Block 1446, lot 054
301 14th Ave
- City’s use
- Commercial Misc
- Rooms
- 20 bathrooms
- Building
- 31,636 sq ft
- Lot
- 22,862 sq ft
- Zoning
- NA
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
25 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 6, 2026 | In progress issued May 2026 | 301 14th Av | Singular Builders | revision to 202512111503 to allow for the use of starc lite barrier demountable partitions,in lieu of approved framed partitions. alterations at partitions locations are temporary. the use fits with the intended temporary nature of walls.Details
revision to 202512111503 to allow for the use of starc lite barrier demountable partitions,in lieu of approved framed partitions. alterations at partitions locations are temporary. the use fits with the intended temporary nature of walls. | |
| Jan 5, 2026 | In progress issued Apr 2026 | 301 14th Av | Singular Builders | provide temp presschool location during construction under pa 202508082684.remove 3 int partitions,erect 5 partitions with4 int doors.infill (e) sunken floor with new framing.provide new toilet compartment privacy screen at (e) restroom. no change to l/s & meps.Details
provide temp presschool location during construction under pa 202508082684.remove 3 int partitions,erect 5 partitions with4 int doors.infill (e) sunken floor with new framing.provide new toilet compartment privacy screen at (e) restroom. no change to l/s & meps. | $48,000 |
| Aug 25, 2025 | In progress issued Aug 2026 | 301 14th Av | Singular Builders, Robert L Brown Construction Inc. | new security gate, entry stairs, accessible ramps, planters and landscaping at 15th ave entrance; new landscaping at enclosed front patio and central courtyard (improved permeability and play areas); new stairs and accessible ramp connecting preschool to existing 2f terrace & to 14th ave.Details
new security gate, entry stairs, accessible ramps, planters and landscaping at 15th ave entrance; new landscaping at enclosed front patio and central courtyard (improved permeability and play areas); new stairs and accessible ramp connecting preschool to existing 2f terrace & to 14th ave. | $3,000,000 |
| Mar 24, 2015 | Completed final sign-off Jul 2015 | 301 14th Av | Above All Roofing Solutions, Inc | re-roofingDetails
re-roofing | $25,937 |
| Mar 21, 2014 | Completed final sign-off Apr 2014 | 301 14th Av | Aura Fire Safety Inc | sprinkler tennant improvement. add (96) new sprinklers to existing risers for full coverage area per nfpa 13.Details
sprinkler tennant improvement. add (96) new sprinklers to existing risers for full coverage area per nfpa 13. | $18,000 |
| Mar 25, 2013 | Completed final sign-off Aug 2013 | 301 14th Av | Fahan Construction | replace about 30 windows with double pane glass, repl window casing that may have dry rot, repainting new window casing. there is no change in appearance & no structural improvements, materials and operation. to remain the same, u factor for windows is .77 (no bars on windows allowed)Details
replace about 30 windows with double pane glass, repl window casing that may have dry rot, repainting new window casing. there is no change in appearance & no structural improvements, materials and operation. to remain the same, u factor for windows is .77 (no bars on windows allowed) | $35,000 |
| Mar 21, 2011 | Completed final sign-off May 2012 | 301 14th Av | C. Overaa & Co | revision to pa# 2005.11.29.9071 to reconstruct seating arrangments for ada purposes. incl. removing 10 rows of chairs and 6 aisle stairways to yield an even rise and run. relocate 3 seating platforms. reinstalling fire rows of seat onto 3 relocated. reinforce 2 (e) seating platform w/ new steel.Details
revision to pa# 2005.11.29.9071 to reconstruct seating arrangments for ada purposes. incl. removing 10 rows of chairs and 6 aisle stairways to yield an even rise and run. relocate 3 seating platforms. reinstalling fire rows of seat onto 3 relocated. reinforce 2 (e) seating platform w/ new steel. | $1,000 |
| May 4, 2010 | Completed final sign-off Jul 2010 | 301 14th Av | C. Overaa & Co | hvac repair work to include (n) air source heat pump, vav boxes, exhaust fans, heating coil and hot water boiler.Details
hvac repair work to include (n) air source heat pump, vav boxes, exhaust fans, heating coil and hot water boiler. | $202,151 |
| Jun 26, 2008 | Never finaled issued Jun 2008, no final | 301 14th Av | ground floor - rear portion of bldg facing 15th avenue-new 90 minute door to comply with requirements for communicating opening at imaginary property line between new construction and (e) building. this door is not an exit.Details
ground floor - rear portion of bldg facing 15th avenue-new 90 minute door to comply with requirements for communicating opening at imaginary property line between new construction and (e) building. this door is not an exit. | $450 | |
| Jun 25, 2008 | Expired or cancelled cancelled Jan 2026 | 301 14th Av | revision to application 200511299071 to have ab-010 become part of the approved plans.Details
revision to application 200511299071 to have ab-010 become part of the approved plans. | ||
| May 5, 2008 | Never finaled issued May 2008, no final | 301 14th Av | renew pa#200611066988 for final only.Details
renew pa#200611066988 for final only. | ||
| May 5, 2008 | Never finaled issued May 2008, no final | 301 14th Av | renew pa#200710306826,#200607217299 for final only.Details
renew pa#200710306826,#200607217299 for final only. | ||
| Apr 23, 2008 | Never finaled issued Apr 2008, no final | 301 14th Av | street space permit.Details
street space permit. | ||
| Apr 23, 2008 | Never finaled issued Apr 2008, no final | 301 14th Av | street space permit.Details
street space permit. | ||
| Mar 13, 2008 | Completed final sign-off Oct 2008 | 301 14th Av | revision to work under construction 200511299071, correct assembly loading calculations to reflect accurate capacities for conference rm 110 and meeting room 114. refer to meeting notes attached, 2-29-08Details
revision to work under construction 200511299071, correct assembly loading calculations to reflect accurate capacities for conference rm 110 and meeting room 114. refer to meeting notes attached, 2-29-08 | ||
| Nov 28, 2007 | Completed final sign-off Oct 2008 | 301 14th Av | finish-out mechanical & plumbing work required for kitchen equipment in issued bpn # 2005/1129/9071.Details
finish-out mechanical & plumbing work required for kitchen equipment in issued bpn # 2005/1129/9071. | $75,000 | |
| Oct 30, 2007 | Completed final sign-off Oct 2008 | 301 14th Av | Master Protection Corp. | hook up ansul fire suppression system to pre-piped hoodDetails
hook up ansul fire suppression system to pre-piped hood | $942 |
| Jan 31, 2007 | Expired or cancelled expired Feb 2009 | 301 14th Av | All Guard Alarm Sys. Inc. | fire alarm system and fire spkr. monitoring system.Details
fire alarm system and fire spkr. monitoring system. | $35,000 |
| Nov 6, 2006 | Completed final sign-off Oct 2008 | 301 14th Av | soldier pile shoring west side excavation. underpinning (e) building on west side of site. relocation soldierpiles south side onto site.Details
soldier pile shoring west side excavation. underpinning (e) building on west side of site. relocation soldierpiles south side onto site. | $12,000 | |
| Jul 21, 2006 | Completed final sign-off Oct 2008 | 301 14th Av | Westates Mechanical Corporation Inc | install new fire sprinkler system throughout new building start at flange 1'-0" above new conc. floor.Details
install new fire sprinkler system throughout new building start at flange 1'-0" above new conc. floor. | $55,000 |
| Jun 22, 2006 | Completed final sign-off Aug 2007 | 301 14th Av | C. Overaa & Co | grading. clearing site, excavate areas as needed to accommodate foundations, utilities preparation of subgrade, compacting, bottom of excavated areas will be scarified & recompacted per soils report.Details
grading. clearing site, excavate areas as needed to accommodate foundations, utilities preparation of subgrade, compacting, bottom of excavated areas will be scarified & recompacted per soils report. | $50,000 |
| Jan 30, 2006 | Completed final sign-off Oct 2008 | 323 14th Av | C. Overaa & Co | to demolish 4 story, religous assembly bldg.Details
to demolish 4 story, religous assembly bldg. | |
| Jan 30, 2006 | Completed final sign-off Oct 2008 | 319 14th Av | C. Overaa & Co | to demolish 2 story reglious assembly.Details
to demolish 2 story reglious assembly. | |
| Nov 29, 2005 | Completed final sign-off Oct 2008 | 301 14th Av | C. Overaa & Co | erect a 2 stories of asembly, office.Details
erect a 2 stories of asembly, office. | $5,500,000 |
| Jun 15, 2005 | Completed final sign-off Aug 2007 | 301 14th Av | C. Overaa & Co | demolish 2 stories, sanctuary.Details
demolish 2 stories, sanctuary. |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.