declarition of restriction between 830 eddy and 203 willow/ 815-825 van ness properties | |
| Oct 7, 2021 | Completed final sign-off Aug 2025 | 830 Eddy St | Webcor Construction Lp | administrative correction to site permit #2016-1228-5985; to clarify location of 2 code required car share spaces per planning commission motion #19819 associated with cua# 2015-00946 cuaDetails
administrative correction to site permit #2016-1228-5985; to clarify location of 2 code required car share spaces per planning commission motion #19819 associated with cua# 2015-00946 cua | |
| Jul 20, 2021 | Completed final sign-off Aug 2025 | 830 Eddy St | Webcor Construction Lp | revision to 201612285985 r1 (fire alarm) and 56 w/ reused sequene of operation matrixDetails
revision to 201612285985 r1 (fire alarm) and 56 w/ reused sequene of operation matrix | |
| May 26, 2021 | Completed final sign-off Oct 2021 | 830 Eddy St | Webcor Construction Lp | level 1 and 2 unit guardrails and roof level glass guardrails at roof parapet. shop drawings per approval under 201612285985Details
level 1 and 2 unit guardrails and roof level glass guardrails at roof parapet. shop drawings per approval under 201612285985 | |
| Mar 23, 2021 | Completed final sign-off Jul 2021 | 830 Eddy St | Webcor Construction Lp | revision to pa# 201612285985 addendum 3. changes to an office and a bathroom at level 1 only.Details
revision to pa# 201612285985 addendum 3. changes to an office and a bathroom at level 1 only. | |
| Mar 11, 2021 | Completed final sign-off Jul 2021 | 830 Eddy St | Webcor Construction Lp | installatin of exterior building maintenance system, ref pa# 2016-1228-5985Details
installatin of exterior building maintenance system, ref pa# 2016-1228-5985 | $10,000 |
| Dec 9, 2019 | Never finaled issued Apr 2022, no final | 1351 42nd Av | Cahill Contractors Llc. | priority project,mayor ed 13-01. demolish a 2-story, type v, school bldg.Details
priority project,mayor ed 13-01. demolish a 2-story, type v, school bldg. | $50,000 |
| Dec 9, 2019 | Completed final sign-off Mar 2025 | 1360 43rd Av | Cahill Contractors Llc. | priority project, mayor ed 13-01. to erect a type 3a over type 1a, 5-story, 100% afforable educator building w/ 135 residential units.Details
priority project, mayor ed 13-01. to erect a type 3a over type 1a, 5-story, 100% afforable educator building w/ 135 residential units. | $40,000,000 |
| Nov 13, 2019 | Completed final sign-off Jun 2021 | 1532 Harrison St | Cannon Constructors North Inc | revision pa# 2016-0725-3262s: modify a guardrail detail relating to a specific guardrail at the bridge seismic joint. this affects a total of 28 guardrail extensionsDetails
revision pa# 2016-0725-3262s: modify a guardrail detail relating to a specific guardrail at the bridge seismic joint. this affects a total of 28 guardrail extensions | |
| Jul 16, 2019 | Expired or cancelled withdrawn Aug 2020 | 1532 Harrison St | Cannon Constructors North Inc | revision to s2 (arch/mep) of pa #2016-0725-3262 s. change roof deck occupancy from a-3 to r-2 accessory.Details
revision to s2 (arch/mep) of pa #2016-0725-3262 s. change roof deck occupancy from a-3 to r-2 accessory. | |
| Apr 19, 2019 | Completed final sign-off Oct 2021 | 830 Eddy St | Webcor Construction Lp | landscape improvements associated with 203 willow. portions of landscape+fencing that spans along property line. bpa 2019-0419-8473.Details
landscape improvements associated with 203 willow. portions of landscape+fencing that spans along property line. bpa 2019-0419-8473. | $5,000 |
| Apr 19, 2019 | Never finaled issued Sep 2019, no final | 203 Willow St | Webcor Construction Lp | mep deferred submittal: removal and reconstruction of exterior landscape, hardscape & trash enclose within service courtyard, including security fencing along will street and adjacent to burger king drive trough, modifications to (e) stromdrains, irrigation & pedestrain walkways.Details
mep deferred submittal: removal and reconstruction of exterior landscape, hardscape & trash enclose within service courtyard, including security fencing along will street and adjacent to burger king drive trough, modifications to (e) stromdrains, irrigation & pedestrain walkways. | $200,000 |
| Mar 26, 2019 | Completed final sign-off Oct 2019 | 1140 Folsom St | Cahill Contractors Llc. | 927 square feet of back of house service areas (corridor, trash room, storage room) and demising walls for 3 future tenants, raised concrete slabs installed in both areas & one future tenant, elec, and mech for boh areas, and plumbing provisions for future tenantsDetails
927 square feet of back of house service areas (corridor, trash room, storage room) and demising walls for 3 future tenants, raised concrete slabs installed in both areas & one future tenant, elec, and mech for boh areas, and plumbing provisions for future tenants | $400,000 |
| Oct 18, 2017 | Completed final sign-off Dec 2017 | 1140 Folsom St | Cahill Contractors Llc. | revision to pa #2014-1110-1145 s3 for plumbing plan check of harvest rain water system.Details
revision to pa #2014-1110-1145 s3 for plumbing plan check of harvest rain water system. | |
| Sep 29, 2017 | Completed final sign-off Nov 2017 | 1140 Folsom St | Cahill Const Service Inc | revision to pa#201411101145-s3 for roof construction details. n/a ordinance #155-13Details
revision to pa#201411101145-s3 for roof construction details. n/a ordinance #155-13 | $5,000 |
| Mar 1, 2017 | Completed final sign-off Jan 2019 | 1 Henry Adams St | Priority Architectural Graphics Dba Prio | 35 evacuation maps to be reviewed by sffd only - roof, 1-6Details
35 evacuation maps to be reviewed by sffd only - roof, 1-6 | $7,000 |
| Dec 28, 2016 | Completed final sign-off Jun 2024 | 830 Eddy St | Webcor Construction Lp | to erect 13 stories, 3 basements, type i-a, 126 residential units with parking building.Details
to erect 13 stories, 3 basements, type i-a, 126 residential units with parking building. | $38,700,000 |
| Oct 19, 2016 | Never finaled issued Oct 2016, no final | 1 Henry Adams St | Suffolk Constr Co. Inc. Dba Suffolk-Roel | add additional fire protection to the top of roof around bbq area to prevent burning and combustion (ref. pa# 2013-0625-0394_s)Details
add additional fire protection to the top of roof around bbq area to prevent burning and combustion (ref. pa# 2013-0625-0394_s) | $4,500 |
| Sep 8, 2016 | Completed final sign-off May 2018 | 1550 17th St | James E Roberts-Obayashi Corporation, Martin Building Co | construction of new non-load bearing wall at property line condition where none exists and accessible upgrades, restroom upgrade. n/a for maherDetails
construction of new non-load bearing wall at property line condition where none exists and accessible upgrades, restroom upgrade. n/a for maher | $22,000 |
| Jul 25, 2016 | Completed final sign-off Jul 2022 | 1532 Harrison St | Cannon Constructors North Inc | to erect 7 stories, 1 basement, type i-b, 136 residential units and commercial building (r-2,m,s-2). maher exempted.Details
to erect 7 stories, 1 basement, type i-b, 136 residential units and commercial building (r-2,m,s-2). maher exempted. | $32,000,000 |
| Jun 21, 2016 | Completed final sign-off Apr 2017 | 215 Haight St | The Fine European Construction/Uwb Dober | build non structure interior partitions, framing, drywall, doors.Details
build non structure interior partitions, framing, drywall, doors. | $120,000 |
| Jan 28, 2016 | Completed final sign-off Jan 2018 | 218 Buchanan St | Build Group Inc. | arch pa revision 2012-0905-6006s3 for idf closet location identification. upgrading battery storage rooms with 2 hour ratingDetails
arch pa revision 2012-0905-6006s3 for idf closet location identification. upgrading battery storage rooms with 2 hour rating | |
| Nov 2, 2015 | Never finaled issued Nov 2016, no final | 88 Arkansas St | James E Roberts-Obayashi Corporation | to erect 5 stories, 1 basement, 127 dwelling units, mix use with commericial, maher ordinance.Details
to erect 5 stories, 1 basement, 127 dwelling units, mix use with commericial, maher ordinance. | $46,100,000 |
| Apr 8, 2015 | Never finaled issued Apr 2015, no final | 1645 Pacific Av | Cahill Const Service Inc | add new guardrail to the south roof in order to comply with osha requirements for window washing equipment. ref pa# 2011/10/14/6841. guard rail only for osha safety requirments; no new roof deck proposed or additional changes.Details
add new guardrail to the south roof in order to comply with osha requirements for window washing equipment. ref pa# 2011/10/14/6841. guard rail only for osha safety requirments; no new roof deck proposed or additional changes. | $70,000 |
| Mar 26, 2015 | Completed final sign-off Jan 2018 | 100 Buchanan St | Build Group Inc. | revision to 20120905099005 s3 to include ti of leasing office (room b-105 only) sprinklers and fire alarm separate.Details
revision to 20120905099005 s3 to include ti of leasing office (room b-105 only) sprinklers and fire alarm separate. | $10,000 |
| Feb 13, 2015 | Never finaled issued Feb 2015, no final | 1645 Pacific Av | Cahill Contractors Inc | erect (1) non-electric double faced projecting signs. n/a maher ordinanceDetails
erect (1) non-electric double faced projecting signs. n/a maher ordinance | $1,000 |
| Jan 28, 2015 | Expired or cancelled withdrawn Jan 2015 | 1140 Folsom St | erect 6 stories of 111 dwelling unit.Details
erect 6 stories of 111 dwelling unit. | $19,500,000 | |
| Jan 16, 2015 | Expired or cancelled expired Jun 2019 | 700 Marina Bl | Stroub Construction | voluntary ada compliance upgrade of two existing bathrooms within the same space as existing bathrooms. new lighting & controls ot comply with new state of calif. ref'd.Details
voluntary ada compliance upgrade of two existing bathrooms within the same space as existing bathrooms. new lighting & controls ot comply with new state of calif. ref'd. | $46,000 |
| Nov 10, 2014 | Completed final sign-off Dec 2017 | 1140 Folsom St | erect 6-story, 1 basement, type 1, 3, 5, retail, parking, 112 residential units building. compliance w/ oridinance no 155-13 exempted.Details
erect 6-story, 1 basement, type 1, 3, 5, retail, parking, 112 residential units building. compliance w/ oridinance no 155-13 exempted. | $16,385,000 | |
| Sep 19, 2014 | Completed final sign-off Jun 2016 | 229 Haight St | Build Group Inc. | final below market rate unit location and notice of special resetrictions recordation. for record purposes only. no work.Details
final below market rate unit location and notice of special resetrictions recordation. for record purposes only. no work. | |
| Jul 22, 2014 | Never finaled issued Jul 2014, no final | 218 Buchanan St | Build Group Inc. | revision to appl #2013.0717.2033 for fire review & approval only to cut & cap utitity lines at property line (missed route from previous permit).Details
revision to appl #2013.0717.2033 for fire review & approval only to cut & cap utitity lines at property line (missed route from previous permit). | |
| Mar 7, 2014 | Completed final sign-off Jun 2016 | 229 Haight St | Build Group Inc. | mep work associated with building remodel under pa#201308305692.Details
mep work associated with building remodel under pa#201308305692. | $2,000,000 |
| Feb 5, 2014 | Completed final sign-off Aug 2014 | 639 Howard St | The Fine European Construction/Uwb Dober | replace non-compliant toilet room & coffee area with new ada compliant bathrooms & coffee area (same fixture count). barrier removal project, add new compliant electrical & lighting to meet state energy compliance. (m.e.p. under separate permit.)Details
replace non-compliant toilet room & coffee area with new ada compliant bathrooms & coffee area (same fixture count). barrier removal project, add new compliant electrical & lighting to meet state energy compliance. (m.e.p. under separate permit.) | $168,000 |
| Aug 30, 2013 | Completed final sign-off Jun 2016 | 229 Haight St | Build Group Inc. | change of occupancy. from b to r-2 and a-3. exterior demo window & door openings. interior structural demo & voluntary seismic upgrades of roof and wall stiffening at new 3Details
change of occupancy. from b to r-2 and a-3. exterior demo window & door openings. interior structural demo & voluntary seismic upgrades of roof and wall stiffening at new 3 | $3,500,000 |
| Jul 17, 2013 | Expired or cancelled expired Jan 2018 | 218 Buchanan St | Build Group Inc. | site cleaning, work to include removal of concrete walks, asphalt pavement, brick/pavers, concrete lip/gutters, landscaping, walls and curbs.Details
site cleaning, work to include removal of concrete walks, asphalt pavement, brick/pavers, concrete lip/gutters, landscaping, walls and curbs. | $70,000 |
| Jul 17, 2013 | Expired or cancelled expired Jun 2016 | 229 Haight St | Build Group Inc. | interior non-structural demolition at basement level, 1/f & 2/f. all work to comply with ab-017. maintain exiting per chapter 10, sfbc '2010.Details
interior non-structural demolition at basement level, 1/f & 2/f. all work to comply with ab-017. maintain exiting per chapter 10, sfbc '2010. | $100,000 |
| Jun 25, 2013 | Completed final sign-off Jan 2019 | 1 Henry Adams St | to erect 6 stories, no basement, 156 residential units with retail, parking, mixed use building.Details
to erect 6 stories, no basement, 156 residential units with retail, parking, mixed use building. | $40,000,000 | |
| Jun 25, 2013 | Completed final sign-off Oct 2019 | 1 Henry Adams St | to erect 6 stories, no basement, 85 units residential with retail & parking building.Details
to erect 6 stories, no basement, 85 units residential with retail & parking building. | $20,000,000 | |
| May 2, 2013 | Completed final sign-off Jun 2016 | 229 Haight St | repair & replace existing exterior windows. add new windows as indicated on drawings.Details
repair & replace existing exterior windows. add new windows as indicated on drawings. | $125,000 | |
| Feb 15, 2013 | Never finaled issued Jul 2013, no final | 218 Buchanan St | Build Group Inc. | to demolish 1 story gymnasium building.Details
to demolish 1 story gymnasium building. | $20,000 |
| Sep 5, 2012 | Completed final sign-off Jan 2018 | 100 Buchanan St | Build Group Inc. | bldg 1 - erect 4 story, 2 basement, 116 dwelling units with parking building.Details
bldg 1 - erect 4 story, 2 basement, 116 dwelling units with parking building. | $21,500,000 |
| Sep 5, 2012 | Completed final sign-off Jan 2018 | 218 Buchanan St | Build Group Inc. | bldg 2 - erect 6 story, 2 basement, 191 dwelling units with parking building.Details
bldg 2 - erect 6 story, 2 basement, 191 dwelling units with parking building. | $22,700,000 |
| May 25, 2011 | Completed final sign-off Sep 2011 | 1 Maritime Pz | Bcci Construction Company | tenant improvement on the 22nd floor including minor demolition, new partitions lighting doors and bathroom upgrades to full compliance. life sfaety and sprinklers separate permitDetails
tenant improvement on the 22nd floor including minor demolition, new partitions lighting doors and bathroom upgrades to full compliance. life sfaety and sprinklers separate permit | $480,000 |
| Oct 20, 2008 | Never finaled issued Oct 2008, no final | 700 Marina Bl | renovation of 2 upstairs dining rooms. addition of 1 unisex accessible toilet facility. mep separate permit. sprinklers & life safety seperate permit. change of occupant load.Details
renovation of 2 upstairs dining rooms. addition of 1 unisex accessible toilet facility. mep separate permit. sprinklers & life safety seperate permit. change of occupant load. | $360,000 |