Susan E Mccomb
- Listed as
- architect
- Firm
- Bar Architects
- Based in
- San Francisco
- On San Francisco permits
- Jan 2007 to Jan 2021
15 permits since 2000 (architect on 15 permits): 6 completed, 6 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 15, 2021 | Completed final sign-off Mar 2023 | 180 Townsend St | Rossi Builders Inc. | in-kind door replacement of qualifying historic building.Details
in-kind door replacement of qualifying historic building. | $50,000 |
| Jan 8, 2021 | Expired or cancelled cancelled Jan 2026 | 1231 Market St | rehabilitation to (e) elevators 1 & 2 within an (e) shaft. improve fire rating, mech stems and structural intergrity of shaft. custom elevator equp to fit withing (e) shaft & repair surrounding finishes. size of elevator will not alter preserve historic condition.Details
rehabilitation to (e) elevators 1 & 2 within an (e) shaft. improve fire rating, mech stems and structural intergrity of shaft. custom elevator equp to fit withing (e) shaft & repair surrounding finishes. size of elevator will not alter preserve historic condition. | $160,000 | |
| Sep 24, 2019 | Completed final sign-off Nov 2019 | 1231 Market St | Suffolk Constr Co. Inc. Dba Suffolk-Roel | 7th flr - new finishes & fixtures within 2 rooms of the 459 room hotel in order to test new hotel operationsl standards. demising and corridor walls are to remain in place as is. new plm fixtures, mech units and finishes will be applied to the interior of the toom. exterior shall not be alteredDetails
7th flr - new finishes & fixtures within 2 rooms of the 459 room hotel in order to test new hotel operationsl standards. demising and corridor walls are to remain in place as is. new plm fixtures, mech units and finishes will be applied to the interior of the toom. exterior shall not be altered | $20,000 |
| Jul 31, 2019 | Completed final sign-off Nov 2019 | 180 Townsend St | Aquamatic Fire Protection | add 2 plugs for 2 fire sprinklers. add branch line restraints. no underground work. ref pa 2019-0211-2601Details
add 2 plugs for 2 fire sprinklers. add branch line restraints. no underground work. ref pa 2019-0211-2601 | $7,000 |
| Jun 11, 2019 | Expired or cancelled cancelled Jan 2026 | 180 Townsend St | lobby level - finish changes with minor associated changes ti mechanical systems; upgrade lighting in stair shaftDetails
lobby level - finish changes with minor associated changes ti mechanical systems; upgrade lighting in stair shaft | $85,000 | |
| Feb 11, 2019 | Completed final sign-off Aug 2021 | 180 Townsend St | Rossi Builders Inc. | elevator modernization of qualifying historic building. elevator 1: cosmetic, hvac, electrical and equipment upgrades only. no arch or structural work. elevator 2: rebuilding shaft walls, replacing one elevator can, associated structural, mechanical, electrical work.Details
elevator modernization of qualifying historic building. elevator 1: cosmetic, hvac, electrical and equipment upgrades only. no arch or structural work. elevator 2: rebuilding shaft walls, replacing one elevator can, associated structural, mechanical, electrical work. | $552,325 |
| Dec 20, 2018 | Never finaled issued Mar 2022, no final | 1095 Market St | build-out tenant space restrooms. mep under seperate permitDetails
build-out tenant space restrooms. mep under seperate permit | $20,000 | |
| Jul 17, 2018 | Never finaled issued Sep 2018, no final | 180 Townsend St | Rossi Builders Inc. | replacement of mechanical system at rooftop. minor structural change to support mechanical equipment. ** maher: n/a **Details
replacement of mechanical system at rooftop. minor structural change to support mechanical equipment. ** maher: n/a ** | $415,000 |
| Jun 26, 2017 | Never finaled issued Nov 2021, no final | 1095 Market St | Skanska Usa Building Inc, Plant Construction Co, Lp | revision to app#201409116118-s2. changes to rooftop support, roofing, plumbing & electrical system to accomodate lounge uses, furnishings, landscaping & equipment. changes required per planning dept. no change of occupancy. no change of use. no change of egress. n/a for maherDetails
revision to app#201409116118-s2. changes to rooftop support, roofing, plumbing & electrical system to accomodate lounge uses, furnishings, landscaping & equipment. changes required per planning dept. no change of occupancy. no change of use. no change of egress. n/a for maher | $1,000 |
| Jun 1, 2017 | Expired or cancelled expired Jun 2021 | 1095 Market St | revision to pa #201409116118/s2 - change to ground level exterior storefront due to uforseen existing condition. n/a maher ordinanceDetails
revision to pa #201409116118/s2 - change to ground level exterior storefront due to uforseen existing condition. n/a maher ordinance | ||
| Sep 11, 2014 | Completed final sign-off Sep 2021 | 1095 Market St | Skanska Usa Building Inc, Plant Construction Co, Lp | change of occupancy from office to hotel. new 203 hotel rooms. new roof deck. add new story within (e) structure. new stairs & elevator. ** maher: compliance with ordinance no# 155-13 not required **Details
change of occupancy from office to hotel. new 203 hotel rooms. new roof deck. add new story within (e) structure. new stairs & elevator. ** maher: compliance with ordinance no# 155-13 not required ** | $9,650,000 |
| Aug 26, 2014 | Completed final sign-off Jun 2021 | 1095 Market St | Skanska Usa Building Inc, Build Group Inc. | interior non-structural demo on all floors, remove walls and ceilings as indicated on drawings; maher n/aDetails
interior non-structural demo on all floors, remove walls and ceilings as indicated on drawings; maher n/a | $75,000 |
| Jan 24, 2007 | Never finaled issued Jan 2007, no final | 865 Market St | vacant space soft demo non-structural.Details
vacant space soft demo non-structural. | $10,000 | |
| Jan 12, 2007 | Never finaled issued May 2007, no final | 865 Market St | unit# 412. alteration to (e) entrance on market street side only. (alteration to (e) canopy & sign only)Details
unit# 412. alteration to (e) entrance on market street side only. (alteration to (e) canopy & sign only) | $20,000 | |
| Jan 12, 2007 | Never finaled issued Mar 2007, no final | 865 Market St | suite# 412. interior alteration to (e) space. demo, mechanical, electrical, plumbing. new layout of sales area, new mall storfront with new display area. new handicap counter. new locker / change room for employees. millwork. shelves. new accessible bathroom for employees. addition to (e) mezzanineDetails
suite# 412. interior alteration to (e) space. demo, mechanical, electrical, plumbing. new layout of sales area, new mall storfront with new display area. new handicap counter. new locker / change room for employees. millwork. shelves. new accessible bathroom for employees. addition to (e) mezzanine | $850,000 |