Block 0900, lot 002
700 Marina Bl
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
20 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 7, 2024 | In progress issued Oct 2024 | 700 Marina Bl | Pioneer Fire Inc. | 1/f: relocate (12) pendents. gc ti# 202405101886Details
1/f: relocate (12) pendents. gc ti# 202405101886 | $5,500 |
| Apr 4, 2022 | Completed final sign-off Apr 2022 | 700 Marina Bl | O'connor Plumbing & Fire Protection | provide 9 new fire sprinkler heads per new ti. ref permit 202108257132Details
provide 9 new fire sprinkler heads per new ti. ref permit 202108257132 | $9,000 |
| Aug 25, 2021 | Never finaled issued Oct 2021, no final | 700 Marina Bl | Justin Farrelly Incorporated | minor interior renovation: meeting room at south eash corner of ground floor. remove and replace interior non bearing walls and all finishes and fixtures. no exterior alterations. no structural alterations.Details
minor interior renovation: meeting room at south eash corner of ground floor. remove and replace interior non bearing walls and all finishes and fixtures. no exterior alterations. no structural alterations. | $73,280 |
| Apr 22, 2019 | Completed final sign-off Jun 2019 | 700 Marina Bl | Stroub Construction | to obtain final inspection for approved under pa #201501165981. all work is complete.Details
to obtain final inspection for approved under pa #201501165981. all work is complete. | |
| Jul 17, 2015 | Completed final sign-off Sep 2015 | 700 Marina Bl | D E A Security Systems Co Inc | add fire alarm devices to new bathrooms. add 4 strobes and 2 speaker strobes.Details
add fire alarm devices to new bathrooms. add 4 strobes and 2 speaker strobes. | $7,500 |
| May 21, 2015 | Completed final sign-off Aug 2015 | 700 Marina Bl | Pribuss Engineering Inc | 2nd floor: fire sprinkler t.i. under appl. 2015.0116.5981. relocating 6 heads.Details
2nd floor: fire sprinkler t.i. under appl. 2015.0116.5981. relocating 6 heads. | $3,088 |
| Apr 30, 2015 | Never finaled issued May 2015, no final | 700 Marina Bl | Justin Farrelly Incorporated | replace boiler in kindDetails
replace boiler in kind | $190,000 |
| Jan 16, 2015 | Expired or cancelled expired Jun 2019 | 700 Marina Bl | Stroub Construction | voluntary ada compliance upgrade of two existing bathrooms within the same space as existing bathrooms. new lighting & controls ot comply with new state of calif. ref'd.Details
voluntary ada compliance upgrade of two existing bathrooms within the same space as existing bathrooms. new lighting & controls ot comply with new state of calif. ref'd. | $46,000 |
| Dec 14, 2011 | Completed final sign-off Dec 2012 | 700 Marina Bl | M B V Systems | upgrade fire alarm system from convertional to addressable, upgrade audible & vieual alarm appliacnes to a voice system (more than 1000 occupants)Details
upgrade fire alarm system from convertional to addressable, upgrade audible & vieual alarm appliacnes to a voice system (more than 1000 occupants) | $21,000 |
| Jun 10, 2011 | Never finaled issued Dec 2011, no final | 700 Marina Bl | Dutra Construction Co Inc | fire only permit. new fire water line on new concrete decks for the san francisco west harbor marina renovation, extg auxiliary water supply system to remain. install new fire hose cabinets on docks at a maximum 100 feet seperation.Details
fire only permit. new fire water line on new concrete decks for the san francisco west harbor marina renovation, extg auxiliary water supply system to remain. install new fire hose cabinets on docks at a maximum 100 feet seperation. | $2,000,000 |
| Mar 8, 2011 | Completed final sign-off May 2011 | 700 Marina Bl | M B V Systems | add fire audible visual appliance to fire alarm system for remodeled clipper room. add 5 horn/strobe appliances, add 1 power supply booster.Details
add fire audible visual appliance to fire alarm system for remodeled clipper room. add 5 horn/strobe appliances, add 1 power supply booster. | $1,100 |
| Mar 8, 2011 | Completed final sign-off May 2011 | 700 Marina Bl | Stroub Construction | per app#200906049744. addition of title 24. building energy analysis for lighting. requiested by bldg inspector for project now under construction.Details
per app#200906049744. addition of title 24. building energy analysis for lighting. requiested by bldg inspector for project now under construction. | |
| Jan 12, 2011 | Never finaled issued Jan 2011, no final | 700 Marina Bl | Plumbworks Inc. /Chris Goodwin Plumbing | relocate 13 fire sprinkler heads on 2nd floor.work related to pa# 3008.10.20.4647 and 2009.06.04.9744Details
relocate 13 fire sprinkler heads on 2nd floor.work related to pa# 3008.10.20.4647 and 2009.06.04.9744 | $7,000 |
| Jun 4, 2009 | Completed final sign-off May 2011 | 700 Marina Bl | revision to pa# 2008-1020-4647-reduction of scope of work-no unisex toilet facility, no base/chair/crown mouldings, no demo at partial height wall & associated electric work, reduction in millwork scope- change of occupant loadDetails
revision to pa# 2008-1020-4647-reduction of scope of work-no unisex toilet facility, no base/chair/crown mouldings, no demo at partial height wall & associated electric work, reduction in millwork scope- change of occupant load | ||
| Dec 4, 2008 | Never finaled issued Dec 2008, no final | 700 Marina Bl | Fire Sentry Protection Services | upgrade kitchen exhaust hood to ul300 code (fire system)Details
upgrade kitchen exhaust hood to ul300 code (fire system) | $5,400 |
| Oct 20, 2008 | Never finaled issued Oct 2008, no final | 700 Marina Bl | renovation of 2 upstairs dining rooms. addition of 1 unisex accessible toilet facility. mep separate permit. sprinklers & life safety seperate permit. change of occupant load.Details
renovation of 2 upstairs dining rooms. addition of 1 unisex accessible toilet facility. mep separate permit. sprinklers & life safety seperate permit. change of occupant load. | $360,000 | |
| Jun 30, 2008 | Never finaled issued Jul 2008, no final | 700 Marina Bl | M B V Systems | ti for fire alarm on the ground floor. add 2 strobes and 2 horn strobesDetails
ti for fire alarm on the ground floor. add 2 strobes and 2 horn strobes | $600 |
| Apr 22, 2008 | Never finaled issued Apr 2008, no final | 700 Marina Bl | Plumbworks Inc. /Chris Goodwin Plumbing | sprinkler ti in the golden gate room. add 12 new sprinkler heads and relocate 6 headsDetails
sprinkler ti in the golden gate room. add 12 new sprinkler heads and relocate 6 heads | $5,000 |
| Jan 14, 2008 | Completed final sign-off Aug 2008 | 700 Marina Bl | remodel of meeting room, ada upgrade to restroom facilites, new curb ramp to provide new exterior access path to front entrance, 2 new accessable parking space and construct new curb for planting.Details
remodel of meeting room, ada upgrade to restroom facilites, new curb ramp to provide new exterior access path to front entrance, 2 new accessable parking space and construct new curb for planting. | $300,000 | |
| Jul 31, 2003 | Completed final sign-off Aug 2003 | 700 Marina Bl | Bryson Roofing Inc | remove existing built-proffing. install 4 ply built up roof. ( gr surface) class aDetails
remove existing built-proffing. install 4 ply built up roof. ( gr surface) class a | $18,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.