Charles Zhou Hui Li

License
66333
Board not determined from the city's record: no role or letter places this number
About the state's license search
Search the state's license records (not the contractors board)
Listed as
architect, engineer
Firm
Miyamoto
Based in
San Francisco
On San Francisco permits
Nov 2019 to Oct 2024

12 permits since 2000 (engineer on 10 permits, architect on 2 permits): 5 completed, 1 in progress, 6 never finaled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Swinerton Builders (5), Bcci Construction Company, Hathaway Dinwiddie Co.
Architects
Paul Cooper (4), Daniel Pamperin (3), John A. Chipman (3)
Engineers
Jason White (3), Larry Anderson (2), Scott Mulholland (2), Carolyn Searls

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Oct 29, 2024In progress
filed Oct 2024, not yet issued
2 Folsom St4th fl- installation of 6 single phone booths and associated electrical & structural. no change in occupancy, use or area
Details
Permit
202410293936

4th fl- installation of 6 single phone booths and associated electrical & structural. no change in occupancy, use or area

Open the permit page

$100,000
Sep 28, 2023Completed
final sign-off May 2024
2 Folsom StSwinerton Builders12/f: revision to pa# 202308295512, reduced scope of work no longer done in designed access
Details
Permit
202309287619
Permit issued
Nov 9, 2023
Final sign-off
May 21, 2024

12/f: revision to pa# 202308295512, reduced scope of work no longer done in designed access

Open the permit page

Sep 28, 2023Completed
final sign-off Apr 2024
2 Folsom StSwinerton Builders9/f: revision to pa# 202307202579, reduced scope updated lighting & finishes, added equipmenmt & power locations, revised room layout, added structural details.
Details
Permit
202309287617
Permit issued
Nov 9, 2023
Final sign-off
Apr 22, 2024

9/f: revision to pa# 202307202579, reduced scope updated lighting & finishes, added equipmenmt & power locations, revised room layout, added structural details.

Open the permit page

Aug 29, 2023Never finaled
issued Sep 2023, no final
2 Folsom StSwinerton Builders12/f - interior ti incudes new non-load bearing partitions, lighting, & finishes. mep deferred.
Details
Permit
202308295512
Permit issued
Sep 21, 2023

12/f - interior ti incudes new non-load bearing partitions, lighting, & finishes. mep deferred.

Open the permit page

$717,000
Dec 16, 2021Completed
final sign-off May 2022
2 Folsom StSwinerton Builders8th fl - revision to pa 2021-0923-9023 additional structural scope and new partitions
Details
Permit
202112164561
Permit issued
Feb 16, 2022
Final sign-off
May 3, 2022

8th fl - revision to pa 2021-0923-9023 additional structural scope and new partitions

Open the permit page

Dec 16, 2021Completed
final sign-off May 2022
2 Folsom StSwinerton Builders6th fl - revision to pa 2021-1007-0031 change of egress, additional structural scope and new partitions
Details
Permit
202112164571
Permit issued
Feb 16, 2022
Final sign-off
May 3, 2022

6th fl - revision to pa 2021-1007-0031 change of egress, additional structural scope and new partitions

Open the permit page

Jul 6, 2021Completed
final sign-off Aug 2023
560 Powell StHathaway Dinwiddie Co.replacement of existing elevator due to elevator failure. scope includes modernized elevator in existing shaft and new machine room per code requirements. this is a barrier removal project. mep and life safety deferred permits
Details
Permit
202107063810
Permit issued
Sep 10, 2021
Final sign-off
Aug 23, 2023

replacement of existing elevator due to elevator failure. scope includes modernized elevator in existing shaft and new machine room per code requirements. this is a barrier removal project. mep and life safety deferred permits

Open the permit page

$100,000
Oct 15, 2020Never finaled
filed Oct 2020, never issued
2209 Van Ness Avreplace existing retaing wall approximate 40 lf
Details
Permit
202010156611

replace existing retaing wall approximate 40 lf

Open the permit page

$5,000
Mar 6, 2020Never finaled
filed Mar 2020, never issued
79 New Montgomery Stpriority process - close and abate enforcement case #2015-013579. the project proposes to change the use of 77-79 new montgomery from the last legal use of general office to post-secondary educational institutional. work includes security cameras, new bike parking, exterior clean up.
Details
Permit
202003066418

priority process - close and abate enforcement case #2015-013579. the project proposes to change the use of 77-79 new montgomery from the last legal use of general office to post-secondary educational institutional. work includes security cameras, new bike parking, exterior clean up.

Open the permit page

$65,000
Mar 2, 2020Never finaled
filed Mar 2020, never issued
601 Brannan Stpriority process - pursuant to case #2008.0586, change use of 601 brannan to last legal use of general office to post-secondary educational institutinal. abate/close enforcement cases 9114 & 2015-012595. conditional use authorization requested to institute post-secondary educational services use in
Details
Permit
202003025891

priority process - pursuant to case #2008.0586, change use of 601 brannan to last legal use of general office to post-secondary educational institutinal. abate/close enforcement cases 9114 & 2015-012595. conditional use authorization requested to institute post-secondary educational services use in

Open the permit page

$75,000
Feb 28, 2020Never finaled
filed Feb 2020, never issued
180 New Montgomery Stpriority process - abate / close enforcement case# 2015-013540. pursuant to case# 20080586, change of use from last legas use of general office to a post-secondary institution use. permit includes exterior work such as legalization of windows & panel replacement. bike parking added in bldg.
Details
Permit
202002285773

priority process - abate / close enforcement case# 2015-013540. pursuant to case# 20080586, change of use from last legas use of general office to a post-secondary institution use. permit includes exterior work such as legalization of windows & panel replacement. bike parking added in bldg.

Open the permit page

$85,000
Nov 12, 2019Never finaled
issued Nov 2019, no final
550 Terry A Francois BlBcci Construction Company6th floor: structural only deferred submittal for operable partition anchorage. reference pa# 2019-1028-5758
Details
Permit
201911127088
Permit issued
Nov 26, 2019

6th floor: structural only deferred submittal for operable partition anchorage. reference pa# 2019-1028-5758

Open the permit page