James Dyer
- License
- M25378
- Mechanical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up M25378 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Edesignc Incorporated
- Based in
- San Francisco
- On San Francisco permits
- Oct 2023 to Aug 2025
2 permits since 2000 (engineer on 2 permits): 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Guzman Construction Group Inc., Robert L Brown Construction Inc., Singular Builders
- Architects
- Christian Niel Haegglund, Steve Rajniger
- Engineers
- Stephen Howarter (2), Ben H. Au, Bruce Douglas, Syliva Petta
- Authorized agents
- Andrew Bareto
- Subcontractors
- Anthony Joseph Rodondi
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 0
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 25, 2025 | In progress issued Aug 2026 | 301 14th Av | Singular Builders, Robert L Brown Construction Inc. | new security gate, entry stairs, accessible ramps, planters and landscaping at 15th ave entrance; new landscaping at enclosed front patio and central courtyard (improved permeability and play areas); new stairs and accessible ramp connecting preschool to existing 2f terrace & to 14th ave.Details
new security gate, entry stairs, accessible ramps, planters and landscaping at 15th ave entrance; new landscaping at enclosed front patio and central courtyard (improved permeability and play areas); new stairs and accessible ramp connecting preschool to existing 2f terrace & to 14th ave. | $3,000,000 |
| Oct 25, 2023 | In progress issued Jul 2024 | 3300 Mission St | Guzman Construction Group Inc. | priority processing: new 6-story type iiia over type 1a mixed-use bldg with 35 studio units (100% affordable housing mayor ed 13-01), residential community space, and commercial/retail space on 1st floor. preserve (e) 2-story facade along mission st and 29th st.Details
priority processing: new 6-story type iiia over type 1a mixed-use bldg with 35 studio units (100% affordable housing mayor ed 13-01), residential community space, and commercial/retail space on 1st floor. preserve (e) 2-story facade along mission st and 29th st. | $17,000,000 |