18 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 3, 2014 | Never finaled issued Apr 2014, no final | 325 Berry St | street spaceDetails
street space | ||
| May 2, 2013 | Completed final sign-off Sep 2013 | 325 Berry St | Saarman Construction,Ltd. | revision to permit app#201303122038 to perform repairs to structural slab and install access panel.Details
revision to permit app#201303122038 to perform repairs to structural slab and install access panel. | $6,000 |
| Mar 12, 2013 | Completed final sign-off Sep 2013 | 325 Berry St | Saarman Construction,Ltd. | demo 4'x4' section in garage concrete slab to facilitate plmg repairs at ext waste line. repairs to be determined and re subitted to bldg department for approval. possible structural slab . required engineers evaluation for replacement.Details
demo 4'x4' section in garage concrete slab to facilitate plmg repairs at ext waste line. repairs to be determined and re subitted to bldg department for approval. possible structural slab . required engineers evaluation for replacement. | $58,036 |
| Aug 30, 2012 | Completed final sign-off Sep 2013 | 325 Berry St | Saarman Construction,Ltd. | revision to 201208010290. revise pg 2.3 add name of epoxy. add special inspection per inspectorDetails
revision to 201208010290. revise pg 2.3 add name of epoxy. add special inspection per inspector | |
| Jul 14, 2008 | Completed final sign-off Oct 2008 | 325 Berry St | O W R Construction Inc | removal of existing front doors and replace with sliding front door on the ground floor lobbyDetails
removal of existing front doors and replace with sliding front door on the ground floor lobby | $10,000 |
| Jun 20, 2007 | Never finaled issued Jun 2007, no final | 325 Berry St | street space permitDetails
street space permit | ||
| Jun 7, 2007 | Completed final sign-off Oct 2007 | 325 Berry St | provide bollards - west elevator, fire pump room, van accessible space, sand/oil interceptor pit. chainlink fence around sand/oil interceptor pit. additional striping in garage.Details
provide bollards - west elevator, fire pump room, van accessible space, sand/oil interceptor pit. chainlink fence around sand/oil interceptor pit. additional striping in garage. | $4,000 | |
| Mar 15, 2007 | Expired or cancelled expired May 2009 | 325 Berry St | new electric generator installed on roof with fuel oil piping and detection systems.Details
new electric generator installed on roof with fuel oil piping and detection systems. | $125,000 | |
| Feb 23, 2007 | Never finaled issued Feb 2007, no final | 325 Berry St | streetspaceDetails
streetspace | ||
| Feb 6, 2007 | Completed final sign-off Oct 2007 | 325 Berry St | clarificatio of fire stop detial at demising wall intersection with gfrc pannel per dbi inspector's request revision to approved pa#200504180213s-3.Details
clarificatio of fire stop detial at demising wall intersection with gfrc pannel per dbi inspector's request revision to approved pa#200504180213s-3. | ||
| Mar 14, 2006 | Completed final sign-off Oct 2007 | 325 Berry St | Superior Automatic Sprinkler | new fire service underground & stub-up to a flange above slab in fire pump room @ parnking s-3 area.Details
new fire service underground & stub-up to a flange above slab in fire pump room @ parnking s-3 area. | $5,000 |
| Dec 19, 2005 | Completed final sign-off Oct 2007 | 325 Berry St | erect tower crane(crane footing approved under 200504180213's1)Details
erect tower crane(crane footing approved under 200504180213's1) | $19,500 | |
| Oct 24, 2005 | Never finaled issued Oct 2005, no final | 315 Berry St | additional house number permitDetails
additional house number permit | ||
| Oct 17, 2005 | Completed final sign-off Oct 2007 | 325 Berry St | Fire Detection Unlimited | fire alarm system. notification appliances: horns in living areas. strobe & horn strobe coverage in all corridors & common areas. smoke detection provided in common areas & corridors & elec. rooms. duct detectors shall be monitored. water flow & temper shall be monitored control of fsd's & elevatorDetails
fire alarm system. notification appliances: horns in living areas. strobe & horn strobe coverage in all corridors & common areas. smoke detection provided in common areas & corridors & elec. rooms. duct detectors shall be monitored. water flow & temper shall be monitored control of fsd's & elevator | $44,736 |
| Aug 5, 2005 | Completed final sign-off Oct 2007 | 325 Berry St | install 32 test piles on vacant lot.Details
install 32 test piles on vacant lot. | $170,000 | |
| Apr 29, 2005 | Completed final sign-off Oct 2007 | 325 Berry St | fill site with upto 2' of soil to prep & level site for new constructionDetails
fill site with upto 2' of soil to prep & level site for new construction | ||
| Apr 18, 2005 | Completed final sign-off Oct 2007 | 325 Berry St | to erect 7 stories 110 dwelling residential units.Details
to erect 7 stories 110 dwelling residential units. | $23,750,000 | |
| Feb 16, 2005 | Completed final sign-off Oct 2007 | 325 Berry St | install 8 indicator (test) piles on vacant lotDetails
install 8 indicator (test) piles on vacant lot | $60,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Saarman Construction,Ltd. (3), Fire Detection Unlimited, O W R Construction Inc, Superior Automatic Sprinkler
- Architects
- Robert Carli (2), Mike Leaderle
- Engineers
- Michael Lederle, Steven Ainsworth
- Pmt consultant/expediters
- Jacob Nguyen
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.