Block 3554, lot 005
1950 Mission St
- City’s use
- Multi-Family Residential
- Lot
- 36,398 sq ft
- Zoning
- RC4
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
36 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 22, 2025 | In progress issued Jul 2025 | 1950 Mission St | Ad Art Inc. | manufacture & install one wall sign. single faced, illuminated, "youth art exchange"Details
manufacture & install one wall sign. single faced, illuminated, "youth art exchange" | $10,000 |
| Oct 21, 2022 | Completed final sign-off Aug 2024 | 1950 Mission St | Plant Construction Co, Lp | (n) metal stud walls (interior) w/ gyp b, (n) interior doors, (n) office and kitchenette, utility sinks. interior ti to art studios. max 5 gl. total of darkroom chemical to be stored on site.Details
(n) metal stud walls (interior) w/ gyp b, (n) interior doors, (n) office and kitchenette, utility sinks. interior ti to art studios. max 5 gl. total of darkroom chemical to be stored on site. | $50,000 |
| Jun 10, 2022 | Completed final sign-off May 2024 | 1950 Mission St | (n) metal stud wall, interior create a storage room with doors, cabinets, and furred wall at (e) cone wall to hang out.Details
(n) metal stud wall, interior create a storage room with doors, cabinets, and furred wall at (e) cone wall to hang out. | $25,000 | |
| Nov 15, 2021 | Expired or cancelled cancelled Jan 2026 | 1950 Mission St | proposing a change of use of an (e) vacant commercial space from mercantile (m) occupancy to a business (b) occupancy as allowed under san francisco planning code section 754.tenant improvemts to follow under sep permit.Details
proposing a change of use of an (e) vacant commercial space from mercantile (m) occupancy to a business (b) occupancy as allowed under san francisco planning code section 754.tenant improvemts to follow under sep permit. | ||
| Apr 1, 2021 | Never finaled issued May 2021, no final | 1950 Mission St | Sabah International Incorporated | as-built for permit #2020-1109-8506 added final addresses for notification appliances, speakers and initiating devices. fsd relocated.Details
as-built for permit #2020-1109-8506 added final addresses for notification appliances, speakers and initiating devices. fsd relocated. | |
| Feb 4, 2021 | Never finaled issued Feb 2021, no final | 1954 Mission St | per pa #201609218371, add one commercial address to block 3554, lot 005 as: 1954 mission streetDetails
per pa #201609218371, add one commercial address to block 3554, lot 005 as: 1954 mission street | ||
| Jan 12, 2021 | Completed final sign-off Apr 2022 | 1950 Mission St | Guzman Construction Group Inc. | t.i. provide & install (n) demissing partition at vacant ground flr for bicycle repair shop. interior lighting, elec, & mech; kitchenetteDetails
t.i. provide & install (n) demissing partition at vacant ground flr for bicycle repair shop. interior lighting, elec, & mech; kitchenette | $32,000 |
| Nov 24, 2020 | Completed final sign-off Mar 2021 | 1950 Mission St | Pribuss Engineering Inc | modify sprinkler head locations to accomodate new ceiling & partition layout for new day care space. total sprinklers this project = 59. ref ti 2019-1231-1051.Details
modify sprinkler head locations to accomodate new ceiling & partition layout for new day care space. total sprinklers this project = 59. ref ti 2019-1231-1051. | $30,326 |
| Nov 9, 2020 | Never finaled issued Mar 2021, no final | 1950 Mission St | Sabah International Incorporated | ti# 2019-1231-1051 modify existing fire alarm system. add (1) booster power supply, (20) smoke detectors, (6) manual pull stations, (2) high power control relays, (4) led ceiling strobes, (16) led ceiling speaker/strobes.Details
ti# 2019-1231-1051 modify existing fire alarm system. add (1) booster power supply, (20) smoke detectors, (6) manual pull stations, (2) high power control relays, (4) led ceiling strobes, (16) led ceiling speaker/strobes. | $28,451 |
| Jun 26, 2020 | Never finaled issued Jun 2020, no final | 1950 Mission St | street spaceDetails
street space | ||
| Feb 7, 2020 | Never finaled issued Oct 2020, no final | 1950 Mission St | Solarix Systems | installation of a solar hot water heating system.Details
installation of a solar hot water heating system. | $220,000 |
| Dec 31, 2019 | Completed final sign-off Jun 2021 | 1950 Mission St | Guzman - Suffolk Jv Llc | tenant interior improvements. early care and education center/child care center.Details
tenant interior improvements. early care and education center/child care center. | $185,000 |
| Dec 12, 2019 | Never finaled issued Dec 2019, no final | 1950 Mission St | street spaceDetails
street space | ||
| Jun 19, 2019 | Completed final sign-off May 2021 | 1950 Mission St | Swinerton Builders | revision to s2 of pa #2016-0921-8371 (arch/mep/landscape/civil); switchgear room was removed from the project & replaced with the youth/media room; landscaping.Details
revision to s2 of pa #2016-0921-8371 (arch/mep/landscape/civil); switchgear room was removed from the project & replaced with the youth/media room; landscaping. | |
| Jun 14, 2019 | Never finaled issued Jun 2019, no final | 1950 Mission St | Swinerton Builders | street spaceDetails
street space | |
| Mar 22, 2019 | Completed final sign-off May 2021 | 1950 Mission St | Swinerton Builders | tower crane erection for construction of project. tower crane dismantelDetails
tower crane erection for construction of project. tower crane dismantel | $139,000 |
| Feb 6, 2019 | Completed final sign-off Jul 2020 | 1950 Mission St | Swinerton Builders | install test piles for auger cast deep foundations ref pa 2016-0921-8371 s. site remains vacant lot under this permit.Details
install test piles for auger cast deep foundations ref pa 2016-0921-8371 s. site remains vacant lot under this permit. | $55,000 |
| Jan 2, 2019 | Never finaled issued Jan 2019, no final | 1950 Mission St | street spaceDetails
street space | ||
| Oct 23, 2018 | Completed final sign-off Oct 2020 | 1950 Mission St | Value Fire Protection Inc | install new 6-inch fire service into building off of 8-inch main on mission st. per nfpa 13 & 24. sprinkler/standpipe installation under separate application.Details
install new 6-inch fire service into building off of 8-inch main on mission st. per nfpa 13 & 24. sprinkler/standpipe installation under separate application. | $11,500 |
| Sep 28, 2018 | Completed final sign-off Jul 2020 | 1950 Mission St | Swinerton Builders | temporary shoring & excavation for new construction. ref pa# 2016/09/21/8371-s.Details
temporary shoring & excavation for new construction. ref pa# 2016/09/21/8371-s. | $640,000 |
| May 24, 2018 | Completed final sign-off Apr 2019 | 1950 Mission St | Swinerton Builders | bldg #2. demolish 1-story institutional modular building #2Details
bldg #2. demolish 1-story institutional modular building #2 | $3,333 |
| May 24, 2018 | Completed final sign-off Apr 2019 | 1950 Mission St | Swinerton Builders | bldg #7. demolish 1-story, institutional modular building #7Details
bldg #7. demolish 1-story, institutional modular building #7 | $3,333 |
| May 24, 2018 | Completed final sign-off Apr 2019 | 1950 Mission St | Swinerton Builders | bldg #12. demolish 1-story, instutional modular building #12Details
bldg #12. demolish 1-story, instutional modular building #12 | $3,333 |
| May 24, 2018 | Completed final sign-off Apr 2019 | 1950 Mission St | Swinerton Builders | bldg #5. demolish 1-story, institutional modular building #5Details
bldg #5. demolish 1-story, institutional modular building #5 | $3,333 |
| May 24, 2018 | Completed final sign-off Apr 2019 | 1950 Mission St | Swinerton Builders | bldg #11. demolish 1-story, institutional modular building #11.Details
bldg #11. demolish 1-story, institutional modular building #11. | $3,333 |
| May 24, 2018 | Completed final sign-off Apr 2019 | 1950 Mission St | Swinerton Builders | bldg #4. demolish 1-story, institutional modular building #4Details
bldg #4. demolish 1-story, institutional modular building #4 | $3,333 |
| May 24, 2018 | Completed final sign-off Apr 2019 | 1950 Mission St | Swinerton Builders | bldg #6. demolish 1-story, institutional modular building#6Details
bldg #6. demolish 1-story, institutional modular building#6 | $3,333 |
| May 24, 2018 | Completed final sign-off Apr 2019 | 1950 Mission St | Swinerton Builders | bldg #3. demolish 1-story, institutional modular building #3Details
bldg #3. demolish 1-story, institutional modular building #3 | $3,333 |
| May 24, 2018 | Completed final sign-off Apr 2019 | 1950 Mission St | Swinerton Builders | bldg 10. demolish 1-story, institutional modular building #10Details
bldg 10. demolish 1-story, institutional modular building #10 | $3,333 |
| May 24, 2018 | Completed final sign-off Apr 2019 | 1950 Mission St | Swinerton Builders | bldg #8. demolish 1-story, institutional modular building #8Details
bldg #8. demolish 1-story, institutional modular building #8 | $3,333 |
| May 24, 2018 | Completed final sign-off Apr 2019 | 1950 Mission St | Swinerton Builders | bldg #1. demolish 1-story, institutional modular building #1.Details
bldg #1. demolish 1-story, institutional modular building #1. | $3,333 |
| May 24, 2018 | Completed final sign-off Apr 2019 | 1950 Mission St | Swinerton Builders | bldg #9. demolish 1-story, institutional modular building #9Details
bldg #9. demolish 1-story, institutional modular building #9 | $3,333 |
| Sep 21, 2016 | Completed final sign-off May 2021 | 1950 Mission St | mod. erect two type 1a buildings, one 9 story mixed use 93 unit residential building, and a 6 story mixed use 64 unit residential building with day care facilities, building function, offices, and commercial tenant spaces on the ground floorDetails
mod. erect two type 1a buildings, one 9 story mixed use 93 unit residential building, and a 6 story mixed use 64 unit residential building with day care facilities, building function, offices, and commercial tenant spaces on the ground floor | $60,000,000 | |
| Jan 14, 2015 | Never finaled issued Jan 2015, no final | 1950 Mission St | W. Wong Construction Co. Inc. | replace (e) bathroom, shower and laundry room fixtures.Details
replace (e) bathroom, shower and laundry room fixtures. | $30,000 |
| Nov 8, 2010 | Never finaled issued Nov 2010, no final | 1950 Mission St | add meter fee for m226712Details
add meter fee for m226712 | ||
| Oct 26, 2010 | Never finaled issued Oct 2010, no final | 1950 Mission St | street spaceDetails
street space |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Swinerton Builders (17), Sabah International Incorporated (2), Ad Art Inc., Guzman - Suffolk Jv Llc, Guzman Construction Group Inc., Plant Construction Co, Lp, Pribuss Engineering Inc, Solarix Systems, Value Fire Protection Inc, W. Wong Construction Co. Inc.
- Architects
- Caroline J. Souza (2), Daniel Simons (2), Anne M. Cervantes, David Baker Architects, Irving Gonzales
- Engineers
- Gregory Miller, Robert Cameron Glazier, Stephen Lau, Tipping Structural Engineers
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.