John Wilson
- Listed as
- engineer
- Firm
- Wilson Engineering
- Based in
- Sf
- On San Francisco permits
- Jun 2006 to May 2019
2 permits since 2000 (engineer on 2 permits): 2 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 24, 2019 | Completed final sign-off Jun 2020 | 658 15th Av | Ramlochan Construction | remove wall between dining rm and kitchen, remove wall between sitting rm and kitchen/dining rm. install a beam of e removed wall in order to carry load of the 2nd story load/joists. rebuild garage stairs. redesign kitchen cabnts with a new elec layout. legalize gr fl full bathDetails
remove wall between dining rm and kitchen, remove wall between sitting rm and kitchen/dining rm. install a beam of e removed wall in order to carry load of the 2nd story load/joists. rebuild garage stairs. redesign kitchen cabnts with a new elec layout. legalize gr fl full bath | $52,000 |
| Jun 22, 2006 | Completed final sign-off Aug 2007 | 301 14th Av | C. Overaa & Co | grading. clearing site, excavate areas as needed to accommodate foundations, utilities preparation of subgrade, compacting, bottom of excavated areas will be scarified & recompacted per soils report.Details
grading. clearing site, excavate areas as needed to accommodate foundations, utilities preparation of subgrade, compacting, bottom of excavated areas will be scarified & recompacted per soils report. | $50,000 |