Ronald Wilson
- License
- 20862
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- engineer
- Firm
- Rosendin Electric
- Based in
- San Jose
- On San Francisco permits
- Oct 2019 to Sep 2020
5 permits since 2000 (engineer on 5 permits): 4 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Webcor Construction Lp (4), Walsh Construction Company Ii Llc
- Architects
- Daniel Pamperin (4), Brennan Cox (2), Theodore Mahl
- Engineers
- Lincon M Saki (4), Todd Kuchta (4), Mark Koenigs, Tony H Shakouri
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 4
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 3, 2020 | Never finaled issued Aug 2021, no final | 400 Paul Av | Walsh Construction Company Ii Llc | revision to pa 201603293329: 1.relocate main entry on level 1, add elevator control room, add point of entry rooms to basement level of bldg b, and add architectural details. (see individual sheets for additional comments)Details
revision to pa 201603293329: 1.relocate main entry on level 1, add elevator control room, add point of entry rooms to basement level of bldg b, and add architectural details. (see individual sheets for additional comments) | |
| Oct 9, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | 39th fl - construction of new non structural partitions, acoustical grid & tile and gyp board ceilings, light fixtures, millwork and finishesDetails
39th fl - construction of new non structural partitions, acoustical grid & tile and gyp board ceilings, light fixtures, millwork and finishes | $1,500,000 |
| Oct 9, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | 41st floor: construction of new non structural partitions, acoustical grid tile and gyp board ceilings, light fixtures, millwork, and finishes. n/a for maherDetails
41st floor: construction of new non structural partitions, acoustical grid tile and gyp board ceilings, light fixtures, millwork, and finishes. n/a for maher | $1,500,000 |
| Oct 9, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | 36th fl - construction of new non structural partitions, acoustical grid & tile and gyp board ceilings, light fixtures, millwork and finishesDetails
36th fl - construction of new non structural partitions, acoustical grid & tile and gyp board ceilings, light fixtures, millwork and finishes | $1,500,000 |
| Oct 9, 2019 | Completed final sign-off Dec 2021 | 250 Howard St | Webcor Construction Lp | 40th floor: construction of new non structural partitions, acoustical grid tile and gyp board ceilings, light fixtures, millwork, and finishes. n/a for maherDetails
40th floor: construction of new non structural partitions, acoustical grid tile and gyp board ceilings, light fixtures, millwork, and finishes. n/a for maher | $1,500,000 |