Permit 202608257099
100 Hooper St
rooftop adiabatic cooler installation w/ slab penetrations for piping to suite 15; replace glazing w/ mech louvers; modify mezzanine guardrail for gates.
- Outcome
- In progress (city status: filed, Sep 24, 2026)
- Filed
- Sep 24, 2026
- Declared cost
- $269,000
- Building use
- manufacturing
- Neighborhood
- Mission Bay (how long permits take there)
- Contractor
- None listed with a license number
- Property
- All permits at this address (block 3808, lot 015)